Database / Awards
Federal awards
Every contract and grant ingested from USAspending.gov. Pick an agency to narrow the list; toggle Highest / Lowest to sort. Click any row to open the full award profile.
Sort by
Agency: National Aeronautics and Space Administration
Results
248 awards
Showing 51–100
| Action date | Recipient | Agency | Amount | Description | Sector |
|---|---|---|---|---|---|
| 2026-06-17 | AXIOM SPACE INC | National Aeronautics and Space Administration | $395,433,324 | EXPLORATION EXTRAVEHICULAR ACTIVITY SERVICE (XEVAS) ARTEMIS PROGRAM | aerospace |
| 2026-06-17 | SYNCOM SPACE SERVICES LLC | National Aeronautics and Space Administration | $391,749,366 | IGF::OT::IGF SYNERGY-ACHIEVING CONSOLIDATED OPERATIONS AND MAINTENANCE, COST PLUS INCENTIVE FEE, CORE WORK | aerospace |
| 2026-03-18 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $391,511,913 | WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) CORONAGRAPH THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASA S DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8) JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS (STEM) DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. | aerospace |
| 2026-05-22 | SOUTHWEST RESEARCH INSTITUTE | National Aeronautics and Space Administration | $384,632,648 | TAS::80 0120::TAS AS THE PRINCIPAL INVESTIGATOR (PI) INSTITUTION FOR THE MAGNETOSPHERIC MULTISCALE (MMS) INSTRUMENT SUITE SCIENCE TEAM (ISST), THE CONTRACTOR IS RESPONSIBLE FOR LEADING THE SOLVING MAGNETOSPHERIC ACCELERATION RECONNECTION AND TURBULENCE (SMART) TEAM THROUGH ALL MISSION PHASES. THE SCOPE OF WORK SHALL INCLUDE, BUT NOT BE LIMITED, TO THE FOLLOWING: - MANAGE THE SMART TEAM THROUGH PHASES B THROUGH E OF THE MMS MISSION, - DEFINING SCIENCE GOALS AND OBJECTIVES - ASSIST THE MMS PROJECT AND HQ SCIENCE MISSION DIRECTORATE HELIOPHYSICS DIVISION IN THE PREPARATION OF LEVEL 1 REQUIREMENTS FOR THE MMS MISSION - FLOW-DOWN OF TOP-LEVEL MISSION REQUIREMENTS TO THE APPROPRIATE ELEMENTS OF THE INSTRUMENT SUITE - DESIGN, FABRICATION, INTEGRATION, CALIBRATION, TESTING AND DELIVERY OF FOUR FULLY QUALIFIED, FLIGHT INSTRUMENT SUITES TO OBSERVATORY INTEGRATION AND TEST (I&T) PLUS SPARES - DESIGN, DEVELOPMENT, INTEGRATION AND TESTING OF THE SOC - SUPPORT OBSERVATORY-LEVEL I&T ACTIVITIES - PROVIDE SUSTAINING ENGINEERING AND I&T SUPPORT OF THE INSTRUMENT SUITES AFTER DELIVERY TO NASA - RESPONSIBILITY FOR THE ON-ORBIT OPERATION, HEALTH AND SAFETY OF THE INSTRUMENT SUITES - RESPONSIBILITY FOR OPERATING AND MAINTAINING THE SOC POST-LAUNCH - ESTABLISHING AND MANAGING SUBCONTRACTS WITH INSTRUMENT SUITE TEAM MEMBERS - ESTABLISHING AND MAINTAINING THE REQUIRED INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (ITAR) AND EXPORT CONTROL DOCUMENTATION NECESSARY FOR WORKING WITH ITS INTERNATIONAL TEAM MEMBERS - IMPLEMENTATION OF AN EPO PROGRAM FOR THE MMS MISSION | aerospace |
