The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$198,130,242

Department of Transportation·Federal Highway Administration
ACTION DATE2026-04-17·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22230000Y001FLD521023_069
Award description

PROJECT TITLE: I-4 @ SAND LAKE RD INTERCHANGE FROM E OF SR 528 TO W OF SR 435;INTERCHANGE IMPROVEMENT;CONSTRUCTION :::: PROJECT DESCRIPTION: I-4 @ SAND LAKE RD INTERCHANGE FROM E OF SR 528 TO W OF SR 435;INTERCHANGE IMPROVEMENT;CONSTRUCTION

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds construction improvements to the I-4 and Sand Lake Road interchange in Florida between SR 528 and SR 435.

Sub-sectors
highway-infrastructureinterchange-improvement
Why this matters

Enhances critical regional transportation infrastructure and traffic flow in a major metropolitan area serving Orlando.

Supply-chain signal

Drives demand for construction materials, heavy equipment, engineering services, and asphalt/concrete suppliers in Florida.

Generated by award_classification v1.0.0 via claude-haiku-4-5-20251001 on 2026-05-14. Cost: $0.001250.

Period of performance
Start
End
2027-12-31
Status
activein 595 days
Sources
  • Award record ingested from usaspending. Source identifier ASST_NON_693JJ22230000Y001FLD521023_069.

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.