CITY OF LONG BEACH
...UEIDBSHZ2LVFAE6·Profile updated 2026-06-04
Awards tracked
1
Total amount
$283.4M
Date range
2026-06-03 → 2026-06-03
Primary sector
Volume
—
$/month, last 24
About this recipient
CITY OF LONG BEACH has received $283.4M in tracked federal funding across the ingest window.
The largest single source of funding is Department of Transportation, which dominates the recipient's federal portfolio. We surface the full breakdown of contracts and grants below.
A longer, LLM-generated profile becomes available for the top entities by total $ awarded. We do not take editorial direction from recipients.
Portfolio by sector
Sectors classified by LLM on each award.
- transportation1 award$283.4M 100%
Portfolio status
Based on each award's period of performance.
Active
1
active100% of awards
Expiring (≤90d)
0
expiring · 30d0% of awards
Expired
0
expired0% of awards
No POP
0
—0% of awards
Top awarding agencies
Department of Transportation
$283.4M 100%
Based on 1 awards totaling $283,375,812.
Awards
Top 1 by amount
| Action date | Recipient | Agency | Amount | Description | Sector | Status |
|---|---|---|---|---|---|---|
| 2026-06-03 | CITY OF LONG BEACH | Department of Transportation | $283,375,812 | AWARD PURPOSE THE PROJECT WILL COMPLETE THE PIER B ONDOCK RAIL SUPPORT FACILITY PROGRAM BY COMPLETING THE NORTH RAIL YARD EXPANSION AND THE SOUTH RAIL YARD EXPANSION. THE NORTH RAIL YARD EXPANSION WILL CONSTRUCT TWO NEW MAINLINE TRACKS FIVE NEW APPROXIMATELY 10000 FOOT RECEIVING AND DEPARTURE TRACKS EXTENDING FROM WEST OF THE DOMINGUEZ CHANNEL TO THE PICO AVENUE RAIL CORRIDOR AND 28 NEW STORAGE TRACKS NORTH OF THE EXISTING PIER B YARD. IT ALSO INCLUDES ACTIVE AT GRADE WARNING DEVICES AND RAILROAD PREEMPTION WITH A NEW TRAFFIC SIGNAL AT PIER B STREET. THE SOUTH RAIL YARD EXPANSION WILL ADD SEVEN NEW APPROXIMATELY 3000 FOOT STORAGE TRACKS LENGTHEN AND REHABILITATE SEVEN EXISTING APPROXIMATELY 3000 FOOT STORAGE TRACKS CONSTRUCT TWO NEW TRACKS IN THE PICO AVENUE RAIL CORRIDOR RECONFIGURE TRACKS NEAR PIER D STREET AND CONSTRUCT A NEW COMPRESSED AIR FACILITY. ACTIVITIES TO BE PERFORMED ELEMENT 1 CONSTRUCTION PHASE ARCHITECTURAL AND ENGINEERING A AND E. ENGINEERING DURING CONSTRUCTION MANAGEMENT PROJECT MANAGEMENT AND CONSTRUCTION SUPPORT DURING BID AND AWARD CONSTRUCTION AND CLOSEOUT. ELEMENT CONSTRUCTION CONSTRUCT TWO NEW MAINLINE TRACKS FIVE NEW APPROXIMATELY 10000 FOOT RECEIVING AND DEPARTURE TRACKS EXTENDING FROM WEST OF THE DOMINGUEZ CHANNEL TO THE PICO AVENUE RAIL CORRIDOR 28 NEW STORAGE TRACKS NORTH OF THE EXISTING PIER B YARD CONSTRUCT THE ROADWAY KNUCKLE AT HARBOR AVENUE AND 11TH STREET RECONSTRUCTED EXISTING PIER B RAIL YARD BY ADDING SEVEN NEW APPROXIMATELY 3000 FOOT STORAGE TRACKS AND LENGTHEN AND REHABILITATE SEVEN EXISTING APPROXIMATELY 3000 FOOT STORAGE TRACKS CONSTRUCT TWO NEW TRACKS IN THE PICO AVENUE RAIL CORRIDOR RECONFIGURE MEAD YARD LADDER AND LEAD TRACK ACROSS ANAHEIM WAY AND ADD ACTIVE AT GRADE WARNING DEVICES AND RAILROAD PRE EMPTION WITH A NEW TRAFFIC SIGNAL AT PIER B STREET RECONFIGURE TRACKS NEAR PIER D STREET AND CONSTRUCT A NEW COMPRESSED AIR FACILITY WITH ASSOCIATED PIPING WITHIN THE RAIL YARD. APPROXIMATE TOTAL PROJECT QUANTITIES INCLUDE 175000 FEET OF NEW TRACK 150 NEW ITEMS OF SPECIAL TRACK WORK AND 150REMOTELY CONTROLLED POWER SWITCH OPERATORS. DELIVERABLES EXPECTED OUTCOMES FROM PAGE 10 SCHEDULE G OF THE GRANT AGREEMENT INTENDED BENEFICIARY CITY OF LONG BEACH. SUBRECIPIENT ACTIVITIES NONE. MEASURE FREIGHT MOVEMENTS. PROJECTED OUTCOME AN INCREASE IN THE TOTAL NUMBER OF CONTAINERS MOVED BY ON DOCK RAIL. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS A TABLE THAT SHOWS THE TOTAL NUMBER OF CONTAINERS AND THE TOTAL NUMBER OF CONTAINERS MOVED BY ON DOCK RAIL IN THE STUDY AREA. MEASUREMENT FREQUENCY ANNUAL. MEASURE GROSS TONS. PROJECTED OUTCOME AN INCREASE IN CARGO TONNAGE MOVED THROUGH MARINE TERMINALS. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS THE TOTAL NUMBER OF GROSS SHORT TONS THAT MOVED THROUGH THE STUDY ARE. MEASUREMENT FREQUENCY ANNUAL. | — | active |
Sources
USAspending.gov — all awards for this UEI →SAM.gov entity registration →
Profile compiled from publicly available USAspending.gov records, ingested and entity-resolved by The Buildout's pipeline.