$2,594,040,000
BORDER BARRIER DESIGN BUILD FOR BBT-5
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Design and construction of border barrier infrastructure for the southern U.S. border under CBP's Build Back Better program.
A $2.6 billion commitment to physical border security infrastructure represents a major capital investment in CBP's enforcement capacity and southern border operations.
This design-build contract will drive demand for construction materials, heavy equipment, engineering services, and labor in border-region construction supply chains.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-04. Cost: $0.002700.
- 2026-03-09YUM-2 VERTICAL BORDER AND WATERBORNE BARRIER CONSTRUCTION$1.7B
- 2026-05-13CONSTRUCT VERTICAL BORDER BARRIER$1.6B
- 2026-03-10CONSTRUCTION BORDER BARRIER EL CENTRO, CA$1.2B
- 2026-05-28BORDER WALL CONSTRUCTION - VERTICAL BARRIER, BIG BEND TEXAS SECTOR (BBT-2)$1.2B
- 2026-04-26SW BORDER CONSTRUCTION - SAN DIEGO$847.0M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_70B01C26F00000405_7014_70B01C26D00000012_7014.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.