Database / Awards
Federal awards
Every contract and grant ingested from USAspending.gov. Pick an agency to narrow the list; toggle Highest / Lowest to sort. Click any row to open the full award profile.
Sort by
Agency: Department of Transportation
Results
347 awards
Showing 1–50
| Action date | Recipient | Agency | Amount | Description | Sector |
|---|---|---|---|---|---|
| 2026-05-11 | NATIONAL RAILROAD PASSENGER CORPORATION | Department of Transportation | $2,363,665,840 | FY21 NATIONAL NETWORK COOPERATIVE AGREEMENT TO THE NATIONAL RAILROAD PASSENGER CORPORATION | transportation |
| 2026-05-11 | NATIONAL RAILROAD PASSENGER CORPORATION | Department of Transportation | $2,315,304,160 | FY21 NORTHEAST CORRIDOR COOPERATIVE AGREEMENT TO THE NATIONAL RAILROAD PASSENGER CORPORATION | transportation |
| 2026-06-09 | HARRIS CORPORATION | Department of Transportation | $2,098,072,714 | THE PURPOSE OF THIS DELIVERY ORDER AWARD IS TO ADD FUNDING FOR FTI TELECOMMUNICATIONS SERVICES. | telecom |
| 2026-05-11 | NATIONAL RAILROAD PASSENGER CORPORATION | Department of Transportation | $1,817,500,000 | FY20 NATIONAL NETWORK GRANT TO THE NATIONAL RAILROAD PASSENGER CORPORATION | transportation |
| 2026-06-09 | THE MITRE CORPORATION | Department of Transportation | $1,701,696,967 | CENTER FOR ADVANCED AVIATION DEVELOPMENT (CAASD) FFRDC MITRE | aerospace |
| 2026-06-08 | HARRIS CORPORATION | Department of Transportation | $1,558,797,292 | DAFIS UDO RECONSTRUCT W/O ADVANCE | aerospace |
| 2026-05-11 | NATIONAL RAILROAD PASSENGER CORPORATION | Department of Transportation | $1,283,142,000 | FY2019 NATIONAL NETWORK GRANT TO THE NATIONAL RAILROAD PASSENGER CORPORATION | transportation |
| 2026-05-18 | METROPOLITAN TRANSPORTATION AUTHORITY | Department of Transportation | $1,254,047,167 | APPLICATION PURPOSE: THE PURPOSE IS TO CONSTRUCT THE SECOND AVENUE SUBWAY PHASE 2 PROJECT.; ACTIVITIES PERFORMED: THE PROJECT INCLUDES THE CONSTRUCTION OF THREE NEW STATIONS TRACTION POWER SUBSTATIONS SIGNAL TRACK COMMUNICATION SYSTEMS AND STATION ARCHITECTURAL ELEMENTS AND FACILITIES.; EXPECTED OUTCOMES: THE SECOND AVENUE SUBWAY (SAS) PHASE 2 PROJECT (PROJECT) IS A PLANNED TWO-TRACK 1.76-MILE HEAVY RAIL SUBWAY EXTENSION ALONG THE EAST SIDE OF MANHATTAN. IT WILL CONNECT THE NORTHERN END OF PHASE 1 AT 105TH STREET TO THE 125TH STREET STATION OF THE LEXINGTON AVENUE LINE AND TERMINATE WEST OF THE INTERSECTION OF MALCOLM X BOULEVARD AND 125TH STREET.; INTENDED BENEFICIARIES: COMMUTERS ALONG MANHATTANS EAST SIDE AND USERS OF THE MTA SUBWAY SYSTEM.; SUBRECIPIENT ACTIVITIES: THERE ARE NO SUB-RECIPIENT ACTIVITIES WITH THIS AWARD. | transportation |
| 2026-05-11 | NATIONAL RAILROAD PASSENGER CORPORATION | Department of Transportation | $1,248,700,000 | THE GENERAL OBJECTIVE OF THE PROGRAM FUNDED THROUGH THIS AGREEMENT IS FOR AMTRAKTO MAINTAIN CONTINUED SAFE NATIONAL PASSENGER RAIL OPERATIONS, TO PURSUE ACTIVITIESTHAT SUPPORT EFFICIENT SERVICE TO INTERCITY PASSENGER RAIL RIDERSHIP, AND TO ADDRESS ANDCOMPLY WITH ALL SPECIFIED FEDERAL OPERATING REQUIREMENTS AND MANDATES ON REGIONSOUTSIDE THE NATIONAL NETWORK (NN), KNOWN AS THE NORTHEAST CORRIDOR (NEC). THISINCLUDES NEC INTERCITY OPERATIONS, AND IN MANY CASES, THIS WILL INCLUDE WORK THATPROVIDES A SHARED BENEFIT ACROSS THE NEC AND NATIONAL NETWORK. | transportation |
| 2026-05-11 | NATIONAL RAILROAD PASSENGER CORPORATION | Department of Transportation | $1,184,035,000 | THE GENERAL OBJECTIVE OF THE PROGRAM FUNDED THROUGH THIS AGREEMENT IS FOR AMTRAKTO MAINTAIN CONTINUED SAFE NATIONAL PASSENGER RAIL OPERATIONS, TO PURSUE ACTIVITIESTHAT SUPPORT EFFICIENT SERVICE TO INTERCITY PASSENGER RAIL RIDERSHIP, AND TO ADDRESS ANDCOMPLY WITH ALL SPECIFIED FEDERAL OPERATING REQUIREMENTS AND MANDATES ON REGIONSOUTSIDE THE NEC, KNOWN AS THE NATIONAL NETWORK (NN). THIS INCLUDES ROUTES FORBOTH STATE SUPPORTED AND LONG DISTANCE LINES, AND IN MANY CASES, THIS WILL INCLUDEWORK THAT PROVIDES A SHARED BENEFIT ACROSS THE NEC AND NATIONAL NETWORK. | transportation |
