The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$34,569,675

Department of the Interior·Bureau of Reclamation

to HARTMAN-WALSH PAINTING COMPANY

environmentexpiring · 72d· period of performance ends in 72 daysONGOING · MOD OF 2020 CONTRACT
WORK BEGAN2020-09-01·LATEST ACTION2026-04-30·SOURCEUSASPENDING·SOURCE IDCONT_AWD_140R1020C0012_1425_-NONE-_-NONE-
Award description

JOHN W. KEYS III PUMP-GENERATING PLANT DISCHARGE TUBE COATING-LINING REHABILITATION

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: medium
In plain English

Coating and lining rehabilitation of discharge tube at John W. Keys III pump-generating facility, an ongoing 2020 project.

Sub-sectors
water-infrastructure-rehabilitationfederal-facility-m&ohydroelectric-facility-maintenance
Why this matters

Maintains critical water infrastructure supplying irrigation and drinking water across western states; prevents catastrophic equipment failure.

Supply-chain signal

Specialized industrial coatings and coating contractors are essential for aging water-infrastructure rehabilitation and long-term asset protection.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-16. Cost: $0.012358.

Period of performance
Start
2020-09-01
End
2026-09-10
Status
expiring · 72din 72 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.