| 2026-05-07 | L3HARRIS TECHNOLOGIES, INC. | National Aeronautics and Space Administration | $372,589,497 | OPTICAL TELESCOPE ASSEMBLY (OTA) THIS CONTRACT PROVIDES FOR ALL EFFORTS AND RESPONSIBILITIES FOR THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO BUILD, REFURBISH, OR MODIFY THE OTA AS REQUIRED TO MEET THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) PERFORMANCE REQUIREMENTS. | aerospace |
| 2026-06-04 | LOCKHEED MARTIN INTEGRATED SYSTEMS, LLC | National Aeronautics and Space Administration | $360,197,522 | THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE. | aerospace |
| 2026-05-21 | AIR PRODUCTS AND CHEMICALS, INC | National Aeronautics and Space Administration | $352,593,356 | THIS DELIVERY ORDER IS ISSUED PURSUANT TO THE SCHEDULE OF SUPPLIES, CONTRACT PERIOD PRICING, OTHER PRICING OPTIONS, AND TERMS AND CONDITIONS OF CONTRACT 80KSC023DA010 FOR HELIUM AT KENNEDY SPACE CENTER. | aerospace |
| 2026-05-01 | ALCYON TECHNICAL SERVICES (ATS) JV, LLC | National Aeronautics and Space Administration | $351,035,114 | IGF::CL::IGF SYSTEMS ENGINEERING ADVANCED SERVICES (SEAS). UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE MISSION AND INSTRUMENT SYSTEMS ENGINEERING (M&ISE) SERVICES TO THE MISSION ENGINEERING&SYSTEMS ANALYSIS DIVISION AND RELATED APPLIED ENGINEERING AND TECHNOLOGY DIRECTORATE ORGANIZATIONS FOR THE FORMULATION AND IMPLEMENTATION OF FLIGHT AND GROUND SYSTEMS AS WELL AS DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES. | aerospace |
| 2026-06-17 | LOCKHEED MARTIN CORP | National Aeronautics and Space Administration | $349,817,273 | THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT. | aerospace |
| 2026-06-17 | L3HARRIS TECHNOLOGIES, INC. | National Aeronautics and Space Administration | $343,955,638 | GEOXO IMAGER (GXI) INSTRUMENT IMPLEMENTATION | aerospace |
| 2026-06-17 | PERATON INC. | National Aeronautics and Space Administration | $340,331,570 | THE ETIS III CONTRACT WILL PROVIDE ENVIRONMENTAL TEST AND INTEGRATION RELATED SERVICES FOR NASA GSFC ENGINEERING AND TECHNOLOGY DIRECTORATE (ETD) MECHANICAL SYSTEMS DIVISION AND RELATED ORGANIZATIONS FOR THE FORMULATION, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACEFLIGHT AND GROUND SYSTEM HARDWARE AND SOFTWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. | aerospace |
| 2026-03-19 | BASTION TECHNOLOGIES, INC. | National Aeronautics and Space Administration | $337,254,777 | SAFETY AND MISSION ASSURANCE SERVICES TO SUPPORT MARSHALL SPACE FLIGHT CENTER, STENNIS SPACE CENTER, KENNEDY SPACE CENTER AND MICHOUD ASSEMBLY FACILITY | aerospace |
| 2026-06-17 | LOCKHEED MARTIN CORPORATION | National Aeronautics and Space Administration | $325,884,715 | TAS::80 0114::TAS SOLAR ULTRAVIOLET IMAGER (SUVI) INSTRUMENT. THIS CONTRACT IS FOR THE DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, EVALUATE AND SUPPORT LAUNCH OF THE SOLAR ULTRAVIOLET IMAGER (SUVI) INSTRUMENT, SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE SUVI IS CLASSIFIED AS A NON-PRIMARY INSTRUMENT ON THE GOES-R SATELLITE AND HAS A RISK CLASSIFICATION OF B. THE SUVI INSTRUMENT PROVIDES A BROADBAND IMAGING IN THE EXTREME ULTRAVIOLET WAVELENGTH RANGE TO MONITOR THE ENTIRE DYNAMIC RANGE OF SOLAR FEATURES, FROM CORONAL HOLES TO FLARES, AS WELL AS THE ESTIMATE OF TEMPERATURE AND EMISSION MEASURE. THESE DATA ARE USED FOR GEOMAGNETIC STORM FORECASTS AND FORECASTS OF SOLAR ENERGETIC PARTICLE EVENTS RELATED TO FLARES. