$71,532,939
to S.J. LOUIS CONSTRUCTION, INC
NGWSP BLOCK 4A & 4B
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Latest obligation on the Next Generation Water Storage Project (NGWSP) Blocks 4A & 4B, a multi-year Bureau of Reclamation construction effort that began in March 2023.
Water storage infrastructure is critical to western U.S. drought resilience and agricultural/municipal supply security amid climate pressures.
Large construction contract signals sustained demand for heavy civil engineering, concrete, steel, and specialized water-infrastructure suppliers through early 2026.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-03. Cost: $0.002849.
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_140R4023C0005_1425_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.