$345,040,000
SOUTHWEST BORDER BARRIER DESIGN/BUILD PROJECT ELC-2
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Design and construction of barrier infrastructure for the southwest border under the ELC-2 project.
Part of CBP's ongoing border security modernization; $345M commitment signals sustained federal investment in physical border infrastructure.
Demand for construction materials, engineering services, and labor in southwest border region; potential for subcontractor network in concrete, steel, and heavy equipment.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-19. Cost: $0.002667.
- 2026-03-09YUM-2 VERTICAL BORDER AND WATERBORNE BARRIER CONSTRUCTION$1.7B
- 2026-05-13CONSTRUCT VERTICAL BORDER BARRIER$1.6B
- 2026-03-10CONSTRUCTION BORDER BARRIER EL CENTRO, CA$1.2B
- 2026-03-05BORDER WALL CONSTRUCTION - VERTICAL BARRIER, BIG BEND TEXAS SECTOR (BBT-2)$1.2B
- 2026-04-26SW BORDER CONSTRUCTION - SAN DIEGO$847.0M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_70B01C26F00000319_7014_70B01C26D00000012_7014.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.