$2,832,999,612
Department of Homeland Security·U.S. Customs and Border Protection
justiceactive
WORK BEGAN2025-12-17·LATEST ACTION2026-06-12·SOURCEUSASPENDING·SOURCE IDCONT_AWD_70B01C26F00000017_7014_70B01C26D00000012_7014
Award description
CONSTRUCT VERTICAL BORDER BARRIER
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
The Buildout's read
What the model surfaced from this award
Confidence: high
In plain English
Construct vertical border barrier infrastructure along the U.S. southern border under CBP contract.
Sub-sectors
border-securitycbp-infrastructurebarrier-construction
Why this matters
Multi-year, $1.6B border security infrastructure project reflects ongoing federal investment in physical barrier expansion and CBP operational capacity.
Supply-chain signal
Large-scale construction contract will drive demand for steel, concrete, materials handling, and construction labor in border-region supply chains.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-17. Cost: $0.002651.
Period of performance
Start
2025-12-17
End
2028-08-31
Status
activein 793 days
Other awards from this recipient
- 2026-06-02BORDER BARRIER DESIGN BUILD FOR BBT-5$2.6B
- 2026-03-09YUM-2 VERTICAL BORDER AND WATERBORNE BARRIER CONSTRUCTION$1.7B
- 2026-03-10CONSTRUCTION BORDER BARRIER EL CENTRO, CA$1.2B
- 2026-05-28BORDER WALL CONSTRUCTION - VERTICAL BARRIER, BIG BEND TEXAS SECTOR (BBT-2)$1.2B
- 2026-04-26SW BORDER CONSTRUCTION - SAN DIEGO$847.0M
Sources
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_70B01C26F00000017_7014_70B01C26D00000012_7014.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.