Database / Awards
Federal awards
Every contract and grant ingested from USAspending.gov. Pick an agency to narrow the list; toggle Highest / Lowest to sort. Click any row to open the full award profile.
Sort by
Agency: National Aeronautics and Space AdministrationStatus: Currently active
Results
219 awards
Showing 1–50
| Action date | Recipient | Agency | Amount | Description | Sector |
|---|---|---|---|---|---|
| 2026-06-18 | THE BOEING COMPANY | National Aeronautics and Space Administration | $22,437,793,941 | INTERNATIONAL SPACE STATION | aerospace |
| 2026-06-15 | LOCKHEED MARTIN CORP | National Aeronautics and Space Administration | $15,540,973,335 | TAS::80 0124::TAS DESIGN, DEVELOPMENT, TEST&EVALUATION OF PROJECT ORION | aerospace |
| 2026-06-18 | THE BOEING COMPANY | National Aeronautics and Space Administration | $10,510,304,426 | PROVIDE DEVELOPMENTAL HARDWARE AND TEST ARTICLES, AND MANUFACTURE AND ASSEMBLE ARES I UPPER STAGES. THE UPPER STAGE (US) ELEMENT IS AN INTEGRAL PART OF THE ARES I LAUNCH VEHICLE AND PROVIDES THE SECOND STAGE OF FLIGHT. THE US ELEMENT IS RESPONSIBLE FOR THE ROLL CONTROL DURING THE FIRST STAGE BURN AND SEPARATION; AND WILL PROVIDE THE GUIDANCE AND NAVIGATION, COMMAND AND DATA HANDLING, AND OTHER AVIONICS FUNCTIONS FOR THE ARES I DURING ALL PHASES OF THE ASCENT FLIGHT. THE US ELEMENT IS A NEW DESIGN THAT EMPHASIZES SAFETY, OPERABILITY, AND MINIMUM LIFE CYCLE COST. THE OVERALL DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E), PRODUCTION, AND SUSTAINING ENGINEERING EFFORTS INCLUDE ACTIVITIES PERFORMED BY THREE ORGANIZATIONS; THE NASA DESIGN TEAM (NDT), THE UPPER STAGE PRODUCTION CONTRACTOR (USPC) AND THE INSTRUMENT UNIT PRODUCTION CONTRACTOR (IUPC). FOR CLARITY, THE USPC WILL BE REFERRED TO AS THE CONTRACTOR THROUGHOUT THIS DOCUMENT. NASA IS RESPONSIBLE FOR THE INTEGRATION OF THE PRIMARY ELEMENTS OF THE ARES I LAUNCH VEHICLE INCLUDING: THE FIRST STAGE, US INCLUDING INSTRUMENT UNIT (IU), AND US ENGINE; AND WILL ALSO INTEGRATE THE ARES I LAUNCH VEHICLE AT THE LAUNCH SITE. NASA IS RESPONSIBLE FOR THE DDT&E, INCLUDING TECHNICAL AND PROGRAMMATIC INTEGRATION OF THE US SUBSYSTEMS AND GOVERNMENT-FURNISHED PROPERTY. NASA WILL LEAD THE EFFORT TO DEVELOP THE REQUIREMENTS AND SPECIFICATIONS OF THE US ELEMENT, THE DEVELOPMENT PLAN AND TESTING REQUIREMENTS, AND ALL DESIGN DOCUMENTATION, INITIAL MANUFACTURING AND ASSEMBLY PROCESS PLANNING, LOGISTICS PLANNING, AND OPERATIONS SUPPORT PLANNING. DEVELOPMENT, QUALIFICATION, AND ACCEPTANCE TESTING WILL BE CONDUCTED BY NASA AND THE CONTRACTOR TO SATISFY REQUIREMENTS AND FOR RISK MITIGATION. NASA IS RESPONSIBLE FOR THE OVERALL UPPER STAGE VERIFICATION AND VALIDATION PROCESS AND WILL REQUIRE SUPPORT FROM THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR THE MANUFACTURE AND ASSEMBLY OF THE UPPER STAGE TEST FLIGHT AND OPERATIONAL UPPER STAGE UNITS INCLUDING THE INSTALLATION OF UPPER STAGE INSTRUMENT UNIT, THE GOVERNMENT-FURNISHED US ENGINE, BOOSTER SEPARATION MOTORS, AND OTHER GOVERNMENT-FURNISHED PROPERTY. A DESCRIPTION OF THE NASA MANAGED AND PERFORMED EFFORTS IS CONTAINED IN THE US WORK PACKAGES AND WILL BE MADE AVAILABLE