$45,598,172
Department of the Interior·National Park Service
to RECORD STEEL AND CONSTRUCTION, INC.
WORK BEGAN2025-05-13·LATEST ACTION2026-05-08·SOURCEUSASPENDING·SOURCE IDCONT_AWD_140P2025C0040_1443_-NONE-_-NONE-
Award description
YELL 310533 REHABILITATE AND IMPROVE OLD FAITHFUL WATER TREATMENT SYSTEM GAOA
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
The Buildout's read
What the model surfaced from this award
Confidence: high
In plain English
Repair and upgrade the Old Faithful water treatment system in Yellowstone National Park.
Sub-sectors
nps-infrastructurewater-treatmentgaoa-funding
Supply-chain signal
Drives procurement of water treatment equipment, construction materials, and specialty infrastructure services.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-11. Cost: $0.009284.
Period of performance
Start
2025-05-13
End
2028-09-30
Status
activein 823 days
Other awards from this recipient
Sources
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_140P2025C0040_1443_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.