$572,654,700
CONSTRUCTION BORDER BARRIER
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Construction of border barrier infrastructure along the U.S. southern border under a multi-year contract.
Part of CBP's ongoing border security modernization; $572.7M commitment reflects sustained federal investment in physical border infrastructure.
Demand for construction materials, heavy equipment, and labor in border regions; BCCG joint venture will source subcontractors and suppliers across southwestern U.S.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-17. Cost: $0.002683.
- 2026-03-21CONSTRUCTION OF BORDER BARRIER WALL SYSTEM.$874.2M
- 2026-04-16BORDER WALL CONSTRUCTION IN THE TUCSON & YUMA SECTORS, AZ$659.0M
- 2026-04-01BORDER WALL BARRIER CONSTRUCTION$506.6M
- 2026-03-19CONSTRUCT BORDER BARRIER$368.5M
- 2026-03-30DESIGN AND CONSTRUCTION OF NEW VERTICAL BARRIER AND POWER DISTRIBUTION$156.8M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_70B01C25F00001152_7014_70B01C23D00000009_7014.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.