$43,203,128
GLEN ELDER DAM SPILLWAY CHUTE REPLACEMENT, GLEN ELDER UNIT, SOLOMON DIVISION, PICK-SLOAN MISSOURI BASIN PROGRAM, KANSAS
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Another $43.2M obligation toward the Glen Elder Dam Spillway Chute replacement project in Kansas.
Critical Reclamation infrastructure begun in 2021 for drought/flood management; obligations extending past original June 2025 completion date.
Large construction project generates demand for concrete, heavy equipment, and engineering services in Kansas/Missouri Basin.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-12. Cost: $0.017538.
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_140R6021C0015_1425_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.