$1,145,001,057
Department of Homeland Security·U.S. Customs and Border Protection
justiceactive
WORK BEGAN2026-03-18·LATEST ACTION2026-05-28·SOURCEUSASPENDING·SOURCE IDCONT_AWD_70B01C26F00000261_7014_70B01C26D00000013_7014
Award description
BORDER BARRIER CONSTRUCTION
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
The Buildout's read
What the model surfaced from this award
Confidence: high
In plain English
Construction of border barrier infrastructure along the U.S. southern border, scheduled for completion by August 2028.
Sub-sectors
border-securitycbp-infrastructureconstruction
Why this matters
Part of ongoing CBP efforts to enhance physical border security and enforcement capacity at the southern border.
Supply-chain signal
Large construction contract will drive demand for steel, concrete, heavy equipment, and construction labor in border-region supply chains.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-17. Cost: $0.002605.
Period of performance
Start
2026-03-18
End
2028-08-31
Status
activein 793 days
Other awards from this recipient
- 2026-05-28BORDER WALL & WATERBORNE BARRIER CONSTRUCTION$512.1M
- 2026-06-03LRT-3 WATERBORNE BARRIER CONSTRUCTION PROJECT$269.2M
- 2026-06-01BORDER WALL CONSTRUCTION - RIO GRANDE VALLEY SECTOR, TEXAS RGV-1 WATERBORNE BARRIER CONSTRUCTION$260.2M
- 2026-03-05BORDER WALL CONSTRUCTION - WATERBORNE, DEL RIO SECTOR TEXAS (DRT-4)$173.1M
Sources
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_70B01C26F00000261_7014_70B01C26D00000013_7014.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.