The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$100,071,530

Department of Transportation·Federal Highway Administration

to STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

WORK BEGAN·LATEST ACTION2026-03-03·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22230000Y001FLD720031_069
Award description

PROJECT TITLE: I-75 (SR 93A) FM S OF CSX/BROADWAY AVE TO EB/WB I-4 EXIT RAMP;INTERCHANGE - ADD LANES;CONSTRUCTION;DB :::: PROJECT DESCRIPTION: I-75 (SR 93A) FM S OF CSX/BROADWAY AVE TO EB/WB I-4 EXIT RAMP;INTERCHANGE - ADD LANES;CONSTRUCTION;DB

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds lane-addition construction on I-75 at the I-4 interchange in Florida, part of ongoing highway capacity improvements.

Sub-sectors
highway-infrastructurefhwa-formula-grantinterstate-expansion
Why this matters

Interstate corridor upgrades reduce congestion on a major north-south freight and passenger route connecting Florida's ports and population centers.

Supply-chain signal

Drives demand for construction materials, heavy equipment, and engineering services in Florida's transportation infrastructure sector.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-28. Cost: $0.002789.

Period of performance
Start
End
2027-11-22
Status
activein 508 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$100.1M Department of Transportation — The Buildout — The Buildout