| 2026-05-11 | NATIONAL RAILROAD PASSENGER CORPORATION | Department of Transportation | $1,183,500,000 | FY20 NORTHEAST CORRIDOR GRANT TO THE NATIONAL RAILROAD PASSENGER CORPORATION | transportation |
| 2026-06-15 | METROPOLITAN TRANSPORTATION AUTHORITY | Department of Transportation | $1,138,012,173 | APPLICATION PURPOSE: THIS AWARD WILL REIMBURSE THE MTA FOR NYCT VEHICLE NON-VEHICLE AND FACILITY PREVENTIVE MAINTENANCE.; ACTIVITIES PERFORMED: THE APPLICATION SCOPE OF WORK WILL SUPPORT THE COMPREHENSIVE SERVICING AND PREVENTIVE MAINTENANCE OF VEHICLE NON-VEHICLE AND FACILITY ASSETS REQUIRED TO PRESERVE OR EXTEND THE USEFUL LIFE OF TRANSIT SERVICE OPERATING ASSETS AND MAINTAIN A STATE OF GOOD REPAIR.; EXPECTED OUTCOMES: THIS APPLICATION REIMBURSES MTAS ELIGIBLE EXPENDITURES FOR THE PREVENTIVE MAINTENANCE OF THE NYCT RAIL VEHICLES NON-VEHICLES AND FACILITIES ASSETS TO MAINTAIN A STATE OF GOOD REPAIR.; INTENDED BENEFICIARIES: THE MTA AND ITS RIDERSHIP.; SUBRECIPIENT ACTIVITIES: THE MTA DOES NOT HAVE SUBRECIPIENTS UNDER THIS AWARD. | transportation |
| 2026-06-03 | TRANSPORTATION NORTH CAROLINA DEPARTMENT | Department of Transportation | $1,034,437,050 | PROJECT TITLE: CM/GC - 2024 HURRICANE HELENE - PERMANENT REPAIRS TO I-40 IN HAYWOOD COUNTY :::: PROJECT DESCRIPTION: HIGHWAY RECONSTRUCTION OF I-40 THROUGH PIGEON RIVER GORGE FROM THE TENNESSEE STATE LINE (MILEMARKER 0.0) TO TOM HALL BRANCH (MILEMARKER 5.0) WHICH IS EAST OF THE I-40 DOUBLE CONCRETE ARCH TUNNELS. SEE STATE REMARKS FOR EARLY WORK PACKAGE DETAILS AND SCOPE. ADD EARLY WORK PACKAGE (EWP)#1 (2/19/2025). | transportation |
| 2026-04-02 | MINNESOTA DEPARTMENT OF TRANSPORTATION | Department of Transportation | $884,132,302 | PROJECT TITLE: PRELIMINARY ENGINEERING FOR BLATNIK BRIDGE #9030 IN DULUTH- VARIOUS CONSULTANT AGREEMENTS :::: PROJECT DESCRIPTION: | transportation |
| 2026-04-17 | LEIDOS, INC. | Department of Transportation | $848,580,357 | THE PURPOSE OF THIS CONTRACT IS TO ENHANCE AND MAINTAIN THE EN ROUTE AUTOMATION AND MODERNIZATION (ERAM), INCLUDING THE EN ROUTE INFORMATION DISPLAY SYSTEM (ERIDS), AND TO PRODUCE, IMPLEMENT, AND PROVIDE SUPPORT FOR A LIMITED NUMBER OF ERAM/ERIDS SYS | aerospace |
| 2026-06-15 | THE MITRE CORPORATION | Department of Transportation | $744,577,030 | CAASD MUST PROVIDE ESSENTIAL ENGINEERING, RESEARCH, AND ANALYSIS CAPABILITIES TO SUPPORT THE FAA IN THE PERFORMANCE OF ITS MISSION THROUGH A SYSTEMS APPROACH THAT ADDRESSES ALL DIMENSIONS (E.G. POLITICAL, OPERATIONAL, ECONOMIC, TECHNICAL) REQUIRED TO | aerospace |
| 2026-02-23 | DEPARTMENT OF TRANSPORTATION CONNECTICUT | Department of Transportation | $700,458,338 | THE CONNECTICUT DEPARTMENT OF TRANSPORTATION (CTDOT) IS REQUESTING $332471013 OF FFY2021 SECTION 5307 AMERICAN RESCUE PLAN ACT (ARPA) FUNDS. THIS APPLICATION UTILIZES SECTION 5307 ARPA FUNDING FROM THE GOVERNORS AREA FOR THE EXPENSES OF PUBLIC TRANSPORTATION SYSTEMS AS THEY CONTINUE TO RESPOND TO THE COVID-19 PANDEMIC. THE REQUESTED FUNDS WILL BE USED FOR THE CONTINUATION OF SUPPORT FOR THE OPERATIONAL AND PREVENTATIVE MAINTENANCE EXPENSES DUE TO THE CORONAVIRUS FOR ALL CTTRANSIT BUS SERVICES STATEWIDE NEW HAVEN LINE (NHL) COMMUTER RAIL SERVICES FROM NEW HAVEN TO GRAND CENTRAL TERMINAL IN NY INCLUDING THE 3 BRANCH LINES WATERBURY DANBURY AND NEW CANAAN AND SHORELINE EAST (SLE) COMMUTER RAIL SERVICE FROM NEW HAVEN TO NEW LONDON INCLUDING THROUGH TRAIN SERVICE TO STAMFORD. CTDOT CONTRACTS WITH AMTRAK ON THE SLE AND WITH METRO NORTH ON THE NHL.THE APPLICATION SCOPE OF WORK INCLUDES:1) CTDOT - CTTRANSIT OPERATIONS/PREVENTATIVE MAINTENANCE $80000000 (100% FEDERAL)2) NHL - RAIL OPERATIONS/PREVENTATIVE MAINTENANCE $249471013 (100% FEDERAL)3) SLE - RAIL OPERATIONS/PREVENTATIVE MAINTENANCE $3000000 (100% FEDERAL)IN ACCORDANCE WITH FTAS CIRCULARS 9040.1G AND 9030.1E PREVENTATIVE MAINTENANCE ACTIVITIES ARE CONSIDERED OPERATING COSTS. ACTIVITIES IN THIS GRANT BEGAN ON JANUARY 20 2020 AND WILL CONTINUE THROUGH THE PERIOD OF PERFORMANCE END DATE (SEPTEMBER 30 2029). PER ARP THE GRANT REQUESTS 100% FEDERAL SHARE AND THE ACTIVITIES IN THIS