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR 4 FLIGHT MODELS B) ONE SUVI FLIGHT MODEL (FM) C) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) D) TWO SUVI EMULATORS (SUVIES) E) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) F) ONE GROUND PROCESSING DEVELOPMENT SYSTEM (GPDS) G) SPARES FOR THE FOUR FMS H) ALL ADDITIONAL SUVI MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT I) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS | aerospace |
| 2026-03-19 | ASTROBOTIC TECHNOLOGY INC | National Aeronautics and Space Administration | $314,011,569 | VOLATILES INVESTIGATING POLAR EXPLORATION ROVER (VIPER) DELIVERY | aerospace |
| 2026-05-21 | BAE SYSTEMS SPACE & MISSION SYSTEMS INC. | National Aeronautics and Space Administration | $307,797,674 | THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE). | aerospace |
| 2026-03-25 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $306,773,532 | MARS SCIENCE LABORATORY 67-8636 | aerospace |
| 2026-06-01 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $303,779,748 | SURFACE WATER AND OCEAN TOPOGRAPHY (SWOT) 83-16443 | aerospace |
| 2026-06-09 | LOCKHEED MARTIN CORP | National Aeronautics and Space Administration | $300,982,194 | RISK REDUCTION AND PHASE B EFFORT IN SUPPORT OF THE MARS ATMOSPHERIC AND VOLATILE EVOLUATION (MAVEN) PROJECT. THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE MAVEN PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM, WHICH CONSISTS OF THE INTEGRATED SPACECRAFT AND SCIENCE PAYLOADS IN ACCORDANCE WITH THE STATEMENT OF WORK. | aerospace |
| 2026-05-22 | AEROJET ROCKETDYNE, INC. | National Aeronautics and Space Administration | $286,584,371 | EXPLORATION UPPER STAGE ENGINES MSFC WILL PROCURE TEN (10) RL10 FLIGHT ENGINES FROM AEROJET ROCKETDYNE, INC. TO SUPPORT THE SPACE LAUNCH SYSTEM (SLS) EXPLORATION MISSIONS 2 AND 3 (EM-2 AND EM-3). EACH FLIGHT WILL REQUIRE A FOUR (4) ENGINE CLUSTER. ADDITIONALLY, TWO (2) SPARE ENGINES WILL BE PROCURED. CORRESPONDING TO THESE SPECIFIC RL10 ENGINES, NASA MSFC WILL PROCURE VEHICLE AND PROGRAM INTEGRATION SUPPORT, FLIGHT SUPPORT, AND HUMAN RATING COMPLIANCE REVIEW SUPPORT. | aerospace |
| 2026-06-17 | SPACE NETWORK SOLUTIONS LLC | National Aeronautics and Space Administration | $278,765,841 | THE PRINCIPAL PURPOSE OF THIS FOLLOW-ON CONTRACT IS TO PROVIDE MULTIDISCIPLINE ENGINEERING SUPPORT SERVICES. | aerospace |
