$116,380,166
to STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
PROJECT TITLE: US 19 (SR 55) FROM NORTHSIDE DR TO NORTH OF CR 95;ADD LANES & RECONSTRUCT;CONSTRUCTION :::: PROJECT DESCRIPTION: US 19 (SR 55) FROM NORTHSIDE DR TO NORTH OF CR 95;ADD LANES & RECONSTRUCT;CONSTRUCTION
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Funds lane additions and reconstruction on US 19 (SR 55) in Florida between Northside Drive and CR 95.
Part of ongoing federal highway investment in state transportation networks to improve capacity and safety on major corridors.
Drives demand for construction materials, heavy equipment, and labor in Florida's transportation sector.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-26. Cost: $0.002726.
- 2026-04-02PROJECT TITLE: I275/SR93 FM N OF HFB TO N OF LOIS,SR60 FM KENNEDY TO N OF SPRUCE/TIA;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB :::: PROJECT DESCRIPTION: I275/SR93 FM N OF HFB TO N OF LOIS,SR60 FM KENNEDY TO N OF SPRUCE/TIA;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB$619.1M
- 2026-06-18PROJECT TITLE: SR23(FIRST COAST XWAY) FROM EAST OF CR16A (SPUR) TO EAST OF CR209 ;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB :::: PROJECT DESCRIPTION: SR23(FIRST COAST XWAY) FROM EAST OF CR16A (SPUR) TO EAST OF CR209 ;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB$278.2M
- 2026-03-03PROJECT TITLE: I-4 MANAGED LANES FROM KIRKMAN TO SR 434; ADD LANES & RECONSTRUCT; PRELIMINARY ENGINEERING & CONSTRUCTION; DB :::: PROJECT DESCRIPTION: I-4 MANAGED LANES FROM KIRKMAN TO SR 434; ADD LANES & RECONSTRUCT; PRELIMINARY ENGINEERING & CONSTRUCTION; DB$216.7M
- 2026-04-17PROJECT TITLE: I-4 @ SAND LAKE RD INTERCHANGE FROM E OF SR 528 TO W OF SR 435;INTERCHANGE IMPROVEMENT;CONSTRUCTION :::: PROJECT DESCRIPTION: I-4 @ SAND LAKE RD INTERCHANGE FROM E OF SR 528 TO W OF SR 435;INTERCHANGE IMPROVEMENT;CONSTRUCTION$198.1M
- 2026-03-03PROJECT TITLE: I-275 (SR 93) FROM S OF GANDY BLVD TO N OF 4TH ST N;ADD LANES & RECONSTRUCT;ADMINISTRATION;DB :::: PROJECT DESCRIPTION: I-275 (SR 93) FROM S OF GANDY BLVD TO N OF 4TH ST N;ADD LANES & RECONSTRUCT;ADMINISTRATION;DB$108.6M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier ASST_NON_693JJ22330000Y001FLD721035_069.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.