$512,079,200
BORDER WALL & WATERBORNE BARRIER CONSTRUCTION
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Construction of border wall and waterborne barrier infrastructure along the U.S. border.
Part of ongoing CBP border security modernization; $512M commitment signals sustained federal investment in physical border infrastructure through 2028.
Large construction contract will drive demand for steel, concrete, heavy equipment, and construction labor; supplier capacity constraints may affect timeline.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-17. Cost: $0.002625.
- 2026-05-28BORDER BARRIER CONSTRUCTION$1.1B
- 2026-06-03LRT-3 WATERBORNE BARRIER CONSTRUCTION PROJECT$269.2M
- 2026-06-01BORDER WALL CONSTRUCTION - RIO GRANDE VALLEY SECTOR, TEXAS RGV-1 WATERBORNE BARRIER CONSTRUCTION$260.2M
- 2026-03-05BORDER WALL CONSTRUCTION - WATERBORNE, DEL RIO SECTOR TEXAS (DRT-4)$173.1M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_70B01C26F00000207_7014_70B01C26D00000013_7014.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.