$368,482,000
Department of Homeland Security·U.S. Customs and Border Protection
justiceactive
WORK BEGAN2025-09-25·LATEST ACTION2026-03-19·SOURCEUSASPENDING·SOURCE IDCONT_AWD_70B01C25F00001151_7014_70B01C23D00000009_7014
Award description
CONSTRUCT BORDER BARRIER
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
The Buildout's read
What the model surfaced from this award
Confidence: high
In plain English
Construction of border barrier infrastructure along the U.S. southern border under a multi-year contract.
Sub-sectors
border-securitycbp-infrastructurebarrier-construction
Why this matters
Part of ongoing CBP border security modernization; $368M commitment reflects sustained federal investment in physical border infrastructure.
Supply-chain signal
Demand for construction materials, steel, concrete, and heavy equipment; contract structure as joint venture suggests subcontracting to regional suppliers.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-18. Cost: $0.002643.
Period of performance
Start
2025-09-25
End
2028-04-13
Status
activein 653 days
Other awards from this recipient
- 2026-03-21CONSTRUCTION OF BORDER BARRIER WALL SYSTEM.$874.2M
- 2026-04-16BORDER WALL CONSTRUCTION IN THE TUCSON & YUMA SECTORS, AZ$659.0M
- 2026-03-21CONSTRUCTION BORDER BARRIER$572.7M
- 2026-04-01BORDER WALL BARRIER CONSTRUCTION$506.6M
- 2026-03-30DESIGN AND CONSTRUCTION OF NEW VERTICAL BARRIER AND POWER DISTRIBUTION$156.8M
Sources
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_70B01C25F00001151_7014_70B01C23D00000009_7014.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.