290 awards

Showing 201250
Action dateRecipientAgencyAmountDescriptionSector
2026-04-28KARSUN SOLUTIONS LLCDepartment of Transportation$53,877,280SOLUTION ARCHITECTURE DESIGN AND BUILD TECHNICAL SUPPORT SERVICES. IGF::OT::IGFaerospace
2026-05-19TEXAS DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$53,493,892PROJECT TITLE: WIDEN ROAD-ADD LANES ON SL 1604 FROM IH 10 TO US 281. :::: PROJECT DESCRIPTION: SL 1604 FROM IH 10 TO US 281. WIDEN ROAD - ADD LANES.transportation
2026-03-18NOBLIS, INC.Department of Transportation$53,430,126IGF::OT::IGFaerospace
2026-05-14BROWARD, COUNTY OFDepartment of Transportation$53,357,402AWARD PURPOSE THE PROJECT INCLUDES THE PURCHASE OF TWO TIER 4 DIESEL REACH STACKERS 12 HYBRID PICK UP TRUCKS 14 TIER 4 YARD TRUCKS 11 TIER4 DIESEL TOP HANDLERS ONE WITH OVER HEIGHT SPREADER ONE TIER 4 DIESEL TOP HANDLER WITH LIMITED CAPACITY FOR HANDLING EMPTY CONTAINERS ONE TIER 4 FORKLIFT 12 5 TON CAPACITY 25 LIQUEFIED PETROLEUM GAS LPG TERMINAL TRACTORS REEFER RACKS TOTALING 192 SLOTS TWO HYBRID RUBBER TIRED GANTRY RTG CRANES WITH TWO SPARE SPREADERS AND ONE SPREADER TESTING BENCH. THE PROJECT ALSO INCLUDES PORT AND MARITIME MODERNIZATION PLANS ELECTRICAL SYSTEM UPGRADES AND ASSOCIATED CIVIL WORKS TO SUPPORT INCREASED TERMINAL POWER DEMAND HIGH MAST LIGHTING, OPTICAL CHARACTER RECOGNITION OCR AT THE CROWLEY TERMINAL GATE TWO CONCRETE RTG RUNS ONE MAINTENANCE SAFETY EQUIPMENT AND WASH STATION AND TWO PLUG IN STATIONS FOR THE HYBRID RTGS WHILE AT REST AT THE PORT EVERGLADES TERMINAL PET. ACTIVITIES TO BE PERFORMED COMPONENT 1 CROWLEY PROJECT ADMINISTRATION GRANT ADMINISTRATION AND FEES THROUGHOUT PROJECT LIFE CYCLE PORT AND MARITIME MODERNIZATION PLAN EQUIPMENT PURCHASE 2 REACH STACKERS TIER4 DIESEL 12 HYBRID PICK UP TRUCKS 14 TIER 4 YARD TRUCKS 4 TIER 4 DIESEL TOP HANDLERS CONSTRUCTION AND CIVIL WORK REEFER RACK CONSTRUCTION CONSTRUCT REEFER RACKS SUPPORTING 192 PLUGS TOTAL. ELECTRICAL UPGRADES ELECTRICAL SYSTEM UPGRADES SUCH AS NEW ELECTRIC UTILITY SUBSTATION CONSTRUCTION 24 HIGH MAST LIGHTING 2 OPTICAL CHARACTER RECOGNITION OCR PORTALS INFRASTRUCTURE WILL INCLUDE THE PORTAL STRUCTURE FOUNDATION AND CONNECTION TO TERMINAL ELECTRIC AND DATA SYSTEMS. COMPONENT 2 PORT EVERGLADES TERMINAL PROJECT ADMINISTRATION GRANT ADMINISTRATION AND FEES THROUGHOUT PROJECT LIFE CYCLE PORT AND MARITIME MODERNIZATION PLAN EQUIPMENT PURCHASE 7 TIER 4 STAGE 5 TOP HANDLERS ONE WITH OVER HEIGHT SPREADER 1 TIER 4 STAGE 5 TOP HANDLER WITH LIMITED CAPACITY FOR HANDLING EMPTY CONTAINERS 1 TIER4 DIESEL FORKLIFT 12 5 TON CAPACITY2 5 LIQUEFIED PETROLEUM GAS LPG TERMINAL TRACTORS2 DELIVERABLES EXPECTED OUTCOMES FROM SCHEDULE G PAGE 12 OF THE GRANT AGREEMENT MEASURE CARGO VOLUME. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS AND OPPORTUNITY TOTAL TONS OF CARGO MOVED PER YEAR TEUS OR SHORT TONS. CARGO VOLUME MEASURES THE MOVEMENT OF FREIGHT THROUGH THE PROJECT STUDY AREA. WHEN APPLICABLE, REPORT THE TOTAL CARGO VOLUME AND THE VOLUME DISAGGREGATED BY TYPE OF FREIGHT IE CONTAINERS IN TEU AND BULK IN TONS OR TYPE OF INTERMODAL TRANSPORT (TRUCK OR RAIL. FREQUENCY QUARTERLY. MEASURE REPORTABLE EVENTS. CATEGORY AND DESCRIPTION SAFETY QUALITY OF LIFE TOTAL NUMBER OF REPORTABLE EVENTS PER YEAR. A REPORTABLE EVENT IS DEFINED AS A SAFETY OR SECURITY EVENT OCCURRING IN THE PROJECT STUDY AREA TERMINAL BERTH ETC THAT RESULTS IN ONE OR MORE OF THE FOLLOWING CONDITIONS A FATALITY CONFIRMED WITHIN 30 DAYS OF THE EVENT AN INJURY REQUIRING IMMEDIATE MEDICAL ATTENTION AWAY FROM THE SCENE FOR ONE OR MORE PERSON PROPERTY DAMAGE EQUAL TO OR EXCEEDING 25000 COLLISIONS INVOLVING VEHICLES OR VESSELS AN EVACUATION FOR LIFE SAFETY REASONS. FREQUENCY QUARTERLY. INTENDED BENEFICIARY BROWARD COUNTY OF SUBRECIPIENT ACTIVITIES NONE. INTENDED BENEFICIARY BROWARD COUNTY OF SUBRECIPIENT ACTIVITIES NONE.transportation
2026-04-15REGULUS GROUP, LLCDepartment of Transportation$52,673,094SURVEILLANCE ACQUISITION SUSTAINMENT PROGRAM SUPPORT AJM 41aerospace
2026-03-11ROBINSON AVIATION (RVA), INC.Department of Transportation$52,670,037THE FCT CONTRACT ENCOMPASSES THE SCOPE OF ATC SERVICES AND ASSOCIATED SUPPORT SERVICES REQUIRED FOR THE DAY-TO-DAY OPERATION OF FCTS AS DEFINED IN THE STATEMENT OF WORK (SOW).transportation
2026-05-19OREGON DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$52,413,347PROJECT TITLE: US97 AND US20 BEND NORTH CORRIDOR :::: PROJECT DESCRIPTION: REALIGN US97 INCLUDING BRIDGE OVERPASSES, INTERSECTION IMPROVEMENTS AT US97 AND COOLEY RD., US20 AND COOLEY RD., AND US20 AND ROBAL RD. THESE IMPROVEMENTS WILL REDUCE HIGH SEVERITY CRASHES AND IMPROVE US97 OPERATIONS. PROJECT ALSO INCLUDES OTHER MISCELLANEOUS IMPROVEMENTS INCLUDING PEDESTRIAN IMPROVEMENTS, BRIDGE DECK OVERLAYS, PAVEMENT PRESERVATION, AND ADA UPGRADES.transportation
2026-02-23KALLIDUS TECHNOLOGIES, INCDepartment of Transportation$52,132,951SAMUELS HALL RENOVATION PROJECT CONTRACT AWARDtransportation
2026-05-19TEXAS DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$51,555,255PROJECT TITLE: CONVERT FROM NON-FREEWAY TO FREEWAY ON US 77 :::: PROJECT DESCRIPTION: US 77 FROM FM 1356 TO CR 2130. CONVERT NON-FREEWAY TO FREEWAY.transportation
TEXAS DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$51,503,684PROJECT TITLE: WIDEN ROAD AND ADD LANES ON US 377. :::: PROJECT DESCRIPTION: US 377 FROM SOUTH OF FM 1171 TO CRAWFORD ROAD; RECONSTRUCT AND WIDEN ROADWAY FROM 2 LANE TO 4 LANE; SIDEWALKS, TURN LANES, TEXAS U TURN, NEW SIGNAL INSTALLATION WITH RETIMING, AND A GRADE SEPARATION.transportation
2026-04-02MIDWEST AIR TRAFFIC CONTROL SERVICE INCDepartment of Transportation$51,213,576THE FCT CONTRACT ENCOMPASSES THE SCOPE OF ATC SERVICES AND ASSOCIATED SUPPORT SERVICES REQUIRED FOR THE DAY-TO-DAY OPERATION OF FCTS AS DEFINED IN THE STATEMENT OF WORK (SOW) FOR AREA 1.transportation
