$847,040,000
Department of Homeland Security·U.S. Customs and Border Protection
justiceactive
WORK BEGAN2026-04-26·LATEST ACTION2026-04-26·SOURCEUSASPENDING·SOURCE IDCONT_AWD_70B01C26F00000311_7014_70B01C26D00000012_7014
Award description
SW BORDER CONSTRUCTION - SAN DIEGO
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
The Buildout's read
What the model surfaced from this award
Confidence: high
In plain English
Construction of border barrier and related infrastructure along the southwest U.S.-Mexico border near San Diego.
Sub-sectors
border-enforcementcbp-infrastructuresouthwest-border
Why this matters
Part of ongoing federal effort to enhance physical border security and enforcement capacity at a major crossing point.
Supply-chain signal
Demand for construction materials, heavy equipment, and labor in southwest region; potential for local supplier engagement.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-17. Cost: $0.002592.
Period of performance
Start
2026-04-26
End
2028-08-31
Status
activein 793 days
Other awards from this recipient
- 2026-06-12CONSTRUCT VERTICAL BORDER BARRIER$2.8B
- 2026-06-02BORDER BARRIER DESIGN BUILD FOR BBT-5$2.6B
- 2026-03-09YUM-2 VERTICAL BORDER AND WATERBORNE BARRIER CONSTRUCTION$1.7B
- 2026-03-10CONSTRUCTION BORDER BARRIER EL CENTRO, CA$1.2B
- 2026-05-28BORDER WALL CONSTRUCTION - VERTICAL BARRIER, BIG BEND TEXAS SECTOR (BBT-2)$1.2B
Sources
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_70B01C26F00000311_7014_70B01C26D00000012_7014.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.