$57,020,234
to ALASKA DEPARTMENT OF TRANSPORTATION & PUBLIC FACILITIES
PROJECT TITLE: DALTON HWY MP 289-305 REHABILITATION :::: PROJECT DESCRIPTION: REV 8/2017REHABILITATE AND WIDEN THE DALTON HIGHWAY BETWEEN MILEPOSTS 289 AND 305. PROJECT WORK WILL INCLUDE MINOR REALIGNMENTS, GRADE RAISES, TURNOUTS, ROADSIDE HARDWARE AND DRAINAGE IMPROVEMENTS.
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Rehabilitate and widen the Dalton Highway in Alaska between mileposts 289–305, including realignments, drainage, and safety improvements.
Critical infrastructure maintenance for Alaska's primary industrial corridor serving oil, mining, and remote communities.
Drives demand for heavy construction equipment, asphalt, concrete, and engineering services in remote Alaska logistics.
Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002132.
- —PROJECT TITLE: PARKS HWY MP 315-325 RECONSTRUCTION :::: PROJECT DESCRIPTION: REV 03/2020: RECONSTRUCT THE PARKS HIGHWAY FROM MILEPOST 319 TO MILEPOST 325 (FNSB BOUNDARY), INCLUDING REPLACEMENT OF LITTLE GOLDSTREAM CREEK BRIDGE NO. 678 AT MILEPOST 315. PROJECT WILL INCLUDE BRIDGE WORK, ROADSIDE HARDWARE, DRAINAGE IMPROVEMENTS AND UTILITIES.REV 04/2018: PARKS HIGHWAY, NEAR NENANA.$38.0M
- —PROJECT TITLE: GLENN HWY: PARKS HWY TO S. INNER SPRINGER LP. (PHASE II) :::: PROJECT DESCRIPTION: THIS PROJECT WILL CONSTRUCT, WIDEN, AND ADD FRONTAGE ROADS TO THE GLENN HIGHWAY. IT ALSO INCLUDES ROADSIDE HARDWARE, UTILITIES, AND DRAINAGE, INTERSECTION, AND ADA IMPROVEMENTS. THIS PROJECT WILL CONSTRUCT THE SECOND PHASE OF THE GLENN HWY: MP 34-42 PARKS TO OLD GLENN PROJECT.$36.5M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier ASST_NON_693JJ22330000Y001AK0656005_069.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.