TRANSPORTATION, MICHIGAN DEPARTMENT OFDepartment of Transportation$50,847,523PROJECT TITLE: US-23 SCHOOL ROAD TO IDA CENTER ROAD :::: PROJECT DESCRIPTION: ROAD RECONSTRUCTION - SINGLE COURSE MILL AND HMA OVERLAY FOR RAMPS AND WELCOME CENTER US-23 SCHOOL ROAD TO IDA CENTER ROADtransportation
PENNSYLVANIA DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$50,586,102PROJECT TITLE: I-376, COMMERCIAL STREET BRIDGE :::: PROJECT DESCRIPTION: REPLACEMENT OF THE I-376 COMMERCIAL STREET BRIDGE ALONG THE PARKWAY EAST WITHIN THE CITY OF PITTSBURGH, ALLEGHENY COUNTY FOR THE BRIDGE REPLACEMENT, NEW SIGN STRUCTURES, NEW RETAINING WALL, PAVEMENT RECONSTRUCTION, ASPHALT MILLING AND RESURFACING, GUIDE RAIL UPDATES, MEDIAN BARRIER REPLACEMENT, DRAINAGE, SIGNING AND PAVEMENT MARKING, RAMP LOWERING, TEMPORARY ROADWAY, TEMPORARY TRAIL, SEWER LINE RELOCATION, LANDSCAPING, ITS UPGRADES, OVER HEIGHT TRUCK DETECTION SYSTEM RELOCATION, AND OTHER MISCELLANEOUS CONSTRUCTION, ALL WITHIN A LENGTH OF 5493.50 LINEAR FEET (1.041 MILES) AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR STATE ROUTE 376, SECTION A62 AND STATE ROUTE 8012, SECTION A02, IN ALLEGHENY COUNTY, CITY OF PITTSBURGH, WILKINSBURG AND CHURCHILL BOROUGHS, COMMONWEALTH OF PENNSYLVANIA. THIS PROJECT BEING SITUATED AS FOLLOWS: SR 376-A62: FROM APPROXIMATELY THE EASTERN PORTAL OF THE SQUIRREL HILL TUNNEL AT SEGMENTS 0751 WB/0750 EB, OFFSETS 0161 WB/0166 EB (STATIONS 913+90 WB/913+85 EB) TO APPROXIMATELY 3,600 FEET WEST OF THE BRADDOCK AVENUE INTERCHANGE AT SEGMENT 0755 WB/0754 EB, OFFSET 1260 WB/EB (STATIONS 1935+54 WB/EB). SR 8012-A02: FROM APPROXIMATELY 650 FEET NORTH OF ARDMORE BOULEVARD (SR 8) AT SEGMENT 0500, OFFSET 1875 (STATION 20+85) TO APPROXIMATELY SR 376 AT SEGMENT 0500, OFFSET 0308 (STATION 36+52).transportation
2026-04-14GUZMAN & GRIFFIN TECHNOLOGIES, INC.Department of Transportation$50,447,472NEW TASK ORDER, AJI POLICY AND PERFORMANCE SUPPORTaerospace
2026-05-11ROBINSON AVIATION (RVA), INC.Department of Transportation$50,446,972THE FCT CONTRACT ENCOMPASSES THE SCOPE OF ATC SERVICES AND ASSOCIATED SUPPORT SERVICES REQUIRED FOR THE DAY-TO-DAY OPERATION OF FCTS AS DEFINED IN THE STATEMENT OF WORK (SOW).transportation
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$49,823,206SR 200 (A1A) FROM WEST OF RUBIN RD TO EAST OF CR 107/SCOTT RD;ADD LANES & RECONSTRUCT;CONSTRUCTIONtransportation
2026-03-17CGI FEDERAL INC.Department of Transportation$49,716,671THIS FUNDING IS FOR THE AWARD OF THE NOTAM MODERNIZATION/NOTAM MANAGEMENT SERVICE (NMS) CONTRACT AS THE FOLLOW-ON TO THE NOTAM CHALLENGE-BASED ACQUISITION. MODERNIZING THE NOTAM AND AERONAUTICAL INFORMATION SYSTEMS HAS BECOME A NATIONAL PRIORITY. Ttransportation