TO THE CONTRACTOR TO ENSURE THEIR UNDERSTANDING OF THE ROLES AND RESPONSIBILITIES OF THE NDT, IUPC, AND CONTRACTOR DURING THE DESIGN, DEVELOPMENT, AND OPERATION OF THE US ELEMENT. THE US CONCEPTUAL DESIGN DESCRIBED IN THE USO-CLV-SE-25704 US DESIGN DEFINITION DOCUMENT (DDD) IS THE BASELINE DESIGN FOR THIS CONTRACT. THE CONTRACTORS EARLY ROLE WILL BE TO PROVIDE PRODUCIBILITY ENGINEERING SUPPORT TO NASA VIA THE ESTABLISHED US OFFICE STRUCTURE AND TO PROVIDE INPUTS INTO THE FINAL DESIGN CONFIGURATION, SPECIFICATIONS, AND STANDARDS. NASA WILL TRANSITION THE MANUFACTURING AND ASSEMBLY, LOGISTICS SUPPORT INFRASTRUCTURE, CONFIGURATION MANAGEMENT, AND THE SUSTAINING ENGINEERING FUNCTIONS TO THE CONTRACTOR AT THE KEY POINTS DURING THE DEVELOPMENT AND IMPLEMENTATION OF THE PROGRAM CURRENTLY PLANNED TO OCCUR NO LATER THAN 90 DAYS AFTER THE COMPLETION OF THE FOLLOWING MAJOR MILESTONES: MANUFACTURING AND ASSEMBLY US PRELIMINARY DESIGN REVIEW (PDR) LOGISTICS SUPPORT INFRASTRUCTURE US PDR CONFIGURATION MANAGEMENT US CRITICAL DESIGN REVIEW CDR) SUSTAINING ENGINEERING US DESIGN CERTIFICATION REVIEW (DCR) AFTER THE COMPLETION OF AN ORDERLY TRANSITION OF ROLES AND RESPONSIBILITIES TO THE CONTRACTOR, NASA WILL ASSUME AN INSIGHT ROLE INTO THE CONTRACTORS PRODUCTION, SUSTAINING ENGINEERING, AND OPERATIONS SUPPORT OF THE ARES I US TEST PROGRAM AND FLIGHT HARDWARE. AFTER DCR, THE CONTRACTOR WILL BE RESPONSIBLE FOR SUSTAINING ENGINEERING PER SOW SECTION 4.7, AS NECESSARY TO MAINTAIN AND SUPPORT THE US CONFIGURATION AND FOR PRODUCTION AND OPERATIONS SUPPORT. | aerospace |
| 2026-06-15 | RUSSIA SPACE AGENCY | National Aeronautics and Space Administration | $4,682,328,999 | JOINT US/RUSSIAN HUMAN SPACE FLIGHT ACTIVITIES | aerospace |
| 2026-06-15 | NORTHROP GRUMMAN SYSTEMS CORPORATION | National Aeronautics and Space Administration | $4,430,784,857 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS | aerospace |
| 2026-06-04 | AEROJET ROCKETDYNE OF DE, INC | National Aeronautics and Space Administration | $3,272,481,574 | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. | aerospace |
| 2026-06-01 | SPACE EXPLORATION TECHNOLOGIES CORP. | National Aeronautics and Space Administration | $3,044,069,155 | WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER. | aerospace |
| 2026-05-11 | SPACE EXPLORATION TECHNOLOGIES CORP. | National Aeronautics and Space Administration | $3,029,850,124 | IGF::OT::IGF THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. NASA CERTIFICATION UNDER CLIN 001 IS COMPLETE WHEN THE CONTRACTOR'S CREW TRANSPORTATION SYSTEM (CTS) HAS MET NASA'S REQUIREMENTS FOR SAFELY TRANSPORTING CREW TO AND FROM THE INTERNATIONAL SPACE STATION (ISS) IN ACCORDANCE WITH DOCUMENTS IDENTIFIED IN SECTION C.1, SPECIFICATIONS/STATEMENT OF WORK. SUBCLINS 001A AND 001B, IDENTIFIED IN TABLE B.3,DDTE/CERTIFICATION SUBCLINS, ARE DELIVERY MILESTONES THAT REPRESENT COMPLETION OF REQUIRED WORK NECESSARY TO ACHIEVE NASA CERTIFICATION. DELIVERY PAYMENT FOR THE ISS DESIGN CERTIFICATION REVIEW (DCR) FOR THE CREWED FLIGHT TO THE ISS INCLUDES ALL WORK UNDER THIS CLIN THAT OCCURS FROM THE CONTRACT EFFECTIVE DATE THROUGH THE