$62,176,543
to STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
PROJECT TITLE: I-275 (HOWARD FRKL) FROM N OF SR687(4TH ST N) TO N OF HOWARD FRANKLAND;BRIDGE-REPLACE AND ADD LANES;PRELIMINARY ENGINEER;DB :::: PROJECT DESCRIPTION: I-275 (HOWARD FRKL) FROM N OF SR687(4TH ST N) TO N OF HOWARD FRANKLAND;BRIDGE-REPLACE AND ADD LANES;PRELIMINARY ENGINEER;DB
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Funds preliminary engineering and design for I-275 Howard Frankland Bridge replacement and lane expansion in Tampa, Florida.
The Howard Frankland Bridge is a critical regional corridor; this ongoing project modernizes aging infrastructure and improves capacity on a major interstate.
Will drive demand for engineering design services, construction materials, and heavy equipment suppliers once project advances to construction phase.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-05. Cost: $0.002805.
- 2026-04-02PROJECT TITLE: I275/SR93 FM N OF HFB TO N OF LOIS,SR60 FM KENNEDY TO N OF SPRUCE/TIA;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB :::: PROJECT DESCRIPTION: I275/SR93 FM N OF HFB TO N OF LOIS,SR60 FM KENNEDY TO N OF SPRUCE/TIA;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB$619.1M
- 2026-06-18PROJECT TITLE: SR23(FIRST COAST XWAY) FROM EAST OF CR16A (SPUR) TO EAST OF CR209 ;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB :::: PROJECT DESCRIPTION: SR23(FIRST COAST XWAY) FROM EAST OF CR16A (SPUR) TO EAST OF CR209 ;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB$278.2M
- 2026-03-03PROJECT TITLE: I-4 MANAGED LANES FROM KIRKMAN TO SR 434; ADD LANES & RECONSTRUCT; PRELIMINARY ENGINEERING & CONSTRUCTION; DB :::: PROJECT DESCRIPTION: I-4 MANAGED LANES FROM KIRKMAN TO SR 434; ADD LANES & RECONSTRUCT; PRELIMINARY ENGINEERING & CONSTRUCTION; DB$216.7M
- 2026-04-17PROJECT TITLE: I-4 @ SAND LAKE RD INTERCHANGE FROM E OF SR 528 TO W OF SR 435;INTERCHANGE IMPROVEMENT;CONSTRUCTION :::: PROJECT DESCRIPTION: I-4 @ SAND LAKE RD INTERCHANGE FROM E OF SR 528 TO W OF SR 435;INTERCHANGE IMPROVEMENT;CONSTRUCTION$198.1M
- 2026-04-17PROJECT TITLE: US 19 (SR 55) FROM NORTHSIDE DR TO NORTH OF CR 95;ADD LANES & RECONSTRUCT;CONSTRUCTION :::: PROJECT DESCRIPTION: US 19 (SR 55) FROM NORTHSIDE DR TO NORTH OF CR 95;ADD LANES & RECONSTRUCT;CONSTRUCTION$116.4M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier ASST_NON_693JJ22230000Y001FLD718055_069.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.