2026-05-19EXECUTIVE OFFICE OF THE COMMONWEALTH OF KENTUCKYDepartment of Transportation$49,401,862PROJECT TITLE: KENTON/CAMPBELL COS. | KY 8 BRIDGE OVER LICKING RIVER :::: PROJECT DESCRIPTION: ADDRESS DEFICIENCIES OF BRIDGE OVER LICKING RIVER ON WEST 4TH STREET (KY 8) IN COVINGTON/NEWPORT AT KENTON/CAMPBELL CO LN.transportation
2026-05-19TEXAS DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$48,764,151PROJECT TITLE: WIDEN ROAD; ADD LANES AND SHOULDERS ON US 82. :::: PROJECT DESCRIPTION: US 82 FROM RED RIVER COUNTY LINE TO 0.1 MILES WEST OF US 259. WIDEN EXISTING 2-LANE ROADWAY TO 4-LANE DIVIDED.transportation
COLORADO DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$48,511,618PROJECT TITLE: FASTER CBE BABS 2010 DEBT SVC - NHS :::: PROJECT DESCRIPTION: FASTER CBE BABS 2010 DEBT SVC - NHS-DEBT SERVICE BRIDGE ENTERPRISE NHS STRUCTURES-POOR BRIDGE STRUCTURES REHAB, RECONSTRUCTION AND REPLACEMENTtransportation
2026-05-01SYSNET TECHNOLOGIES, INC.Department of Transportation$48,446,164THE SUSTAINMENT OF INDEPENDENCE RISK ASSESSMENT CAPABILITIES, INFORMATION SYSTEMS SECURITY (ISS) ASSURANCE AND THE PERFORMANCE OF PENETRATION TESTINGintelligence
GEORGIA DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$48,312,773PROJECT TITLE: I-16 WB FROM I-75 TO WALNUT CREEK - PHASE V, CST :::: PROJECT DESCRIPTION: I-16 WB FROM I-75 TO WALNUT CREEK - PHASE V, CSTtransportation
2026-05-19TEXAS DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$47,802,214PROJECT TITLE: INTERCHANGE IMPROVEMENT AND CONSTRUCT RAMPS ON IH 20. :::: PROJECT DESCRIPTION: IH 20 FROM IH 20/IH 30 SPLIT TO TARRANT/PARKER COUNTY LINE, CONSTRUCT INTERCHANGE AT WALSH RANCH PARKWAY, INCLUDING AUXILIARY LANES. IH 20 FROM TARRANT/PARKER COUNTY LINE TO MARKUM RANCH ROAD, CONSTRUCT NEW I-20 INTERCHANGE AT MINOR 1/BENTLEY ROAD, INCLUDING AUXILIARY LANES.transportation
2026-05-19COLORADO DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$47,784,784PROJECT TITLE: I-70 FLOYD HILL PACKAGE 2 WEST SECTION :::: PROJECT DESCRIPTION: I-70 FLOYD HILL PACKAGE 2 WEST SECTION-I-70 TOP OF FLOYD HILL TO VETERANS MEMORIAL TUNNELS-ADD A WESTBOUND LANE FROM BEAVER BROOK TO VET TUNNELS, REPLACE BRIDGEStransportation
ILLINOIS DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$47,349,406PROJECT TITLE: DESIGNED OVERLAY AND BRIDGE AND RAMP REPAIR ON I-255 FROM 0.2 MI N OF IL 157 TO IL 15 IN CAHOKIA HEIGHTS :::: PROJECT DESCRIPTION: DESIGNED OVERLAY AND BRIDGE AND RAMP REPAIR ON I-255 FROM 0.2 MI N OF IL 157 TO IL 15 IN CAHOKIA HEIGHTStransportation
2026-04-03CROWLEY GOVERNMENT SERVICES, INC.Department of Transportation$47,284,082ARUNDEL-CLIN 10 DD-A-OMN-CGS-ARU25-1006A-FY25 MAINTENANCE & REPAIRS DRYDOCK A-ESTIMATED $36,484,081.74transportation
2026-04-23CAPITAL GROUP, LLCDepartment of Transportation$45,734,259EFAST PROCUREMENT ACTION #: 23-025 FOR NAS SECURITY AND ENTERPRISE OPERATIONS (NASEO) DIRECTORATE SUPPORT SERVICEStransportation
