The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$116,380,166

Department of Transportation·Federal Highway Administration

to STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

WORK BEGAN·LATEST ACTION2026-04-17·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22330000Y001FLD721035_069
Award description

PROJECT TITLE: US 19 (SR 55) FROM NORTHSIDE DR TO NORTH OF CR 95;ADD LANES & RECONSTRUCT;CONSTRUCTION :::: PROJECT DESCRIPTION: US 19 (SR 55) FROM NORTHSIDE DR TO NORTH OF CR 95;ADD LANES & RECONSTRUCT;CONSTRUCTION

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds lane additions and reconstruction on US 19 (SR 55) in Florida between Northside Drive and CR 95.

Sub-sectors
highway-infrastructurefhwa-formula-grantstate-dot
Why this matters

Part of ongoing federal highway investment in state transportation networks to improve capacity and safety on major corridors.

Supply-chain signal

Drives demand for construction materials, heavy equipment, and labor in Florida's transportation sector.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-26. Cost: $0.002726.

Period of performance
Start
End
2027-02-24
Status
activein 237 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$116.4M Department of Transportation — The Buildout — The Buildout