ISS DCR COMPLETION. THE DELIVERY PAYMENT FOR THE CERTIFICATION REVIEW (CR) WILL INCLUDE ALL WORK THAT OCCURS FROM THE ISS DCR DELIVERY DATE THROUGH THE END OF THE DDTE/CERTIFICATION CLIN 001. IN ACCORDANCE WITH CLAUSE C.1, SPECIFICATION/STATEMENT OF WORK, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTING OFFICER MAY ISSUE POST CERTIFICATION MISSION (PCM) TASK ORDERS. THE CONTRACTOR SHALL USE THE MISSION PRICING RATES SHOWN IN TABLE B.4.1, POST CERTIFICATION MISSION PRICES. THE PER MISSION PRICES ARE FOR A SINGLE ORDER AT THE PRICE STATED PER THE CALENDAR YEAR (CY) BASED ON THE NUMBER OF MISSIONS ORDERED. CTS FULL MISSION CAPABILITY PRICES SHALL BE BASED ON (1) FULFILLMENT OF THE DESIGN REFERENCE MISSION TO THE ISS FOUND IN CCT-DRM-1110, CREW TRANSPORTATION SYSTEM DESIGN REFERENCE MISSIONS, ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, AND OTHER TERMS AND CONDITIONS IN THE CONTRACT AND (2) ALL INHERENT CTS CAPABILITIES THAT ARE WITHIN THE PROPOSED MISSION PRICES. IN ACCORDANCE WITH ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTOR SHALL PERFORM SPECIAL STUDIES, TEST AND ANALYSES, AS INITIATED BY WRITTEN DIRECTION FROM THE CONTRACTING OFFICER. SPACEX CCTCAP POST CERTIFICATION MISSIONS 3-6(PCM-3-6) TASK ORDER AGAINST NNK14MA74C CLIN 002, AS DESCRIBED IN CLAUSE B.4 POST CERTIFICATION MISSIONS (IDIQ)(CLIN 002) AND ALL OTHER APPLICABLE TERMS AND CONDITIONS. | aerospace |
| 2026-06-09 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $2,967,618,609 | EUROPA CLIPPER PROJECT THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. | aerospace |
| 2026-06-16 | THE BOEING COMPANY | National Aeronautics and Space Administration | $2,530,079,189 | SPACE LAUNCH SYSTEM (SLS) STAGES PRODUCTION AND EVOLUTION CONTRACT (SPEC) | aerospace |
| 2026-05-21 | ASSOCIATION OF UNIVERSITIES FOR RESEARCH IN ASTRONOMY, INC. | National Aeronautics and Space Administration | $2,511,478,245 | THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20 | aerospace |
| 2026-05-21 | LOCKHEED MARTIN CORP | National Aeronautics and Space Administration | $2,032,336,135 | THE GOVERNMENT IS PROCURING THE NEXT-GENERATION GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) SERIES TO CONTINUE ITS MISSION THROUGH NEW REQUIREMENTS SPECIFIED IN THE GOES-R LEVEL I REQUIREMENTS DOCUMENT AND MISSION REQUIREMENTS DOCUMENT (MRD). THE FIRST SATELLITE OF THIS NEW SERIES, DESIGNATED AS GOES-R, WILL PROVIDE THE FIRST MAJOR IMPROVEMENT IN INSTRUMENT TECHNOLOGY SINCE GOES-I LAUNCHED IN 1994. THE GOES-R SERIES WILL INTRODUCE OTHER NEW TECHNOLOGIES IN BOTH THE SPACE AND GROUND SEGMENTS. THESE ADVANCES WILL IMPROVE THE NATION'S ABILITY TO MONITOR AND FORECAST WEATHER AND ENVIRONMENTAL PHENOMENA WITH A SIGNIFICANT INCREASE IN THE NUMBER OF PRODUCTS. ONE OF NOAA'S PRINCIPAL MISSIONS IS TO PROVIDE FORECASTS AND WARNINGS FOR THE UNITED STATES, ITS TERRITORIES, ADJACENT WATERS AND OCEAN AREA FOR THE PROTECTION OF LIFE AND PROPERTY AND ENHANCEMENT OF THE NATIONAL ECONOMY. THIS MISSION REQUIRES THE CAPABILITY TO ACQUIRE, PROCESS, AND DISSEMINATE ENVIRONMENTAL DATA ON AN EXTENSIVE SPATIAL RANGE (GLOBAL, REGIONAL AND LOCAL) ON A