| 2026-06-05 | AMENTUM TECHNOLOGY, INC. | National Aeronautics and Space Administration | $271,181,402 | IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 1 (MAINTENANCE). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR) CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED AIR, ELECTRICAL POWER DISTRIBUTION, POTABLE WATER) TECHNOLOGY DEVELOPMENT/ADMINISTRATION (E.G., FACILITY AUTOMATION SYSTEMS [FAS], DATA ACQUISITION SYSTEMS [DAS]) RESEARCH AND INSTITUTIONAL FACILITY MAINTENANCE (E.G., PREVENTIVE MAINTENANCE, TROUBLE CALLS, RELIABILITY CENTERED MAINTENANCE [RCM], FACILITY CONDITION ASSESSMENT [FCA]) AND FACILITY ENGINEERING (E.G., DESIGN, CONSTRUCTION, CONFIGURATION MANAGEMENT, TACTICAL ENGINEERING, PRESSURE SYSTEM RECERTIFICATION, PROJECT MANAGEMENT/PLANNING SUPPORT). | aerospace |
| 2026-05-20 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $269,744,348 | SPHEREX:AN ALL-SKY SPECTRAL SURVEY 71-700089 | aerospace |
| 2026-06-05 | AMENTUM TECHNOLOGY, INC. | National Aeronautics and Space Administration | $258,183,242 | IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 2 (OPERATIONS). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR); CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED AIR, ELECTRICAL POWER DISTRIBUTION, POTABLE WATER); TECHNOLOGY DEVELOPMENT/ADMINISTRATION (E.G., FACILITY AUTOMATION SYSTEMS [FAS], DATA ACQUISITION SYSTEMS [DAS]); RESEARCH AND INSTITUTIONAL FACILITY MAINTENANCE (E.G., PREVENTIVE MAINTENANCE, TROUBLE CALLS, RELIABILITY CENTERED MAINTENANCE [RCM], FACILITY CONDITION ASSESSMENT [FCA]); AND FACILITY ENGINEERING (E.G., DESIGN, CONSTRUCTION, CONFIGURATION MANAGEMENT, TACTICAL ENGINEERING, PRESSURE SYSTEM RECERTIFICATION, PROJECT MANAGEMENT/PLANNING SUPPORT). | aerospace |
| 2026-06-17 | ADNET SYSTEMS INC | National Aeronautics and Space Administration | $257,624,996 | SPACE AND EARTH SCIENCES DATA ANALYSIS (SESDA V) | aerospace |
| 2026-06-11 | TELEDYNE BROWN ENGINEERING, INC. | National Aeronautics and Space Administration | $257,238,581 | MARSHALL OPERATIONS SYSTEMS, SERVICES, AND INTEGRATION II (MOSSI II) | aerospace |
| 2026-06-04 | SCIENCE SYSTEMS AND APPLICATIONS, INC. | National Aeronautics and Space Administration | $257,186,996 | IGF::CL::IGF SUPPORT FOR ATMOSPHERES, MODELING, AND DATA ASSIMILATION (SAMDA) | aerospace |
| 2026-05-08 | RAYTHEON COMPANY | National Aeronautics and Space Administration | $257,032,016 | EARTH OBSERVING SYSTEM DATA AND INFORMATION SYSTEM (EOSDIS) EVOLUTION AND DEVELOPMENT (EED)-3 EOSDIS EED-3 SERVICES | aerospace |
| 2026-06-09 | MITCHELL VANTAGE SYSTEMS LLC | National Aeronautics and Space Administration | $254,855,719 | UNDER THIS SES III CONTRACT, THE SOFTWARE ENGINEERING DIVISION (SED) OF THE ENGINEERING AND TECHNOLOGY DIRECTORATE (ETD) PROVIDES QUALITY SOFTWARE PRODUCTS, SERVICES AND EXPERTISE TO ENSURE THE SUCCESS OF NASA MISSIONS AND STAKEHOLDERS. | aerospace |
| 2026-03-04 | HAMILTON SUNDSTRAND CORPORATIO | National Aeronautics and Space Administration | $247,963,522 | — | aerospace |
| 2026-05-08 | THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC | National Aeronautics and Space Administration | $246,031,358 | TIMED PHASE C/D/E LETTER CONTRACT | aerospace |