APPLICATION ARE NOT REQUIRED TO BE PROGRAMMED IN THE LONG-RANGE TRANSPORTATION PLAN OR STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM. CTDOT AGREES THAT IF IT RECEIVES FEDERAL FUNDING FROM THE FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) OR THROUGH A PASS-THROUGH ENTITY THROUGH THE ROBERT T. STAFFORD DISASTER RELIEF AND EMERGENCY ASSISTANCE ACT A DIFFERENT FEDERAL AGENCY OR INSURANCE PROCEEDS FOR ANY PORTION OF A PROJECT ACTIVITY APPROVED FOR FTA FUNDING UNDER THIS GRANT AGREEMENT IT WILL PROVIDE WRITTEN NOTIFICATION TO FTA AND REIMBURSE FTA FOR ANY FEDERAL SHARE THAT DUPLICATES FUNDING PROVIDED BY FEMA ANOTHER FEDERAL AGENCY OR AN INSURANCE COMPANY.CTDOT RECEIVED $438720153 IN 5307 CARES FUNDING AND OBLIGATED IT IN GRANT CT-2020-005-01. CTDOT HAS ALREADY EXPENDED 80% OF THE TOTAL ALLOCATION BUT THE COVID-19 PANDEMIC CONTINUES TO CAUSE SIGNIFICANT CHALLENGES AND AS RESULT CTDOT CONTINUES TO REQUIRE ADDITIONAL RELIEF FUNDING.THE FFY 21 GOVERNORS AREA SPLIT AGREEMENT DATED NOVEMBER 3 2021 HAS BEEN SUBMITTED TO FTA AND UPLOADED TO TRAMS.CTDOT PINNED THEIR FY2021 CERTS IN TRAMS. DUNS#: 807854583 | transportation |
| 2026-05-21 | LEIDOS, INC. | Department of Transportation | $667,298,934 | ADVANCED TECHNOLOGIES AND OCEANIC PROCEDURES (ATOP) | aerospace |
| 2026-06-09 | LEIDOS, INC. | Department of Transportation | $659,210,905 | FUTURE FLIGHT SERVICES PROGRAM | aerospace |
| 2026-04-29 | HARRIS CORPORATION | Department of Transportation | $652,892,385 | DAFIS UDO RECONSTRUCT W/O ADVANCE | aerospace |
| 2026-05-11 | NATIONAL RAILROAD PASSENGER CORPORATION | Department of Transportation | $641,750,000 | FY2019 NORTHEAST CORRIDOR GRANT TO THE NATIONAL RAILROAD PASSENGER CORPORATION | transportation |
| 2026-04-02 | STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION | Department of Transportation | $619,100,074 | PROJECT TITLE: I275/SR93 FM N OF HFB TO N OF LOIS,SR60 FM KENNEDY TO N OF SPRUCE/TIA;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB :::: PROJECT DESCRIPTION: I275/SR93 FM N OF HFB TO N OF LOIS,SR60 FM KENNEDY TO N OF SPRUCE/TIA;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB | transportation |
| 2026-06-18 | LEIDOS, INC. | Department of Transportation | $577,438,743 | TERMINAL FLIGHT DATA MANAGER IGF::OT::IGF | aerospace |
| 2026-06-08 | HARRIS CORPORATION | Department of Transportation | $575,688,108 | DAFIS UDO RECONSTRUCT W/O ADVANCE | aerospace |
| 2026-06-15 | PTSI MANAGED SERVICES INC | Department of Transportation | $573,844,709 | THE T5 CONTRACT WILL SUPPORT IMPLEMENTATION OF THE FEDERAL AVIATION ADMINISTRATION AVIATION CIP AND CERTAIN REIMBURSABLE PROGRAMS INCLUDING THOSE ARISING FROM AIP APPROPRIATIONS AND OTHER DIRECTLY FUNDED AND REIMBURSABLE PROJECTS | transportation |
| 2026-04-13 | HONOLULU, CITY & COUNTY OF | Department of Transportation | $500,000,000 | APPLICATION PURPOSE: THE PURPOSE OF THIS AMENDMENT 05 APPLICATION IS TO CONTINUE FUNDING FOR COMPLETION OF A TRUNCATED SCOPE AS APPROVED IN THE AMENDED FFGA EXECUTED ON FEBRUARY 1 2024. THIS AMENDMENT REQUESTS THE OBLIGATION OF $125000000 IN FY2022 SECTION 5309 FUNDING ALLOCATED FOR UZA 150550 HAWAII. THE MODIFIED PROJECT DESCRIPTION CONSISTS OF DESIGN AND CONSTRUCTION OF AN 18.9-MILE GRADE SEPARATED FIXED RAIL SYSTEM FROM EAST KAPOLEI (KUALAKAI STATION) TO THE CIVIC CENTER (KAKAUKUKUI) STATION IN HONOLULU HAWAII. FROM EAST KAPOLEI THE PROJECT PROCEEDS TO THE UNIVERSITY OF HAWAII AT WEST OAHU THEN EAST TO PEARL HARBOR THE DANIEL K. INOUYE INTERNATIONAL AIRPORT THROUGH DOWNTOWN HONOLULU AND ENDS AT THE CIVIC CENTER STATION. THE PROJECT WILL OPERATE IN AN EXCLUSIVE RIGHT-OF-WAY AND WILL BE GRADE SEPARATED EXCEPT FOR A 0.6-MILE AT GRADE SECTION NEAR LEEWARD COMMUNITY COLLEGE. THE PROJECT INCLUDES 19 STATIONS 80 RAIL VEHICLES AND A MAINTENANCE AND STORAGE FACILITY. THE LOCAL MATCHING SHARE IS PRIMARILY FROM THE HONOLULU COUNTY SURCHARGE ON THE STATE OF HAWAIIS GENERAL EXCISE TAX (HONOLULU GET SURCHARGE). OTHER FUNDING SOURCES INCLUDE THE STATE TRANSIT ACCOMMODATIONS TAX AND