$50,134,416

Smithsonian Institution·Smithsonian Institution

to GRUNLEY CONSTRUCTION CO., INC.

otheractiveONGOING · MOD OF 2023 CONTRACT
WORK BEGAN2023-09-27·LATEST ACTION2026-04-24·SOURCEUSASPENDING·SOURCE IDCONT_AWD_33330223CF0010533_3300_-NONE-_-NONE-
Award description

HMSG REVITALIZE SCULPTURE GARDEN

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Obligation increment on the Hirshhorn Museum Sculpture Garden revitalization project that began in 2023.

Sub-sectors
museum-renovationfederal-constructioncultural-preservation
Why this matters

Major renovation of the Smithsonian's iconic Sculpture Garden preserves public access to nationally significant art.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-10. Cost: $0.015694.

Period of performance
Start
2023-09-27
End
2026-09-30
Status
activein 92 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$50.1M Smithsonian Institution — The Buildout — The Buildout