| 2026-06-17 | KBR WYLE SERVICES, LLC | National Aeronautics and Space Administration | $239,571,722 | THE OVERALL SCOPE OF THIS CONTRACT IS TO PROVIDE WALLOPS RANGE OPERATIONS AND MAINTENANCE SUPPORT SERVICES TRAINING COMMAND, CONTROL, COMMUNICATIONS, INFORMATION AND COMPUTER SYSTEMS SERVICES TESTING, MODIFYING AND INSTALLING COMMUNICATIONS AND ELECTRONIC SYSTEMS AT LAUNCH FACILITIES, LAUNCH CONTROL CENTERS AND TEST FACILITIES RANGE SUSTAINING ENGINEERING SERVICES, AND GROUND OPERATIONS SUPPORT. THIS EFFORT PROVIDES DIRECT CUSTOMER SUPPORT TO NASA WFF'S RANGE BY PROVIDING QUALIFIED PERSONNEL, EQUIPMENT, TOOLS, MATERIALS, VEHICLES, SPECIALIZED TEST EQUIPMENT, SUPERVISION, AND OTHER SERVICES. NASA'S WFF REQUIRES AN INNOVATIVE, INTEGRATED, FLEXIBLE AND EFFECTIVE MANAGEMENT APPROACH AND THE CONTRACTOR MUST PROVIDE TECHNICAL SUPPORT IN A PLANNED AND COORDINATED MANNER WHICH WILL ENSURE ESSENTIAL WALLOPS RANGE SUPPORT SYSTEMS ARE READY TO SUPPORT USER REQUIREMENTS, AND CAUSE NO IMPACT TO WALLOPS RANGE PROGRAM SCHEDULES DUE TO EQUIPMENT DEGRADATION, FAILURES, SYSTEM PROBLEMS OR REPRIORITIZATION OF PREEXISTING PROGRAM REQUIREMENTS. THE WIDE VARIETY OF SUPPORT SYSTEMS INVOLVES FLEXIBLE WORKLOAD PLANNING, COST MANAGEMENT, AND SCHEDULING OF RESOURCES TO IDENTIFY AND RESOLVE TECHNICAL SYSTEMS PROBLEMS. AVAILABLE CAPACITY FOR OPERATIONS, MAINTENANCE, AND SUSTAINING ENGINEERING MAY BE MADE AVAILABLE TO OTHER WFF ORGANIZATIONS WITH THE PERMISSION OF THE CONTRACTING OFFICER'S REPRESENTATIVE (COR), AND RMMO MANAGEMENT. INSTRUMENTATION SYSTEMS ARE PERMANENTLY LOCATED AT WFF, BERMUDA, AND IN ALASKA. IN ADDITION, MOBILE INSTRUMENTATION IS DEPLOYED TO LOCATIONS WORLDWIDE, INCLUDING BUT NOT LIMITED TO NORWAY KWAJALEIN ATOLL COQUINA, NC AUSTRALIA AND FRENCH GUIANA TO MEET RANGE CUSTOMER REQUIREMENTS. THE WALLOPS RANGE RECEIVES AND PROVIDES RANGE SUPPORT FROM AND TO VARIOUS AGENCIES. THE WALLOPS RANGE CONSTANTLY STRIVES TO ENSURE IT IS PREPARED TO ACCOMMODATE THE CURRENT AND FUTURE NEEDS OF ITS CUSTOMERS. TO THAT END, THE CONTRACTOR SHALL PURSUE ONGOING PREVENTIVE AND CORRECTIVE MAINTENANCE AND SUSTAINING ENGINEERING TASKS TO ENSURE READINESS AND MITIGATE THE EFFECTS OF OBSOLESCENCE OF ITS CURRENT RANGE EQUIPMENT AND SYSTEMS. THE CONTRACTOR SHALL ALSO WORK WITH RMMO IN COOPERATION WITH OTHER NASA CENTERS AND ORGANIZATIONS TO MAINTAIN AND SUSTAIN RANGE SYSTEMS TO COMMON STANDARDS. THE CONTRACTOR SHALL WORK WITH WFF ORGANIZATIONS AND PROVIDE OPERATIONAL REQUIREMENTS TO SUPPORT NEW ENGINEERING AND/OR TECHNOLOGY DEVELOPMENT ACTIVITIES APPROVED BY THE RANGE. SUCH ACTIVITIES ENABLE THE EVOLUTION OF THE RANGE ARCHITECTURE TO INCLUDE SPACE-BASED METRIC TRACKING, TELEMETRY, AND COMMAND RELAY, AND MISSION PLANNING SYSTEMS. THE CONTRACTOR SHALL ALSO PROVIDE OPERATIONAL REQUIREMENTS AND SUPPORT TRANSITIONING NEW ENGINEERING OR TECHNOLOGY DEVELOPMENTS TO OPERATIONS. | aerospace |
