The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$79,890,509

Department of the Interior·Bureau of Reclamation

to S.J. LOUIS CONSTRUCTION, INC

environmentexpiredONGOING · MOD OF 2021 CONTRACT
WORK BEGAN2021-12-21·LATEST ACTION2026-05-06·SOURCEUSASPENDING·SOURCE IDCONT_AWD_140R4022C0001_1425_-NONE-_-NONE-
Award description

NAVAJO-GALLUP WATER SUPPLY PROJECT NAVAJO CODE TALKERS SUBLATERAL REACHES 12.1 & 12.2

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Latest obligation on the Navajo-Gallup Water Supply Project, a multi-year water infrastructure effort begun in 2021 serving the Navajo Nation.

Sub-sectors
water-infrastructurenavajo-nationreclamation
Why this matters

The project delivers long-term water security to the Navajo Nation; this 2026 modification sustains construction on critical sublateral reaches after four years of work.

Supply-chain signal

Ongoing construction spending signals sustained demand for heavy civil engineering, concrete, and water-conveyance materials through the scheduled 2025 completion.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-01. Cost: $0.002890.

Period of performance
Start
2021-12-21
End
2025-05-16
Status
expired410 days ago
Other awards from this recipient
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$79.9M Department of the Interior — The Buildout — The Buildout