$659,038,221
BORDER WALL CONSTRUCTION IN THE TUCSON & YUMA SECTORS, AZ
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Latest obligation on the 2025 border wall construction contract for Tucson and Yuma sectors in Arizona.
Part of ongoing DHS infrastructure modernization at the southern border; represents sustained federal commitment to physical barrier expansion.
Drives demand for construction materials, heavy equipment, and labor in Arizona; supports regional contractors and supply chains.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-17. Cost: $0.002707.
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_70B01C25F00001057_7014_70B01C23D00000009_7014.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.