THE COUNTY OAHU TRANSIT ACCOMMODATIONS TAX. ; ACTIVITIES PERFORMED: THIS APPLICATION SEEKS REIMBURSEMENT FOR ACTIVITIES RELATED TO THE COMPLETION OF SEGMENT I FROM EAST KAPOLEI STATION TO ALOHA STADIUM STATION AND ALSO INCLUDES COMPLETION OF SCOPE ACTIVITIES THROUGH THE AGS CONSTRUCTION SECTION SEGMENT II TO THE MIDDLE STREET TRANSIT CENTER. REIMBURSEMENT WILL ALSO INCLUDE COMPLETED ACTIVITIES FOR VARIOUS UTILITY RELOCATION EFFORTS PROJECT-WIDE INCLUDING ACTIVITIES ALONG THE DILLINGHAM CORRIDOR ALSO KNOWN AS CCUR. THIS WORK AREA INCLUDES UTILITY WORK DONE FROM THE END OF AGS WORK SCOPE LOCATED ALONG THE KAMEHAMEHA HIGHWAY THROUGH DILLINGHAM BOULEVARD AND DOWN THROUGH THE CIVIC CENTER STATION LOCATION TO INCLUDE THE GUIDEWAY TRACKWORK AREAS BEYOND THE TERMINUS OF THE STATION PLATFORM AS REQUIRED AND/OR COMPLETE UTILITY TIE-IN SCOPE OR OTHER THIRD PARTY REQUIREMENTS.; EXPECTED OUTCOMES: EXPECTED OUTCOMES INCLUDE THE REIMBURSEMENT OF SEGMENT I COMPLETED SCOPEWORK AND THE FUNDING OF WORKSCOPE COMPLETED FOR BOTH AGS SEGMENT II AND FINALLY CCUR WORK AREAS. FUNDING OF THIS AMENDMENT WILL ALLOW THE PROJECT TO CONTINUE TO COMPLETE THE CONSTRUCTION OF THE AGS SECTION OF THE PROJECT AND ALSO ASSIST IN THE REIMBURSEMENT OF WESTSIDE PROJECT SCOPE. WORK SCOPE TO BE INCLUDED IN THIS AREA INCLUDE NINE STATIONS 10.75 MILES OF MAINLY GRADE-SEPARATED WITH THE EXCEPTION OF AREAS SURROUNDING THE LEEWARD COMMUNITY COLLEGE STATION AND MAINTENANCE AREA.; INTENDED BENEFICIARIES: BENEFICIARIES OF THIS PROJECT INCLUDE BOTH RESIDENTS AND NON-RESIDENTS OF THE CITY AND COUNTY OF HONOLULU AND THE STATE OF HAWAII.; SUBRECIPIENT ACTIVITIES: NONE. | transportation |
| 2026-06-08 | LOCKHEED MARTIN SERVICES, LLC | Department of Transportation | $494,427,738 | WA-10-03770-- INCREMENTAL FUNDING - NEXTGEN HD TRAJECTORY MGMT-ARRIVAL TACTICAL FLOW_TBFM_ PROGRAM 'NEW CONTRACT'. TO PROVIDE PROGRAM MANAGEMENT, SYSTEMS ENGINEERING, SYSTEM DESIGN, SYSTEM TEST AND EVALUATION, TRAINING, IMPLEMENTATION, INTEGRATED LOGISTICS SUPPORT & ENGINEERING SUPPORT. TENTATIVE CONTRACT DTFAWA-10-C-00052. PERIOD OF PERFORMANCE --TBD (BASE PERIOD (5 YEARS) WITH 5 OPTION YEARS A TOTAL OF 10 YEARS) 10-AJR4500-6000 TAS::69 8107::TAS | aerospace |
| 2026-06-15 | RAYTHEON COMPANY | Department of Transportation | $423,106,225 | THIS CONTRACT IS AWARDED UNDER THE RADAR SYSTEM REPLACEMENT QUALIFIED SYSTEM LIST, ESTABLISHED IN ALIGNMENT WITH THE SECRETARY OF TRANSPORTATIONS VISION AND PLAN FOR A NEXT-GENERATION BRAND-NEW AIR TRAFFIC CONTROL SYSTEM . THIS C | aerospace |
| 2026-04-02 | OHIO DEPARTMENT OF TRANSPORTATION | Department of Transportation | $400,000,000 | PROJECT TITLE: BRENT SPENCE BRIDGE CORRIDOR :::: PROJECT DESCRIPTION: THE CONSTRUCTION OF THE BRENT SPENCE BRIDGE CORRIDOR PROJECT¿INCLUDING THE COMPANION BRIDGE¿FROM JUST SOUTH OF DIXIE HIGHWAY INTERCHANGE IN KENTUCKY NORTH TO LINN ST. IN OHIO. PROJECT WILL BE LED BY ODOT. | transportation |
| 2026-04-02 | OHIO DEPARTMENT OF TRANSPORTATION | Department of Transportation | $400,000,000 | PROJECT TITLE: BRENT SPENCE BRIDGE CORRIDOR :::: PROJECT DESCRIPTION: THE CONSTRUCTION OF THE BRENT SPENCE BRIDGE CORRIDOR PROJECT¿INCLUDING THE COMPANION BRIDGE¿FROM JUST SOUTH OF DIXIE HIGHWAY INTERCHANGE IN KENTUCKY NORTH TO LINN ST. IN OHIO. PROJECT WILL BE LED BY ODOT. | transportation |
| 2026-06-09 | ROHDE & SCHWARZ USA, INC. | Department of Transportation | $389,941,324 | DELIVERY ORDER FOR SUPPLIES AND SERVICES FOR VOICE COMMUNICATION SYSTEMS (VCS'). THIS DELIVERY ORDER DEFINITIZES LETTER CONTRACT 693KA8-25-C-00010 IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF IDIQ CONTRACT 693KA8-26-D-00002. | aerospace |
| 2026-06-01 | GENERAL DYNAMICS MISSION SYSTEMS, INC. | Department of Transportation | $386,459,874 | NEXCOM SEGMENT II, UHF/VHF RADIOS TAS::69 8107::TAS | aerospace |