VARIETY OF TIME SCALES. THESE DATA INCLUDE, BUT ARE NOT LIMITED TO: GLOBAL IMAGERY; CLOUD AND PRECIPITATION PARAMETERS; ATMOSPHERIC PROFILES OF TEMPERATURE, MOISTURE, WINDS, AEROSOLS, AND OZONE; SURFACE CONDITIONS CONCERNING ICE, SNOW AND VEGETATION; OCEAN PARAMETERS AND SEA-SURFACE TEMPERATURE; AND SOLAR AND IN-SITU SPACE ENVIRONMENT CONDITIONS. THE STATEMENT OF WORK (SOW) DEFINES THOSE TASKS TO DESIGN, ANALYZE, VALIDATE, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, TEST, VERIFY, EVALUATE, DELIVER GOES-R SERIES SATELLITES AND SUPPORT LAUNCH AND POST LAUNCH, SUPPLY AND MAINTAIN THE GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE NOAA SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES, AND OTHER RESOURCES TO DESIGN, VALIDATE, FABRICATE, ASSEMBLE, INTEGRATE, TEST, VERIFY, AND DELIVER GOES-R SERIES SATELLITES AND PROVIDE PRE-LAUNCH, LAUNCH, AND POST-LAUNCH SUPPORT AND TRAINING UNDER THE BASIC CONTRACT, AND OPTIONS WHEN EXERCISED BY THE GOVERNMENT. | weather-climate |
| 2026-06-05 | AMENTUM TECHNOLOGY, INC. | National Aeronautics and Space Administration | $1,930,675,317 | ENGINEERING SERVICES AND SCIENCE CAPABILITY AUGMENTATION (ESSCA) | aerospace |
| 2026-06-01 | BLUE ORIGIN MANUFACTURING, LLC | National Aeronautics and Space Administration | $1,738,511,190 | RAPID DDT&E AND DEMONSTRATION OF S SUSTAINABLE HUMAN LANDING SYSTEM INTEGRATED LANDER. | aerospace |
| 2026-06-17 | NORTHROP GRUMMAN SYSTEMS CORPORATION | National Aeronautics and Space Administration | $1,599,792,955 | IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS | aerospace |
| 2026-05-11 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $1,598,516,202 | MARS SAMPLE RETURN (MSR) PROGRAM - PHASE A 40-108270 | aerospace |
| 2026-06-11 | ASSOCIATION OF UNIVERSITIES FOR RESEARCH IN ASTRONOMY, INC. | National Aeronautics and Space Administration | $1,549,311,664 | THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS. | aerospace |
| 2026-06-16 | PERATON INC. | National Aeronautics and Space Administration | $1,499,608,688 | THE EXPLORATION AND SPACE COMMUNICATIONS PROJECTS DIVISION (ESC) IS A NATIONAL RESOURCE LOCATED AT GODDARD SPACE FLIGHT CENTER (GSFC) WHICH ENABLES SCIENTIFIC DISCOVERY AND SPACE EXPLORATION BY PROVIDING INNOVATIVE AND MISSION-EFFECTIVE SPACE COMMUNICATIONS AND NAVIGATION SOLUTIONS TO A LARGE COMMUNITY OF DIVERSE CUSTOMERS. ESC MANAGES OPERATIONAL GEOSTATIONARY COMMUNICATIONS RELAY SATELLITES AND GROUND SYSTEMS FOR THE SPACE COMMUNICATIONS AND NAVIGATION (SCAN) PROGRAM AT NASA HEADQUARTERS. TODAY, SCAN NETWORK SYSTEMS CONSIST OF THE SPACE NETWORK (SN), THE NEAR EARTH NETWORK (NEN), AND THE DEEP SPACE NETWORK (DSN). THE DAY-TO-DAY MANAGEMENT OF THESE THREE NETWORKS IS CURRENTLY NOT FULLY CONSISTENT. IT IS THE INTENTION OF THE GOVERNMENT TO UNIFY THE SN AND NEN WHERE PRACTICABLE UNDER THIS CONTRACT USING INTEGRATED, COMMON MANAGEMENT PRACTICES AND NETWORK SOLUTIONS. | aerospace |
| 2026-06-01 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $1,463,429,449 | DEEP SPACE NETWORK (DSN) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASA S DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8) JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS (STEM) DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. | aerospace |