2026-04-02MIDWEST AIR TRAFFIC CONTROL SERVICE INCDepartment of Transportation$45,555,466THE FCT CONTRACT ENCOMPASSES THE SCOPE OF ATC SERVICES AND ASSOCIATED SUPPORT SERVICES REQUIRED FOR THE DAY-TO-DAY OPERATION OF FCTS AS DEFINED IN THIS STATEMENT OF WORK (SOW).transportation
TRANSPORTATION, NEW JERSEY DEPT OFDepartment of Transportation$45,433,482PROJECT TITLE: CALENDAR YEAR 2025-2026 PLANNING, MULTIMODAL AND GRANTS ADMINISTRATION - STATEWIDE PLANNING AND RESEARCH-OTHER :::: PROJECT DESCRIPTION: CALENDAR YEAR 2025-2026 PLANNING, MULTIMODAL AND GRANTS ADMINISTRATION - STATEWIDE PLANNING AND RESEARCH-OTHERtransportation
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$45,054,489SR-80/SOUTHERN BLVD BRIDGES 930097 & 930098;BRIDGE REPLACEMENT;CONSTRUCTIONtransportation
2026-03-04FORT MYER CONSTRUCTION CORPDepartment of Transportation$44,366,162THIS REQUEST FOR PROPOSAL (DESIGN BUILD) FOR GEORGE WASHINGTON MEMORIAL PARKWAY MOUNT VERNON TRAIL RECONSTRUCTION, PROJECT NO. VA NP GWMP MVT(4) LOCATED IN ARLINGTON COUNTY AND THE CITY OF ALEXANDRIA, VIRGINIA AND THE DISTRICT OF COLUMBIA, WASHINGTONtransportation
2026-03-26CSSI, LLCDepartment of Transportation$43,379,705EFAST PA 22-004-CS SAFETY SERVICES SUPPORT (S3)transportation
TRANSPORTATION NORTH CAROLINA DEPARTMENTDepartment of Transportation$43,044,403PROJECT TITLE: US 17(WILMINGTON BYPASS) FROM SR 1430(CEDAR HILL ROAD) US421 NORTH OF WILMINGTON :::: PROJECT DESCRIPTION: US 17(WILMINGTON BYPASS) FROM SR 1430(CEDAR HILL ROAD) US421 NORTH OF WILMINGTONtransportation
GEORGIA DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$42,909,744PROJECT TITLE: ENVIRONMENTAL ANALYSIS ON FED-AID BY CONSULTANT-FY 2022-2026 :::: PROJECT DESCRIPTION: ENVIRONMENTAL ANALYSIS ON FED-AID BY CONSULTANT-FY 2022-2026transportation
2026-05-19PENNSYLVANIA DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$42,620,297PROJECT TITLE: CSVT SOUTHERN SECTION EARTHWORK :::: PROJECT DESCRIPTION: STATE ROUTE 15, SECTION 88D, IN UNION AND SNYDER COUNTIES IN MONROE TOWNSHIP, PENN TOWNSHIP AND SHAMOKIN DAM BOROUGH FROM APPROXIMATELY 2.0 MILES NORTH OF SR 35 TO APPROXIMATELY 5.7 MILES SOUTH OF MONTANDON. EARTHWORK EXCAVATION AND GRADING, NEW BRIDGE STRUCTURES AND SEVERAL CULVERT, AND OTHER MISCELLANEOUS CONSTRUCTION.transportation
DEPARTMENT OF TRANSPORTATION ARIZONADepartment of Transportation$41,963,500PROJECT TITLE: US-93; VISTA ROYALE (MP 190.5-193), NW OF WICKENBURG :::: PROJECT DESCRIPTION: CONSTRUCT TO 4 LANES DIVIDEDtransportation
2026-04-29WALSH FEDERAL LLCDepartment of Transportation$41,750,906HCF TFIP MODERNIZATION AND OFDPS REPLACEMENTtransportation
TRANSPORTATION & DEVELOPMENT LOUISIANA DDepartment of Transportation$41,661,357PROJECT TITLE: US90Z:HARVEY CANAL TUNNEL REHABILITATION :::: PROJECT DESCRIPTION: SCOPE: CLEANING, MECHANICAL, ELECTRICAL AND STRUCTURAL REHABILITATIONtransportation
2026-04-20SCIENCE APPLICATIONS INTERNATIONAL CORPDepartment of Transportation$41,042,575THE AWARD OF A NEW END USER SUPPORT TASK ORDER.transportation