| 2026-06-08 | NEW JERSEY TRANSIT CORPORATION | Department of Transportation | $380,007,738 | APPLICATION PURPOSE: THE PURPOSE OF PREVENTIVE MAINTENANCE ACTIVITIES TYPICALLY INCLUDES REPAIR MAINTENANCE AND SERVICING OF REVENUE AND NON-REVENUE FLEETS AS WELL AS FACILITIES TO ENSURE RELIABLE PERFORMANCE AND MAXIMIZATION OF ASSET USEFUL LIFE.; ACTIVITIES PERFORMED: PREVENTIVE MAINTENANCE ACTIVITIES AS PER FTA C9030.1E INCLUDE REPAIR MAINTENANCE AND SERVICING OF REVENUE AND NON-REVENUE FLEETS AS WELL AS FACILITIES TO ENSURE RELIABLE PERFORMANCE AND MAXIMIZATION OF ASSET USEFUL LIFE.; EXPECTED OUTCOMES: TO PRESERVE OR EXTEND THE FUNCTIONALITY AND SERVICEABILITY OF NJTS EXISTING ASSETS. SPECIFICALLY OPERATING PREVENTIVE MAINTENANCE EXPENSES ASSOCIATED WITH INSPECTION CLEANING REPAIRING AND REPLACING COMPONENTS AND SERVICING OF VEHICLES EQUIPMENT YARDS AND FACILITIES. ALL PREVENTATIVE MAINTENANCE ACTIVITIES FUNDED BY THIS GRANT WILL OCCUR WITHIN NJ TRANSITS EXISTING RIGHT OF WAY.; INTENDED BENEFICIARIES: RESIDENTS OF NEW JERSEY AND THE PUBLIC UTILIZE THE NJ TRANSIT PUBLIC TRANSPORTATION SYSTEM THROUGHOUT NEW JERSEY NEW YORK CITY PHILADELPHIA AND SURROUNDING STATES AND METROPOLITAN AREAS.; SUBRECIPIENT ACTIVITIES: THERE ARE NO SUBRECIPIENTS. | transportation |
| 2026-04-02 | ARKANSAS DEPARTMENT OF TRANSPORTATION | Department of Transportation | $341,605,116 | PROJECT TITLE: I-530 - HWY. 67 (WIDENING & RECONST.) (I-30 & I-40)(F) :::: PROJECT DESCRIPTION: WIDENING & RECONSTRUCTION | transportation |
| 2026-06-09 | L3HARRIS TECHNOLOGIES, INC. | Department of Transportation | $338,571,299 | VOICE SWITCHING AND CONTROL SYSTEMS (VSCS) | aerospace |
| 2026-06-08 | CITY & COUNTY OF SAN FRANCISCO | Department of Transportation | $323,018,101 | 3RD ST LT RAIL -PHASE II -CENTRAL SUBWAY | transportation |
| 2026-04-27 | SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY | Department of Transportation | $317,160,000 | APPLICATION PURPOSE: TO PROVIDE FUNDS FOR THE CRITICAL REPLACEMENT OF THE MARKET-FRANKFORD LINE FLEET.; ACTIVITIES PERFORMED: MARKET FRANKFORD LINE FLEET REPLACEMENT; EXPECTED OUTCOMES: CONTINUE TO PROVIDE CLEAN SAFE AND RELIABLE TRANSPORTATION AND TO IMPROVE MOBILITY AND ACCESS THROUGHOUT THE PHILADELPHIA REGION.; INTENDED BENEFICIARIES: PROVIDE TRANSPORTATION SERVICES TO RESIDENTS/TRAVELERS IN THE PHILADELPHIA PA REGION.; SUBRECIPIENT ACTIVITIES: N/A | transportation |
| 2026-06-15 | TOTE SERVICES, LLC | Department of Transportation | $309,561,461 | THE CONTRACTOR IS HEREBY TASKED TO DELIVER NSMV V TO THE GOVERNMENT (IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THE CONTRACT) AT A FIRM-FIXED PRICE OF $301,711,505.00. THIS DELIVERY ORDER ALSO PROVIDES AND OBLIGATES THE FUND ($301,711,505.00) FO | transportation |
| 2026-04-13 | WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY | Department of Transportation | $301,321,807 | THE WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY (WMATA) IS APPLYING FOR $102400000 IN FFY2022 SECTION 5337 STATE OF GOOD REPAIR (SOGR) PROGRAM FUNDS APPORTIONED TO THE URBANIZED AREA (UZA). THIS REQUEST IS CONSISTENT WITH THE SUBALLOCATION OF FUNDS AS AGREED TO AMONG THE THREE RECIPIENTS WITHIN THE UZA OF THE DISTRICT OF COLUMBIA VIRGINIA AND MARYLAND. WMATAS SPLIT LETTER IS ATTACHED TO THIS APPLICATION. THIS REQUEST IS COMPRISED OF $5150378 IN HIGH INTENSITY MOTORBUS (HIMB) FUNDING AND $97249622 IN SOGR FORMULA FUNDING. THESE FUNDS REQUIRE A 20% LOCAL MATCH IN THE AMOUNT OF $25600000. THE NON-FEDERAL SHARE WILL BE PROVIDED BY THE DISTRICT OF COLUMBIA THE STATE OF MARYLAND AND PARTICIPATING JURISDICTIONS IN THE COMMONWEALTH OF VIRGINIA. WMATAS CURRENT TRANSIT ASSET MANAGEMENT (TAM) PLAN WAS ADOPTED ON OCTOBER 21 2018 AND WILL BE UPDATED IN ACCORDANCE WITH CURRENT REGULATIONS BY OCTOBER 2022. PROJECTS INCLUDED HEREIN REFLECT THE GOALS OF THE TAM PLAN. THE APPLICATIONS FUNDS THE PROJECTS AND ACTIVITIES LISTED BELOW. PURPOSE OF AWARD: THE PURPOSE OF THIS AWARD IS TO PROVIDE ROUTINE AND SCHEDULED PREVENTIVE MAINTENANCE OF METROS SYSTEM TRACK AND STRUCTURES AND METRO RAILCAR FLEET. ACTIVITIES TO BE PERFORMED: WMATA WILL CONDUCT ROUTINE AND SCHEDULED MAINTENANCE OF METROS RAILCAR FLEET AND PREVENTIVE MAINTENANCE OF TRACK ALONG THE MAINLINE AND YARDS AND REHABILITATION OF TRACK STRUCTURES. EXPECTED OUTCOME: WMATA WILL PROVIDE SAFE AND RELIABLE RAIL TRANSIT SYSTEM FOR ITS CUSTOMERS AND WMATA EMPLOYEES AND PROVIDE MODERN OPERATIONAL FACILITIES FOR MAINTAINING ASSETS AND RAIL OPERATIONS AND ENSURE A STATE OF GOOD REPAIR OF ITS ASSETS. INTENDED BENEFICIARIES: WMATAS BENEFICIARIES ARE WMATA EMPLOYEES AND WMATA CUSTOMERS WHO COMMUTE WITHIN OR CONNECT TO PUBLIC TRANSIT WITHIN THE DISTRICT OF COLUMBIA VIRGINIA AND MARYLAND REGION. SUBRECIPIENT ACTIVITIES: THERE ARE NO SUBRECIPIENTS ASSOCIATED WITH THIS AWARD. | transportation |