| 2026-06-18 | HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC. | National Aeronautics and Space Administration | $1,451,665,745 | EXTRAVEHICULAR SPACE OPERATIONS CONTRACT (ESOC) | aerospace |
| 2026-06-11 | SMITHSONIAN INSTITUTION | National Aeronautics and Space Administration | $1,347,228,052 | FOLLOW ON CONTRACT TO PROVIDE OPERATIONS AND SCIENCE SUPPORT TO THE CXO | aerospace |
| 2026-03-25 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $1,283,721,680 | M2020 MARS SCIENCE ROVER PROJECT-PHASE A-D 60-19107 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. | aerospace |
| 2026-03-30 | THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC | National Aeronautics and Space Administration | $1,274,597,995 | DRAGONFLY EXTENDED PHASE B MISSION UNDER 80MSFC20D0004 AEROSPACE RESEARCH, DEVELOPMENT AND ENGINEERING SUPPORT (ARDES) II. | aerospace |
| 2026-06-02 | THE BOEING COMPANY | National Aeronautics and Space Administration | $1,270,420,376 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS | aerospace |
| 2026-06-17 | RAYTHEON COMPANY | National Aeronautics and Space Administration | $1,224,555,500 | ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE VISIBLE INFRARED IMAGER RADIOMETER (VIRS) INSTRUMENT AND SUPPORT. | aerospace |
| 2026-06-18 | KBR WYLE SERVICES, LLC | National Aeronautics and Space Administration | $1,058,270,017 | IGF::CT::IGFMSOC FPDS-NG MISSION SYSTEMS OPERATIONS CONTRACT (MSOC) | aerospace |
| 2026-06-18 | L3HARRIS TECHNOLOGIES, INC. | National Aeronautics and Space Administration | $1,035,791,035 | TAS::80 0122::TAS DEVELOPMENT, MANUFACTURING AND SUPPORT TO WEATHER OBSERVING INSTRUMENT | weather-climate |
| 2026-04-19 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $855,859,861 | NEAR EARTH OBJECT SURVEYOR (NEO SURVEYOR) PROJECT (71-107722) | aerospace |
| 2026-06-08 | L3HARRIS TECHNOLOGIES, INC. | National Aeronautics and Space Administration | $814,435,946 | ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE CROSS TRACK INFRARED SOUNDER (CRIS) INSTRUMENT AND SUPPORT. | aerospace |
| 2026-03-14 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $807,809,090 | PSYCHE: JOURNEY TO A METAL WORLD THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASA S DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8) JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS (STEM) DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. | aerospace |
| 2026-04-03 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $775,059,791 | NASA ISRO SYNTHETIC APERTURE RADAR (NISAR) MISSION 89-17620 | aerospace |
| 2026-06-18 | KBR WYLE SERVICES, LLC | National Aeronautics and Space Administration | $631,707,167 | GROUND SYSTEMS AND MISSION OPERATIONS (GSMO-3) | aerospace |
| 2026-06-03 | AMENTUM SPACEPORT LLC | National Aeronautics and Space Administration | $608,219,286 | BASE OPERATIONS AND SPACEPORT SERVICES (BOSS) CONTRACT | aerospace |