| 2026-04-24 | AMENTUM TECHNOLOGY, INC. | National Aeronautics and Space Administration | $239,357,873 | IGF::OT::IGF AEROSPACE TESTING AND FACILITIES OPERATIONS AND MAINTENANCE (ATOM-4) SERVICES (ARC WIND TUNNEL DIVISION AND THERMO-PHYSICS FACILITIES) CONTRACT. WORK TO BE PERFORMED INCLUDES TESTING AND FACILITY OPERATION, DEVELOPMENT PROJECTS, AND OPERATION OF SUPPORT FACILITIES, PERFORMANCE OF MAINTENANCE AND REPAIRS, AND ADMINISTRATION. | aerospace |
| 2026-04-22 | AEROJET ROCKETDYNE, INC. | National Aeronautics and Space Administration | $232,928,992 | IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS. | aerospace |
| 2026-05-20 | AMENTUM TECHNOLOGY, INC. | National Aeronautics and Space Administration | $229,987,269 | IGF::OT::IGF NASA AMES RESEARCH CENTER FACILITIES MAINTENANCE SUPPORT SERVICES CONTRACT THE NASA AMES FACILITIES MAINTENANCE SUPPORT SERVICES (AFSS) CONTRACT WILL PROVIDE THE PLANNING, IMPLEMENTATION, AND EXECUTION OF A COMPREHENSIVE RELIABILITY CENTERED MAINTENANCE (RCM) PROGRAM FOR ARC COVERING THE FOLLOWING TECHNICAL AREAS: ELECTRICAL, MECHANICAL, PLUMBING, PIPEFITTING, INFRASTRUCTURE UTILITY SERVICES HEATING, VENTILATING, AIR CONDITIONING, AND REFRIGERATION (HVAC/R) SERVICES ENVIRONMENTAL SERVICES MAINTENANCE ENGINEERING, GROUNDS MAINTENANCE, AND BUILDING TRADE SERVICES. THE CENTRAL FOCUS OF THE MAINTENANCE PROGRAM WILL BE THE IMPLEMENTATION OF RCM STRATEGIES TO DETERMINE THE OPTIMUM MIX OF PREVENTIVE, PROGRAMMED, PREDICTIVE, REACTIVE, AND PROACTIVE MAINTENANCE PRACTICES IN AN EFFORT TO PROVIDE EFFICIENT AND EFFECTIVE OPERATIONS AND MAINTENANCE SERVICES. THE FACILITIES SUPPORT SERVICES PROCURED THROUGH THIS EFFORT WILL PERFORM MAINTENANCE FOR ALL FACILITIES AT ARC, EXCEPT FOR NON-INFRASTRUCTURE RELATED SYSTEMS INSIDE WIND TUNNELS. | aerospace |
| 2026-06-02 | RSI-QUANTITECH JV LLC | National Aeronautics and Space Administration | $225,910,543 | MARSHALL ENGINEERING TECHNICIANS AND TRADES SUPPORT (METTS III) COVERS A WIDE RANGE OF ENGINEERING TECHNICIANS AND TRADE SKILLS TO PERFORM TESTING GROUND AND SPACE BASED RESEARCH TEST OPERATIONS DATA ANALYSIS INSTRUMENTATION CALIBRATION | aerospace |
| 2026-03-15 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $223,194,581 | ADVANCED MULTI-MISSION OPERATING SYSTEM (AMMOS) (93-107877) | aerospace |
| 2026-05-27 | LOCKHEED MARTIN CORPORATION | National Aeronautics and Space Administration | $220,359,527 | MULTI-SLIT SOLAR EXPLORER (MUSE) MISSION PHASE A | aerospace |
| 2026-04-30 | PERATON INC. | National Aeronautics and Space Administration | $220,065,715 | IGF::CT::IGF OPERATIONS AND MANAGEMENT OF THE NASA BALLOON FACILITY | aerospace |
| 2026-06-15 | CACI, INC. - FEDERAL | National Aeronautics and Space Administration | $218,954,503 | NASA CONSOLIDATED APPLICATION AND PLATFORM SERVICES (NCAPS) | aerospace |
| 2026-06-15 | OPR LLC | National Aeronautics and Space Administration | $211,394,175 | FLIGHT DYNAMICS SUPPORT SERVICES III (FDSS). THIS CONTRACT IS FOR, BUT NOT LIMITED TO SOFTWARE ENGINEERING SUPPORT, FLIGHT DYNAMICS FACILITY OPERATIONS SUPPORT, FLIGHT DYNAMICS SYSTEMS ENGINEERING SUPPORT&CONJUNCTION ASSESSMENTS. | aerospace |