| 2026-03-03 | DEPARTMENT OF TRANSPORTATION CALIFORNIA | Department of Transportation | $299,974,280 | PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25 | transportation |
| 2026-06-01 | NEW JERSEY TRANSIT CORPORATION | Department of Transportation | $294,272,553 | APPLICATION PURPOSE: THE PURPOSE OF PREVENTIVE MAINTENANCE ACTIVITIES INCLUDE REPAIR MAINTENANCE AND SERVICING OF REVENUE AND NON-REVENUE FLEETS AS WELL AS FACILITIES TO ENSURE RELIABLE PERFORMANCE AND MAXIMIZATION OF ASSET USEFUL LIFE.; ACTIVITIES PERFORMED: PREVENTIVE MAINTENANCE ACTIVITIES AS PER FTA C9030.1E INCLUDE REPAIR MAINTENANCE AND SERVICING OF REVENUE AND NON-REVENUE FLEETS AS WELL AS FACILITIES TO ENSURE RELIABLE PERFORMANCE AND MAXIMIZATION OF ASSET USEFUL LIFE.; EXPECTED OUTCOMES: TO PRESERVE OR EXTEND THE FUNCTIONALITY AND SERVICEABILITY OF NJTS EXISTING ASSETS. SPECIFICALLY PREVENTIVE MAINTENANCE EXPENSES ASSOCIATED WITH INSPECTION CLEANING REPAIRING AND REPLACING COMPONENTS AND SERVICING OF VEHICLES EQUIPMENT YARDS AND FACILITIES. ALL PREVENTATIVE MAINTENANCE ACTIVITIES FUNDED BY THIS GRANT WILL OCCUR WITHIN NJ TRANSITS EXISTING RIGHT OF WAY.; INTENDED BENEFICIARIES: RESIDENTS OF NEW JERSEY AND THE PUBLIC UTILIZE THE NJ TRANSIT PUBLIC TRANSPORTATION SYSTEM THROUGHOUT NEW JERSEY NEW YORK CITY PHILADELPHIA AND SURROUNDING STATES AND METROPOLITAN AREAS.; SUBRECIPIENT ACTIVITIES: THERE ARE NO SUBRECIPIENTS. | transportation |
| 2026-04-06 | DEPARTMENT OF TRANSPORTATION CONNECTICUT | Department of Transportation | $283,440,000 | APPLICATION PURPOSE: CTDOT IS REQUESTING $283440000 (FEDERAL); $354300000 (TOTAL) OF SECTION 5307 FUNDS FOR THE FOLLOWING PROJECTS:- WATERBURY BRANCH RAILROAD STATIONS (WATERBURY ANSONIA BEACON FALLS SEYMOUR)- NHRY - MASTER COMPLEX CAR DIESEL SHOP- STAMFORD MOE- WALK BRIDGE-UNDERGRADE BRIDGES/ MNR FORCE ACCOUNT (TIME-2)- NHL TRACK PROGRAM; ACTIVITIES PERFORMED: - WATERBURY BRANCH STATIONS- CONSTRUCTION ACTIVITIES AT WATERBURY RAILROAD STATION ANSONIA RAILROAD STATION PLATFORM BEACON FALL RAILROAD STATION PLATFORM SEYMOUR RAILROAD STATION PLATFORM AND WATERBURY PLATFORM WILL ALL BE REPLACED.- NHRY MASTER COMPLEX CAR AND DIESEL SHOP- REHAB/RENOVATION IMPROVEMENTS AT THE - STAMFORD MAINTENANCE OF EQUIPMENT FACILITY- MOE FACILITY: ROOF REPLACEMENT HVAC REPLACEMENT IMPROVEMENTS TO OFFICE AND STAFF SUPPORT AREAS EXTENSION OF TRACK 44 NEW SHOP AIR COMPRESSORS FALL PROTECTION SYSTEMS IT AND SECURITY UPGRADES ELECTRICAL IMPROVEMENTS NEW TRANSFORMER AND AN ADDITION OF A STANDBY GENERATOR.- WALK BRIDGE-THE REPLACEMENT OF THE WALK BRIDGE. THE OBJECTIVE OF THE WALK BRIDGE REPLACEMENT PROJECT IS TO REPLACE THE EXISTING DETERIORATED BRIDGE WITH A RESILIENT BRIDGE STRUCTURE WHICH WILL ENHANCE THE SAFETY AND RELIABILITY OF RAIL SERVICE OFFER OPERATIONAL FLEXIBILITY AND EASE OF MAINTENANCE AND PROVIDE FOR INCREASED CAPACITY AND EFFICIENCIES OF RAIL TRANSPORTATION ALONG THE NHL/NEC WHILE IMPROVING NAVIGATIONAL CAPACITY AND DEPENDABILITY FOR MARINE TRAFFIC IN THE NORWALK RIVER. - EAST AVENUE BRIDGE- BRIDGE NO. 03691R METRO-NORTH RAILROAD MP 42.14 OVER EAST AVENUE- THE PROJECT INCLUDES THE IMPROVEMENTS TO THE ADJACENT EAST NORWALK MNR STATION PLATFORMS AND THE FULL DEMOLITION AND REPLACEMENT OF THE STRUCTURE. - FORT POINT STREET BRIDGE- BRIDGE NO. 04131R METRO-NORTH RAILROAD MP 41.79 OVER FORT POINT STREET- THE EXISTING SUPERSTRUCTURE WILL BE DEMOLISHED AND REPLACED. ADDITIONAL ELEMENTS OF THE PROJECT INCLUDE TRACK AND RAIL SYSTEMS WORK EXTENDING.