| 2026-06-10 | NORTHROP GRUMMAN SYSTEMS CORPORATION | National Aeronautics and Space Administration | $584,348,960 | THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, FACILITIES, EQUIPMENT, MATERIAL, AND SERVICES NECESSARY TO DESIGN, DEVELOP, MANUFACTURE, INTEGRATE, TEST, AND DELIVER THE HARDWARE, DOCUMENTATION, AND SERVICES SPECIFIED HEREIN. THE CONTRACTOR SHALL ALSO PROVIDE SUPPORT, AS REQUIRED, FOR PRE-DELIVERY MISSION INTEGRATION ACTIVITIES, SUCH AS NPP MISSION OPERATIONS REVIEW AND JPSS DELTA-PDR. DOCUMENTATION AND OTHER TASKS SHOULD BE IN ACCORDANCE WITH THE REQUIREMENTS OF THIS SOW AND THE APPLICABLE DOCUMENTATION REFERENCED IN SECTION 2.3 HEREIN. COMPLIANCE WITH THE REQUIREMENTS STATED HEREIN, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. | aerospace |
| 2026-05-18 | NORTHROP GRUMMAN SYSTEMS CORPORATION | National Aeronautics and Space Administration | $569,524,472 | JOINT POLAR SATELLITE SYSTEM-2 SPACECRAFT. GD-300HP CORE SPACECRAFT INCLUDING ALL ASSOCIATED HARDWARE, SOFTWARE, SOURCE CODE, MAINTENANCE SYSTEM AND DOCUMENTATION FOR THE JPSS-2 SPACECRAFT MISSION. | aerospace |
| 2026-05-13 | UNIVERSITY OF ARIZONA | National Aeronautics and Space Administration | $486,654,377 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. | aerospace |
| 2026-05-24 | LOCKHEED MARTIN CORPORATION | National Aeronautics and Space Administration | $486,224,471 | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS | aerospace |
| 2026-06-10 | BAE SYSTEMS SPACE & MISSION SYSTEMS INC. | National Aeronautics and Space Administration | $482,314,982 | ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE OMPS PROTOFLIGHT MODEL AND SUPPORT. | aerospace |
| 2026-06-12 | SCIENCE SYSTEMS AND APPLICATIONS, INC. | National Aeronautics and Space Administration | $461,732,408 | THE PURPOSE OF THIS CONTRACT IS TO ACQUIRE SCIENTIFIC RESEARCH SERVICES THAT CONCEIVES, DEVELOPS AND APPLIES SPACE, FIELD-DEPLOYED (I.E. AIRBORNE AND IN SITU) AND LABORATORY BASED TECHNOLOGIES AND OBSERVATIONS OF THE EARTH SYSTEMS. | aerospace |
| 2026-06-03 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $445,008,072 | MASS CHANGE (MC) PRE-PHASE A AND PHASE A PLAN (89-109861) | aerospace |
| 2026-06-17 | LOCKHEED MARTIN CORP | National Aeronautics and Space Administration | $441,345,131 | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM. | aerospace |
| 2026-06-17 | LOCKHEED MARTIN CORP | National Aeronautics and Space Administration | $438,374,601 | DESIGN BUILD AND DELIVER 3 GEOXO SPACECRAFT | aerospace |
| 2026-06-03 | SPACE EXPLORATION TECHNOLOGIES CORP. | National Aeronautics and Space Administration | $425,568,844 | DESIGN, DEVELOP, MANUFACTURE, TEST, INTEGRATE, ACHIEVE NASA ACCEPTANCE, DELIVER, AND SUSTAIN ITS UNITED STATES DEORBIT VEHICLE (USDV) SUCH THAT THE USDV CAN PERFORM THE FINAL DEORBIT OF THE INTERNATIONAL SPACE STATION (ISS) | aerospace |
| 2026-06-03 | INSTITUTO NACIONAL DE TECNICA AEROESPACIAL ESTEBAN TERRADAS MDE | National Aeronautics and Space Administration | $412,393,152 | OPERATION AND MAINTENANCE OF THE MADRID DEEP SPACE COMMUNICATIONS COMPLEX. | aerospace |
