The BuildoutBeta

$257,269,309

Department of the Interior·Bureau of Reclamation

to NW CONSTRUCTION, INC

energyactive
ACTION DATE·SOURCEUSASPENDING·SOURCE IDCONT_AWD_140R2025C0004_1425_-NONE-_-NONE-
Award description

THE WORK REQUIRED IS FOR PHASE II OF B.F. SISK DAM SOD MODIFICATIONS.

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Phase II modifications to B.F. Sisk Dam's spillway of dam structure and operations.

Sub-sectors
water-infrastructuredam-operations
Why this matters

Maintains critical water infrastructure for California's Central Valley irrigation and hydroelectric generation capacity.

Supply-chain signal

Signals sustained demand for heavy construction and civil engineering services in water resource management.

Generated by award_classification v1.0.0 via claude-haiku-4-5-20251001 on 2026-05-13. Cost: $0.001107.

Period of performance
Start
2025-03-20
End
2029-02-07
Status
activein 1000 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.