$211,927,514
to CADDELL CONSTRUCTION CO. (DE), LLC
CONSTRUCTION NEW CONSULATE COMPOUND
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Construction of a new U.S. consulate compound, with the latest obligation issued in April 2026 on a project that began in September 2021.
Consulate infrastructure strengthens U.S. diplomatic presence and operational capacity in strategic regions; multi-year construction reflects long-term commitment to foreign engagement.
Large construction contract sustains demand for building materials, skilled labor, and project management services over a 5-year execution window.
Consulate expansion signals U.S. commitment to sustained diplomatic and economic engagement in regions where China is also expanding influence.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-21. Cost: $0.002956.
- 2026-06-02---------- COMMENTS: PLEASE RESUBMIT ONCE REVISED ACTION MEMO AND RFCA ARE FULLY CLEARED. COR: DANIEL REPLOGLE CONTRACTING OFFICER: ALLA WEINSTEIN APPROVED ACTION MEMO AND RFCA ARE ATTACHED. RFCA LINK: HTTPS://USDOS.SHAREPOINT.COM/:F:/S/PDCRFCA$698.9M
- 2026-05-11DESIGN AND CONSTRUCTION OF THE NEW EMBASSY COMPOUND LOCATED IN JUBA, SOUTH SUDAN.$614.7M
- 2026-04-30THE PURPOSE OF THIS AWARD IS TO PROVIDE CONSTRUCTION SERVICES FOR A NEW EMBASSY COMPOUND IN BRASILIA BRAZIL.$376.5M
- 2026-06-24DESIGN/BUILD NEW EMBASSY COMPOUND IN PORT OF SPAIN, TRINIDAD AND TOBAGO$353.6M
- 2026-06-15IGF::OT::IGF DESIGN AND CONSTRUCTION OF THE NEW EMBASSY COMPOUND IN ASHGABAT, TURKMENISTAN.$339.2M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_19AQMM21C0160_1900_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.