The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$93,380,730

Department of the Interior·Bureau of Reclamation

to NW CONSTRUCTION, INC

environmentactiveONGOING · MOD OF 2025 CONTRACT
WORK BEGAN2025-07-15·LATEST ACTION2026-04-28·SOURCEUSASPENDING·SOURCE IDCONT_AWD_140R2025C0006_1425_-NONE-_-NONE-
Award description

IMPROVE OPERATIONS AT ARROYO CANAL FISH SCREEN/SACK DAM FISH PASSAGE PROJECT

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Modification to ongoing project improving fish passage and operations at Arroyo Canal fish screen and sack dam, which began in July 2025.

Sub-sectors
water-infrastructurefish-passageirrigation-operations
Why this matters

Supports Western water management and endangered species recovery under Reclamation's mandate to balance irrigation and environmental restoration.

Supply-chain signal

Signals sustained demand for specialized hydraulic engineering, fish-passage equipment, and dam modernization contractors in the Southwest.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-29. Cost: $0.002762.

Period of performance
Start
2025-07-15
End
2028-07-09
Status
activein 740 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$93.4M Department of the Interior — The Buildout — The Buildout