$269,200,000
LRT-3 WATERBORNE BARRIER CONSTRUCTION PROJECT
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Construction of waterborne barrier infrastructure (LRT-3 project) for U.S. Customs and Border Protection border security operations.
Part of CBP's physical border security infrastructure modernization; $269M commitment signals sustained federal investment in maritime/waterborne barrier technology.
Demand for specialized waterborne barrier materials, marine construction equipment, and engineering firms capable of large-scale border infrastructure deployment.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-19. Cost: $0.002701.
- 2026-05-28BORDER BARRIER CONSTRUCTION$1.1B
- 2026-05-28BORDER WALL & WATERBORNE BARRIER CONSTRUCTION$512.1M
- 2026-06-01BORDER WALL CONSTRUCTION - RIO GRANDE VALLEY SECTOR, TEXAS RGV-1 WATERBORNE BARRIER CONSTRUCTION$260.2M
- 2026-03-05BORDER WALL CONSTRUCTION - WATERBORNE, DEL RIO SECTOR TEXAS (DRT-4)$173.1M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_70B01C26F00000148_7014_70B01C26D00000013_7014.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.