The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$45,598,172

Department of the Interior·National Park Service

to RECORD STEEL AND CONSTRUCTION, INC.

environmentactiveONGOING · MOD OF 2025 CONTRACT
WORK BEGAN2025-05-13·LATEST ACTION2026-05-08·SOURCEUSASPENDING·SOURCE IDCONT_AWD_140P2025C0040_1443_-NONE-_-NONE-
Award description

YELL 310533 REHABILITATE AND IMPROVE OLD FAITHFUL WATER TREATMENT SYSTEM GAOA

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Repair and upgrade the Old Faithful water treatment system in Yellowstone National Park.

Sub-sectors
nps-infrastructurewater-treatmentgaoa-funding
Supply-chain signal

Drives procurement of water treatment equipment, construction materials, and specialty infrastructure services.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-11. Cost: $0.009284.

Period of performance
Start
2025-05-13
End
2028-09-30
Status
activein 823 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$45.6M Department of the Interior — The Buildout — The Buildout