$506,606,570
Department of Homeland Security·U.S. Customs and Border Protection
WORK BEGAN2025-09-15·LATEST ACTION2026-04-01·SOURCEUSASPENDING·SOURCE IDCONT_AWD_70B01C25F00000600_7014_70B01C23D00000009_7014
Award description
BORDER WALL BARRIER CONSTRUCTION
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
The Buildout's read
What the model surfaced from this award
Confidence: high
In plain English
Latest obligation on the ongoing border wall barrier construction contract that began in September 2025.
Sub-sectors
border-securitycbp-infrastructurebarrier-construction
Why this matters
Part of CBP's multi-year, $506M+ border infrastructure program to construct physical barriers along the U.S. southern border.
Supply-chain signal
Drives demand for steel, concrete, construction equipment, and labor from regional contractors and material suppliers supporting border construction.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-17. Cost: $0.002715.
Period of performance
Start
2025-09-15
End
2028-04-30
Status
activein 670 days
Other awards from this recipient
- 2026-03-21CONSTRUCTION OF BORDER BARRIER WALL SYSTEM.$874.2M
- 2026-04-16BORDER WALL CONSTRUCTION IN THE TUCSON & YUMA SECTORS, AZ$659.0M
- 2026-03-21CONSTRUCTION BORDER BARRIER$572.7M
- 2026-03-19CONSTRUCT BORDER BARRIER$368.5M
- 2026-03-30DESIGN AND CONSTRUCTION OF NEW VERTICAL BARRIER AND POWER DISTRIBUTION$156.8M
Sources
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_70B01C25F00000600_7014_70B01C23D00000009_7014.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.