$34,569,675
to HARTMAN-WALSH PAINTING COMPANY
JOHN W. KEYS III PUMP-GENERATING PLANT DISCHARGE TUBE COATING-LINING REHABILITATION
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Coating and lining rehabilitation of discharge tube at John W. Keys III pump-generating facility, an ongoing 2020 project.
Maintains critical water infrastructure supplying irrigation and drinking water across western states; prevents catastrophic equipment failure.
Specialized industrial coatings and coating contractors are essential for aging water-infrastructure rehabilitation and long-term asset protection.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-16. Cost: $0.012358.
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_140R1020C0012_1425_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.