The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$216,707,246

Department of Transportation·Federal Highway Administration

to STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

WORK BEGAN·LATEST ACTION2026-03-03·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22330000Y001FL0041228_069
Award description

PROJECT TITLE: I-4 MANAGED LANES FROM KIRKMAN TO SR 434; ADD LANES & RECONSTRUCT; PRELIMINARY ENGINEERING & CONSTRUCTION; DB :::: PROJECT DESCRIPTION: I-4 MANAGED LANES FROM KIRKMAN TO SR 434; ADD LANES & RECONSTRUCT; PRELIMINARY ENGINEERING & CONSTRUCTION; DB

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds preliminary engineering and construction of managed lanes on Interstate 4 between Kirkman Road and SR 434 in Florida, including lane additions and roadway reconstruction.

Sub-sectors
highway-infrastructurefhwa-formula-grantmanaged-lanes
Why this matters

I-4 is a critical corridor serving the Orlando metro area and connecting Tampa to Daytona; managed lanes improve traffic flow and regional economic mobility.

Supply-chain signal

Drives demand for construction materials, engineering services, and heavy equipment suppliers in the Florida transportation sector.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-21. Cost: $0.002835.

Period of performance
Start
End
2042-08-30
Status
activein 5905 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$216.7M Department of Transportation — The Buildout — The Buildout