$257,269,309
Department of the Interior·Bureau of Reclamation
energyactive
ACTION DATE—·SOURCEUSASPENDING·SOURCE IDCONT_AWD_140R2025C0004_1425_-NONE-_-NONE-
Award description
THE WORK REQUIRED IS FOR PHASE II OF B.F. SISK DAM SOD MODIFICATIONS.
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
The Buildout's read
What the model surfaced from this award
Confidence: high
In plain English
Phase II modifications to B.F. Sisk Dam's spillway of dam structure and operations.
Sub-sectors
water-infrastructuredam-operations
Why this matters
Maintains critical water infrastructure for California's Central Valley irrigation and hydroelectric generation capacity.
Supply-chain signal
Signals sustained demand for heavy construction and civil engineering services in water resource management.
Generated by award_classification v1.0.0 via claude-haiku-4-5-20251001 on 2026-05-13. Cost: $0.001107.
Period of performance
Start
2025-03-20
End
2029-02-07
Status
activein 1000 days
Sources
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_140R2025C0004_1425_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.