| 2026-03-05 | GENERAL ELECTRIC COMPANY | National Aeronautics and Space Administration | $211,063,273 | THE REQUIREMENT IS TO ASSIST NASA IN ACCELERATING THE INTRODUCTION OF MEGAWATT CLASS EAP SYSTEMS INTO FUTURE AIRCRAFT PRODUCTS BY U.S. INDUSTRY. THIS EFFORT HELPS TO IDENTIFY CERTIFICATION GAPS, AND ADDRESS GAPS THROUGH GROUND TEST AND FLIGHT TESTS. | aerospace |
| 2026-06-15 | TELEDYNE BROWN ENGINEERING, INC. | National Aeronautics and Space Administration | $206,904,524 | IGF::OT::IGF LAUNCH VEHICLE/STAGES ADAPTER | aerospace |
| 2026-03-25 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $205,872,985 | MARS RECONNAISSANCE ORBITER: PHASE E 62-10131 | aerospace |
| 2026-06-11 | RAYTHEON COMPANY | National Aeronautics and Space Administration | $200,000,000 | PROVIDE THREE LANDIS FLIGHT INSTRUMENT UNITS AND RELATED SERVICES, INCLUDING THE DESIGN, ENGINEERING ANALYSES, DEVELOPMENT, FABRICATION, INTEGRATION, ALGORITHM DEVELOPMENT, TEST, EVALUATION, DELIVERY, AND SUPPORT FOR THE LANDIS | aerospace |
| 2026-06-09 | REGENTS OF THE UNIVERSITY OF CALIFORNIA, THE | National Aeronautics and Space Administration | $199,537,577 | TIME HISTORY OF EVENTS&MACROSCALE INTERACTIONS DURING SUBSTORMS (THEMIS) MISSION PHASE A EFFORT THE CONTRACTOR SHALL PROVIDE A CONCEPT STUDY FOR THE THEMIS MISSION IN ORDER TO PROVIDE NASA WITH MORE DEFINITIVE INFORMATION REGARDING THE COST, RISK, AND FEASIBILITY OF THE INVESTIGATION. THE CONTRACTOR SHALL PREPARE AND DELIVER A CONCEPT STUDY REPORT DETAILING THE RESULTS OF THE STUDY IN ACCORDANCE WITH ATTACHMENT B OF THE CONTRACT ENTITLED "MEDIUM-CLASS EXPLORER PROGRAM GUIDELINES AND CRITERIA FOR THE PHASE A CONCEPT STUDY". THE CONTRACTOR SHALL ALSO SUPPORT A NASA SITE VISIT AT ITS FACILITY TO DISCUSS THE CONCEPT STUDY REPORT AND ATTEND A PHASE A CONCEPT STUDY REVIEW MEETING, BRIDGE PHASE OPTION: THE CONTRACTOR SHALL COMMENCE INITIAL DEFINITION PHASE ACTIVITIES, INCLUDING LONG LEAD PARTS PROCUREMENTS. AND THE FOLLOWING ACTIVITIES: - PROVIDE PROGRAM MANAGEMENT FOR THEMIS - BEGIN SCIENTIFIC STUDIES AND SIMULATIONS TO PROVIDE SCIENTIFIC INPUT FOR INSTRUMENT AND ORBIT DESIGN ENSURING THEY MEET SCIENCE GOALS - BEGIN THE DESIGN AND DEVELOPMENT AND INSTRUMENTS, OTHER HARDWARE, AND ELECTRONICS AND - BEGIN FLIGHT SOFTWARE DEVELOPMENT | aerospace |
| 2026-06-01 | S P KOROLEV ROCKET AND SPACE PUBLIC CORPORATION ENERGIA | National Aeronautics and Space Administration | $197,821,846 | ENERGIA WILL PROVIDE HARDWARE AND SERVICES THAT SUPPORT INTERNATIONAL SPACE STATION | aerospace |
| 2026-06-09 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $197,764,967 | SURFACE BIOLOGY & GEOLOGY (SBG): PRE-PHASE A AND PHASE A PLAN | aerospace |
