$35,207,242
to ALASKA DEPARTMENT OF TRANSPORTATION & PUBLIC FACILITIES
PROJECT TITLE: HNS HWY RECONSTRUCTION MILPOST 3.9-25.0 :::: PROJECT DESCRIPTION: REV 7/2015 REALIGN AND WIDEN, INCLUDING REPLACEMENT OF THE CHILKAT RIVER BRIDGE #0742. STRAIGHTEN CURVES TO MEET 55 MPH DESIGN SPEED. PROVIDE A LONG-TERM SOLUTION TO DEBRIS FLOW PROBLEMS NEAR MP 19 AND 23. ENHANCEMENTS ARE PLANNED ALONG THE CHILKAT RIVER AND AT THE MT. RIPINSKY TRAILHEAD.
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Reconstruct the Haines-Skagway highway in Alaska, replacing a bridge, widening road, and mitigating debris flow.
Addresses critical infrastructure aging and long-term environmental hazard vulnerabilities in rural Southeast Alaska.
Drives demand for construction contractors, concrete and asphalt suppliers, and heavy equipment vendors in Alaska.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-15. Cost: $0.013603.
- 2026-03-18PROJECT TITLE: DALTON HWY MP 289-305 REHABILITATION :::: PROJECT DESCRIPTION: REV 8/2017REHABILITATE AND WIDEN THE DALTON HIGHWAY BETWEEN MILEPOSTS 289 AND 305. PROJECT WORK WILL INCLUDE MINOR REALIGNMENTS, GRADE RAISES, TURNOUTS, ROADSIDE HARDWARE AND DRAINAGE IMPROVEMENTS.$57.0M
- —PROJECT TITLE: PARKS HWY MP 315-325 RECONSTRUCTION :::: PROJECT DESCRIPTION: REV 03/2020: RECONSTRUCT THE PARKS HIGHWAY FROM MILEPOST 319 TO MILEPOST 325 (FNSB BOUNDARY), INCLUDING REPLACEMENT OF LITTLE GOLDSTREAM CREEK BRIDGE NO. 678 AT MILEPOST 315. PROJECT WILL INCLUDE BRIDGE WORK, ROADSIDE HARDWARE, DRAINAGE IMPROVEMENTS AND UTILITIES.REV 04/2018: PARKS HIGHWAY, NEAR NENANA.$38.0M
- 2026-05-19PROJECT TITLE: RICHARDSON HIGHWAY MP 148-173 :::: PROJECT DESCRIPTION: CLARIFICATION 07/2018: RECONSTRUCT THE RICHARDSON HIGHWAY BETWEEN MP 148 AND 173, AND CONSTRUCT BRIDGE #0576. PROJECT WILL INCLUDE BRIDGE WORK, ROADSIDE HARDWARE, DRAINAGE IMPROVEMENTS AND UTILITY RELOCATIONS.$36.5M
- —PROJECT TITLE: GLENN HWY: PARKS HWY TO S. INNER SPRINGER LP. (PHASE II) :::: PROJECT DESCRIPTION: THIS PROJECT WILL CONSTRUCT, WIDEN, AND ADD FRONTAGE ROADS TO THE GLENN HIGHWAY. IT ALSO INCLUDES ROADSIDE HARDWARE, UTILITIES, AND DRAINAGE, INTERSECTION, AND ADA IMPROVEMENTS. THIS PROJECT WILL CONSTRUCT THE SECOND PHASE OF THE GLENN HWY: MP 34-42 PARKS TO OLD GLENN PROJECT.$36.5M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier ASST_NON_693JJ22230000Y001AK0956028_069.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.