| 2026-05-21 | AERODYNE-SGT ENGINEERING SERVICES, LLC | National Aeronautics and Space Administration | $406,089,353 | THE MIST II CONTRACT WILL PROVIDE MULTIDISCIPLINARY ENGINEERING TASK ORDERS FOR THE FORMULATION, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT AND GROUND SYSTEM HARDWARE AND SOFTWARE. | aerospace |
| 2026-03-30 | THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC | National Aeronautics and Space Administration | $400,021,412 | INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) PHASE CD | aerospace |
| 2026-06-17 | AXIOM SPACE INC | National Aeronautics and Space Administration | $395,433,324 | EXPLORATION EXTRAVEHICULAR ACTIVITY SERVICE (XEVAS) ARTEMIS PROGRAM | aerospace |
| 2026-03-18 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $391,511,913 | WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) CORONAGRAPH THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASA S DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8) JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS (STEM) DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. | aerospace |
| 2026-05-22 | SOUTHWEST RESEARCH INSTITUTE | National Aeronautics and Space Administration | $384,632,648 | TAS::80 0120::TAS AS THE PRINCIPAL INVESTIGATOR (PI) INSTITUTION FOR THE MAGNETOSPHERIC MULTISCALE (MMS) INSTRUMENT SUITE SCIENCE TEAM (ISST), THE CONTRACTOR IS RESPONSIBLE FOR LEADING THE SOLVING MAGNETOSPHERIC ACCELERATION RECONNECTION AND TURBULENCE (SMART) TEAM THROUGH ALL MISSION PHASES. THE SCOPE OF WORK SHALL INCLUDE, BUT NOT BE LIMITED, TO THE FOLLOWING: - MANAGE THE SMART TEAM THROUGH PHASES B THROUGH E OF THE MMS MISSION, - DEFINING SCIENCE GOALS AND OBJECTIVES - ASSIST THE MMS PROJECT AND HQ SCIENCE MISSION DIRECTORATE HELIOPHYSICS DIVISION IN THE PREPARATION OF LEVEL 1 REQUIREMENTS FOR THE MMS MISSION - FLOW-DOWN OF TOP-LEVEL MISSION REQUIREMENTS TO THE APPROPRIATE ELEMENTS OF THE INSTRUMENT SUITE - DESIGN, FABRICATION, INTEGRATION, CALIBRATION, TESTING AND DELIVERY OF FOUR FULLY QUALIFIED, FLIGHT INSTRUMENT SUITES TO OBSERVATORY INTEGRATION AND TEST (I&T) PLUS SPARES - DESIGN, DEVELOPMENT, INTEGRATION AND TESTING OF THE SOC - SUPPORT OBSERVATORY-LEVEL I&T ACTIVITIES - PROVIDE SUSTAINING ENGINEERING AND I&T SUPPORT OF THE INSTRUMENT SUITES AFTER DELIVERY TO NASA - RESPONSIBILITY FOR THE ON-ORBIT OPERATION, HEALTH AND SAFETY OF THE INSTRUMENT SUITES - RESPONSIBILITY FOR OPERATING AND MAINTAINING THE SOC POST-LAUNCH - ESTABLISHING AND MANAGING SUBCONTRACTS WITH INSTRUMENT SUITE TEAM MEMBERS - ESTABLISHING AND MAINTAINING THE REQUIRED INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (ITAR) AND EXPORT CONTROL DOCUMENTATION NECESSARY FOR WORKING WITH ITS INTERNATIONAL TEAM MEMBERS - IMPLEMENTATION OF AN EPO PROGRAM FOR THE MMS MISSION | aerospace |
| 2026-05-07 | L3HARRIS TECHNOLOGIES, INC. | National Aeronautics and Space Administration | $372,589,497 | OPTICAL TELESCOPE ASSEMBLY (OTA) THIS CONTRACT PROVIDES FOR ALL EFFORTS AND RESPONSIBILITIES FOR THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO BUILD, REFURBISH, OR MODIFY THE OTA AS REQUIRED TO MEET THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) PERFORMANCE REQUIREMENTS. | aerospace |
Page 1 of 5
← PreviousNext →