| 2026-06-09 | LOCKHEED MARTIN CORPORATION | National Aeronautics and Space Administration | $193,275,152 | INTERFACE REGION IMAGING SPECTROGRAPH (IRIS). THE CONTRACTOR SHALL REFINE AND EVOLVE THE CONTRACTOR'S COST ESTIMATE FOR PHASES B-F FOR THE INTERFACE REGION IMAGING SPECTROGRAPH (IRIS) MISSION SUBMITTED IN RESPONSE TO NASA ANNOUNCEMENT OF OPPORTUNITY #NNH07ZDA003O FOR THE EXPLORERS PROJECTS DIVISION. THE PRIMARY TASKS IN PHASE B WILL INCLUDE THE GENERATION AND PRESENTATION OF THE SYSTEMS REQUIREMENTS REVIEW (SRR) AND THE PRELIMINARY DESIGN REVIEW (PDR). IN ORDER TO SUPPORT THESE REVIEWS, THE CONCEPT DEFINITION EFFORTS SHALL ENCOMPASS THE WORK REQUIRED TO UPDATE AND REFINE THE PROPOSAL'S SCIENCE INVESTIGATION OBJECTIVES AND PLANS (IF NECESSARY), INSTRUMENT AND SPACECRAFT CONCEPTS AND PERFORMANCE CHARACTERISTICS, AND SCIENCE OPERATIONS AND FLIGHT OPERATIONS PLANS AND CONCEPTS. THESE EFFORTS SHALL IDENTIFY THE CONDITIONS AND CONSTRAINTS NECESSARY FOR THE DEVELOPMENT OF AN INTEGRATED IRIS MISSION APPROACH. THE CONTRACTOR'S MISSION INTEGRATION EFFORTS SHALL INCLUDE CONSIDERATIONS FOR THE ACCOMMODATION OF THE IRIS OBSERVATORY ONTO THE LAUNCH VEHICLE. THE CONTRACTOR'S PHASE B PRELIMINARY DESIGN EFFORTS SHALL DEVELOP THE CSR AND SITE VISIT CONCEPTS INTO A PRELIMINARY DESIGN AND DEFINITION OF THE IRIS MISSION, INCLUDING ITS MISSION OPERATIONS CENTER (MOC) AND SCIENCE OPERATIONS CENTER (SOC). THE PRELIMINARY DESIGN REVIEW (PDR) SHALL BE HELD IN ACCORDANCE WITH NPR 7120.5D, NPR 7123.1A, AND GSFC STD 1001B. THE CONTRACTOR'S EFFORTS IN PHASE B SHALL FORM THE BASIS FOR FINAL ATION OF THE REMAINDER OF THE IRIS DEVELOPMENT AND OPERATIONAL PHASES (C, D, E AND F). DETAILED COST AND SCHEDULE ESTIMATES SHALL BE PREPARED AND SUBMITTED DURING PHASE B, WHICH DEFINES THE CONTRACTOR'S UPDATED BUDGET FOR PHASE B AND THE PLANNED BUDGETS FOR PHASE C, D, E AND F WORK. PERIODIC TECHNICAL AND PROGRAMMATIC INTERCHANGE MEETINGS AT BOTH THE CONTRACTOR'S FACILITY AND AT GSFC SHALL BE REQUIRED TO COORDINATE EFFORTS BETWEEN THE CONTRACTOR AND THE EXPLORERS PROJECTS OFFICE. THESE MAY BE CONDUCTED AS FACE-TO-FACE MEETINGS OR TELECONFERENCES, AS REQUIRED. | aerospace |
| 2026-05-01 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $193,202,732 | MARS PROGRAM MANAGEMENT AND FUTURE PLANNING 60-8583 | aerospace |
| 2026-04-29 | AMENTUM TECHNOLOGY, INC. | National Aeronautics and Space Administration | $184,324,683 | IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 402 (FFP IDIQ). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR); CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED AIR, ELECTRICAL POWER DISTRIBUTION, POTABLE WATER); TECHNOLOGY DEVELOPMENT/ADMINISTRATION (E.G., FACILITY AUTOMATION SYSTEMS [FAS], DATA ACQUISITION SYSTEMS [DAS]); RESEARCH AND INSTITUTIONAL FACILITY MAINTENANCE (E.G., PREVENTIVE MAINTENANCE, TROUBLE CALLS, RELIABILITY CENTERED MAINTENANCE [RCM], FACILITY CONDITION ASSESSMENT [FCA]); AND FACILITY ENGINEERING (E.G., DESIGN, CONSTRUCTION, CONFIGURATION MANAGEMENT, TACTICAL ENGINEERING, PRESSURE SYSTEM RECERTIFICATION, PROJECT MANAGEMENT/PLANNING SUPPORT). | aerospace |
Page 2 of 5