WASHINGTON ST DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$40,756,263PROJECT TITLE: I-5/SB DENNY WAY TO NE 117TH ST - PAVEMENT, DECK, EXPANSION JOINTS, & DRAINAGE :::: PROJECT DESCRIPTION: CONCRETE PAVEMENT & EXPANSION JOINT REPLACEMENTS, AND DECK SEALtransportation
2026-05-19OREGON DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$40,449,059PROJECT TITLE: I-84: FAREWELL BEND - N. FORK JACOBSEN GULCH :::: PROJECT DESCRIPTION: PAVE I-84 INCLUDING REPAVING BRIDGE APPROACH SLABS WITH NEW JOINTS, UPGRADE AND INSTALL NEW WEIGH IN MOTION SYSTEM, INSTALL VARIABLE MESSAGE SIGNS AND ADD LIGHTING TO INCREASE SAFETY, REDUCE CONGESTION AND IMPROVE COMMUNICATIONS FOR THE TRAVELING PUBLIC.transportation
2026-04-08RAYTHEON COMPANYDepartment of Transportation$40,347,540THE PURPOSE OF THIS ACTION IS TO ISSUE TASK ORDER 1 UNDER THE DFO2 IDIQ FOR PROGRAM MANAGEMENT TASKS.aerospace
2026-05-19TEXAS DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$39,963,905PROJECT TITLE: WIDEN ROAD AND ADD LANES ON IH 20. :::: PROJECT DESCRIPTION: IH 20 FROM FM 600 TO SH 351; ADD TWO MAIN LANES FOR A SIX LANE FREEWAY AND CONSTRUCT OVERPASS STRUCTURES.transportation
ARKANSAS DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$39,820,010PROJECT TITLE: BAPTIST HOSPITAL - UNIVERISTY AVE. (WIDENING) (F) :::: PROJECT DESCRIPTION: WIDENINGtransportation
GEORGIA DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$39,712,467PROJECT TITLE: SR 360 FROM NEW MACLAND ROAD/COBB TO SR 120/PAULDING, CST :::: PROJECT DESCRIPTION: SR 360 FROM NEW MACLAND ROAD/COBB TO SR 120/PAULDING, CSTtransportation
2026-05-19OREGON DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$39,520,934PROJECT TITLE: GARVEE SERIES 2024A DEBT SERVICE :::: PROJECT DESCRIPTION: GARVEE SERIES 2024A DEBT SERVICEtransportation
2026-05-19TRANSPORTATION, MICHIGAN DEPARTMENT OFDepartment of Transportation$39,507,129PROJECT TITLE: M-102 E M-1 (WOODWARD AVENUE) TO M-53 (VAN DYKE AVENUE) :::: PROJECT DESCRIPTION: MILLING AND TWO COURSE ASPHALT RESURFACING M-1 (WOODWARD AVENUE) TO M-53 (VAN DYKE AVENUE) AND WB M-102 AT HUBBELL INTERSECTIONtransportation
WASHINGTON ST DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$39,363,864PROJECT TITLE: I-5/SB DENNY WAY TO NE 117TH ST - PAVEMENT, DECK, EXPANSION JOINTS, & DRAINAGE :::: PROJECT DESCRIPTION: CONCRETE PAVEMENT & EXPANSION JOINT REPLACEMENTS, AND DECK SEALtransportation
ARKANSAS DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$38,625,622PROJECT TITLE: HWY. 64 - HWY. 331 (S) :::: PROJECT DESCRIPTION: 4' MILL & OVERLAY, SPECIAL CLEARING, POLYMER OVERLAY 6 BRIDGEStransportation
2026-04-02GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC.Department of Transportation$38,323,954FCS TAG #0045 - ENTERPRISE INFORMATION MANAGEMENT (EIM) INITIAL OPERATION CAPABILITIES (IOC) PLATFORM OPERATIONS AND MAINTENANCEtransportation