The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$37,996,231

Department of Transportation·Federal Highway Administration

to ALASKA DEPARTMENT OF TRANSPORTATION & PUBLIC FACILITIES

WORK BEGAN·LATEST ACTION·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22530000Y001AK0A45028_069
Award description

PROJECT TITLE: PARKS HWY MP 315-325 RECONSTRUCTION :::: PROJECT DESCRIPTION: REV 03/2020: RECONSTRUCT THE PARKS HIGHWAY FROM MILEPOST 319 TO MILEPOST 325 (FNSB BOUNDARY), INCLUDING REPLACEMENT OF LITTLE GOLDSTREAM CREEK BRIDGE NO. 678 AT MILEPOST 315. PROJECT WILL INCLUDE BRIDGE WORK, ROADSIDE HARDWARE, DRAINAGE IMPROVEMENTS AND UTILITIES.REV 04/2018: PARKS HIGHWAY, NEAR NENANA.

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds reconstruction of Alaska's Parks Highway from milepost 315-325, including bridge replacement and drainage improvements.

Sub-sectors
highway-reconstructionbridge-replacementstate-highway-formula-grant
Why this matters

Parks Highway connects Alaska's major population and economic centers; improved infrastructure supports regional commerce and connectivity.

Supply-chain signal

Drives demand for construction materials (concrete, asphalt, aggregate), heavy equipment rental, and engineering services in Alaska.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-14. Cost: $0.011133.

Period of performance
Start
End
2030-04-30
Status
activein 1400 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$38.0M Department of Transportation — The Buildout — The Buildout