The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$111,255,190

Department of Transportation·Federal Highway Administration

to TEXAS DEPARTMENT OF TRANSPORTATION

ACTION DATE2026-04-17·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22630000Y001TX2026626_069
Award description

PROJECT TITLE: HIGHWAY IMPROVEMENT ON IH 410. :::: PROJECT DESCRIPTION: IH 410 AT US 281 AND SAN PEDRO; OPERATIONAL IMPROVEMENTS TO INCLUDE DIRECT CONNECTOR IMPROVEMENT FROM US 281 TO IH 410 WEST BOUND; RAMP REVISIONS, FRONTAGE ROAD AND INTERSECTION IMPROVEMENTS.

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds operational improvements and direct connector construction on Interstate 410 at US 281 in Texas, including ramp and frontage road revisions.

Sub-sectors
highway-infrastructurefhwa-formula-grantoperational-improvements
Why this matters

Addresses congestion and traffic flow at a major urban interchange in San Antonio, improving regional mobility and economic connectivity.

Supply-chain signal

Drives demand for construction materials, engineering services, and heavy equipment suppliers supporting highway infrastructure projects.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002119.

Period of performance
Start
2026-04-07
End
2036-11-03
Status
activein 3823 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$111.3M Department of Transportation — The Buildout — The Buildout