- PACKAGE F FORCE ACCOUNT (TIME 2)- THIS WORK WILL INCLUDE ALL MNR RAILROAD PROTECTIVE SERVICES AS REQUIRED ENGINEERING/DESIGN PROJECT MANAGEMENT DOCUMENT SUBMITTAL AND REVIEW AS REQUIRED THROUGHOUT THE DURATION OF THE TIME-2 PROJECTS- NHL TRACK PROGRAM- ACTIVITIES INCLUDE THE CONTINUED PURCHASE AND INSTALLATION OF TIES TURNOUTS CONTINUOUS WELDED RAIL AS WELL AS SURFACING TRACK MILES.; EXPECTED OUTCOMES: WATERBURY BRANCH PROJECTS: THE PLATFORMS WILL BE FULLY ADA COMPLIANT AND MEET THE CURRENT MNR/CTDOT OFFICE OF RAIL REQUIREMENTS FOR LIGHTING SECURITY AND PASSENGER AMENITIES. THE PROJECT WILL ALSO INCLUDE PEDESTRIAN SAFETY AND TRAFFIC IMPROVEMENTS. THE RAILROAD STATION PLATFORM REPLACEMENTS WILL ALSO MAINTAIN FIXED GUIDEWAY STATE OF GOOD REPAIR.NHRY MASTER COMPLEX: REHAB/RENOVATION TO IMPROVE THE CONFIGURATION OF THE CAR DIESEL SHOP TO BETTER SUPPORT THE CURRENT AND PROPOSED VEHICLE MAINTENANCE PROGRAMS FOR THE CTRAIL FLEET.WALK/ STAMFORD MOE/UNDERGRADE BRIDGES/FORCE ACCOUNT- ENHANCE THE SAFETY AND RELIABILITY OF RAIL SERVICE OFFER OPERATIONAL FLEXIBILITY AND EASE OF MAINTENANCE AND PROVIDE FOR INCREASED CAPACITY AND EFFICIENCIES OF RAIL TRANSPORTATION ALONG THE NHL/NEC WHILE IMPROVING NAVIGATIONAL CAPACITY AND DEPENDABILITY FOR MARINE TRAFFIC IN THE NORWALK RIVER.TRACK PROGRAM: ALL WORK IS BASED ON THE ANNUAL CYCLE IN ORDER TO MAINTAIN OPERATING SPEEDS AND COMFORT.; INTENDED BENEFICIARIES: BENEFICIARIES OF THIS PROJECT INCLUDE THE NORTHEAST CORRIDOR METRO-NORTH RAILROAD AMTRAK THE NEW HAVEN LINE PASSENGERS AS WELL AS TRANSIT COMMUTERS STATEWIDE.RESIDENTS AND RAIL PASSENGERS ACROSS THE STATE OF CONNECTICUT.; SUBRECIPIENT ACTIVITIES: BRIDGES REPLACEMENT - DEMOLITION AND REPLACEMENT/CONSTRUCTIONWORK FORCES - MNR RAILROAD PROTECTIVE SERVICES AS REQUIRED ENGINEERING/DESIGN PROJECT MANAGEMENT DOCUMENT SUBMITTAL AND REVIEW | transportation |
| 2026-06-03 | CITY OF LONG BEACH | Department of Transportation | $283,375,812 | AWARD PURPOSE THE PROJECT WILL COMPLETE THE PIER B ONDOCK RAIL SUPPORT FACILITY PROGRAM BY COMPLETING THE NORTH RAIL YARD EXPANSION AND THE SOUTH RAIL YARD EXPANSION. THE NORTH RAIL YARD EXPANSION WILL CONSTRUCT TWO NEW MAINLINE TRACKS FIVE NEW APPROXIMATELY 10000 FOOT RECEIVING AND DEPARTURE TRACKS EXTENDING FROM WEST OF THE DOMINGUEZ CHANNEL TO THE PICO AVENUE RAIL CORRIDOR AND 28 NEW STORAGE TRACKS NORTH OF THE EXISTING PIER B YARD. IT ALSO INCLUDES ACTIVE AT GRADE WARNING DEVICES AND RAILROAD PREEMPTION WITH A NEW TRAFFIC SIGNAL AT PIER B STREET. THE SOUTH RAIL YARD EXPANSION WILL ADD SEVEN NEW APPROXIMATELY 3000 FOOT STORAGE TRACKS LENGTHEN AND REHABILITATE SEVEN EXISTING APPROXIMATELY 3000 FOOT STORAGE TRACKS CONSTRUCT TWO NEW TRACKS IN THE PICO AVENUE RAIL CORRIDOR RECONFIGURE TRACKS NEAR PIER D STREET AND CONSTRUCT A NEW COMPRESSED AIR FACILITY. ACTIVITIES TO BE PERFORMED ELEMENT 1 CONSTRUCTION PHASE ARCHITECTURAL AND ENGINEERING A AND E. ENGINEERING DURING CONSTRUCTION MANAGEMENT PROJECT MANAGEMENT AND CONSTRUCTION SUPPORT DURING BID AND AWARD CONSTRUCTION AND CLOSEOUT. ELEMENT CONSTRUCTION CONSTRUCT TWO NEW MAINLINE TRACKS FIVE NEW APPROXIMATELY 10000 FOOT RECEIVING AND DEPARTURE TRACKS EXTENDING FROM WEST OF THE DOMINGUEZ CHANNEL TO THE PICO AVENUE RAIL CORRIDOR 28 NEW STORAGE TRACKS NORTH OF THE EXISTING PIER B YARD CONSTRUCT THE ROADWAY KNUCKLE AT HARBOR AVENUE AND 11TH STREET RECONSTRUCTED EXISTING PIER B RAIL YARD BY ADDING SEVEN NEW APPROXIMATELY 3000 FOOT STORAGE TRACKS AND LENGTHEN AND REHABILITATE SEVEN EXISTING APPROXIMATELY 3000 FOOT STORAGE TRACKS CONSTRUCT TWO NEW TRACKS IN THE PICO AVENUE RAIL CORRIDOR RECONFIGURE MEAD YARD LADDER AND LEAD TRACK ACROSS ANAHEIM WAY AND ADD ACTIVE AT GRADE WARNING DEVICES AND RAILROAD PRE EMPTION WITH A NEW TRAFFIC SIGNAL AT PIER B STREET RECONFIGURE TRACKS NEAR PIER D STREET AND CONSTRUCT A NEW COMPRESSED AIR FACILITY WITH ASSOCIATED PIPING WITHIN THE RAIL YARD. APPROXIMATE TOTAL PROJECT QUANTITIES INCLUDE 175000 FEET OF NEW TRACK 150 NEW ITEMS OF SPECIAL TRACK WORK AND 150REMOTELY CONTROLLED POWER SWITCH OPERATORS. DELIVERABLES EXPECTED OUTCOMES FROM PAGE 10 SCHEDULE G OF THE GRANT AGREEMENT INTENDED BENEFICIARY CITY OF LONG BEACH. SUBRECIPIENT ACTIVITIES NONE. MEASURE FREIGHT MOVEMENTS. PROJECTED OUTCOME AN INCREASE IN THE TOTAL NUMBER OF CONTAINERS MOVED BY ON DOCK RAIL. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS A TABLE THAT SHOWS THE TOTAL NUMBER OF CONTAINERS AND THE TOTAL NUMBER OF CONTAINERS MOVED BY ON DOCK RAIL IN THE STUDY AREA. MEASUREMENT FREQUENCY ANNUAL. MEASURE GROSS TONS. PROJECTED OUTCOME AN INCREASE IN CARGO TONNAGE MOVED THROUGH MARINE TERMINALS. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS THE TOTAL NUMBER OF GROSS SHORT TONS THAT MOVED THROUGH THE STUDY ARE. MEASUREMENT FREQUENCY ANNUAL. | transportation |
| 2026-06-02 | NOBLIS, INC. | Department of Transportation | $281,612,958 | IGF::OT::IGF EPICS UNRESTRICTED CONTRACT; NOBLIS; # DTFAWA-17-D-00014 ON TASK ORDER # 0005 ENTERPRISE ENGINEERING SERVICES SUPPORT | aerospace |
| 2026-06-18 | DEPARTMENT OF TRANSPORTATION ARIZONA | Department of Transportation | $280,160,739 | PROJECT TITLE: STATE ROUTE (SR) 30: SR 303L TO SR 202L, IN PHOENIX :::: PROJECT DESCRIPTION: RIGHT OF WAY ACQUISITION | transportation |
| 2026-06-18 | STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION | Department of Transportation | $278,235,871 | PROJECT TITLE: SR23(FIRST COAST XWAY) FROM EAST OF CR16A (SPUR) TO EAST OF CR209 ;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB :::: PROJECT DESCRIPTION: SR23(FIRST COAST XWAY) FROM EAST OF CR16A (SPUR) TO EAST OF CR209 ;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | transportation |
| 2026-04-15 | GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC. | Department of Transportation | $277,976,190 | EACH DELIVERY AND/OR TASK ORDER WILL OBLIGATE FUNDING FOR SERVICES ORDERED UNDER THIS CONTRACT. TAS::69 1301::TAS | aerospace |
| 2026-05-26 | METROPOLITAN TRANSPORTATION AUTHORITY | Department of Transportation | $269,402,580 | APPLICATION PURPOSE: THIS AWARD WILL ASSIST THE MTA TO INVEST CAPITAL FUNDING INTO ITS ASSETS/INFRASTRUCTURE MAINTAINED BY LIRR AND MNR INCLUDING THE ANNUAL TRACK MAINTENANCE PROGRAM.; ACTIVITIES PERFORMED: THE APPLICATION SCOPE OF WORK INCLUDES STATE OF GOOD REPAIR PROJECTS FOR LIRR MNR.; EXPECTED OUTCOMES: THIS APPLICATION WILL SUPPORT THE MTAS NEED TO REHABILITATE AND REPLACE ASSETS TO ACHIEVE A STATE OF GOOD REPAIR.; INTENDED BENEFICIARIES: THE MTA AND ITS RIDERSHIP.; SUBRECIPIENT ACTIVITIES: THE MTA DOES NOT HAVE SUBRECIPIENTS UNDER THIS AWARD. | transportation |
| 2026-03-09 | NORTHEAST ILLINOIS RAILROAD CO | Department of Transportation | $247,570,087 | APPLICATION PURPOSE: THIS GRANT WHICH INCLUDES SECTION 5337 AND SECTION 5307 FUNDING IS TO BE USED BY METRA FOR REHABILITATION AND IMPROVEMENTS THROUGHOUT THE SIX-COUNTY SYSTEM TO BRING EXISTING ASSETS INTO A STATE OF GOOD REPAIR AND RENEW THE ROLLING STOCK FLEET.; ACTIVITIES PERFORMED: ACTIVITIES WILL INCLUDE RAIL CAR AND LOCOMOTIVE IMPROVEMENTS AND REHABILITATION KEEPING THE RAILROAD RIGHT-OF-WAY BRIDGES AND RETAINING WALLS IN A STATE OF GOOD REPAIR VARIOUS IMPROVEMENTS TO YARD FACILITIES SIGNAL AND COMMUNICATIONS EQUIPMENT ELECTRICAL POWER DISTRIBUTION AND STATION FACILITIES AS WELL AS OVERSIGHT OVER THESE PROJECTS AND DESIGN OF UPCOMING PROJECTS.; EXPECTED OUTCOMES: THE PROJECTS TO BE FUNDED BY THIS GRANT WILL HELP REDUCE METRAS STATE OF GOOD REPAIR BACKLOG REPLACE OUTDATED AND OBSOLETE EQUIPMENT IMPROVE SERVICE RELIABILITY AND EFFICIENCY.; INTENDED BENEFICIARIES: THE PROJECTS TO BE FUNDED UNDER THIS GRANT WILL BENEFIT METRA RIDERS THROUGHOUT THE SIX-COUNTY REGION THAT METRA SERVES.; SUBRECIPIENT ACTIVITIES: THERE ARE NO SUBRECIPIENTS ON THIS GRANT. | transportation |
| 2026-06-03 | TRANSPORTATION NORTH CAROLINA DEPARTMENT | Department of Transportation | $245,622,842 | PROJECT TITLE: I-26 FR NC 146 (LONG SHOALS RD) @ EXIT 37 TO I-40 :::: PROJECT DESCRIPTION: I-26 FR NC 146 (LONG SHOALS RD) @ EXIT 37 TO I-40; ADD ADDITIONAL LANES | transportation |
Page 1 of 7
← PreviousNext →