| Action date | Recipient | Agency | Amount | Description | Sector |
|---|---|---|---|---|---|
| 2026-04-20 | SCIENCE APPLICATIONS INTERNATIONAL CORP | Department of Transportation | $62,759,179 | THIS IS NEW SAIC INFRASTRUCTURE TASK ORDER AND INCREMENTAL FUNDING IN THE AMOUNT OF $12,651,796.45 IS PROVIDED THROUGH 10/31/2024. | transportation |
| 2026-04-02 | STATE OF SOUTH DAKOTA | Department of Transportation | $62,647,884 | PROJECT TITLE: COUNTY OF PENNINGTON; US385 RECONSTRUCTION :::: PROJECT DESCRIPTION: GRADING, INTERIM SURFACING REPLACE STRUCTURE (RCBC), AC SURFACING, CRACK & SEAT, CURB & GUTTER, AND GUARDRAIL; US385 - FM 1.5 MI N OF US16 TO 4 N OF THE SD44 JCT | transportation |
| 2026-05-19 | KANSAS DEPARTMENT OF TRANSPORTATION | Department of Transportation | $62,630,734 | PROJECT TITLE: BRIDGE #136 ON US-69 (18TH ST. EXPRESSWAY) IN WY CO :::: PROJECT DESCRIPTION: SCOPE: BRIDGE REPLACEMENT, BRIDGE REHABILITATION AND PAVEMENT REPLACEMENT, INCLUDING BARRIER REPLACEMENT, BETWEEN BRIDGES LOCATION: BRIDGE #132 (RUBY AVENUE); BRIDGE #134 (METROPOLITAN AVENUE); BRIDGE #136 (18TH STREET EXPRESSWAY); BRIDGE #138 (KCT RAILWAY); BRIDGE #140 (OSAGE AVENUE) | transportation |
| 2026-04-17 | STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION | Department of Transportation | $62,176,543 | PROJECT TITLE: I-275 (HOWARD FRKL) FROM N OF SR687(4TH ST N) TO N OF HOWARD FRANKLAND;BRIDGE-REPLACE AND ADD LANES;PRELIMINARY ENGINEER;DB :::: PROJECT DESCRIPTION: I-275 (HOWARD FRKL) FROM N OF SR687(4TH ST N) TO N OF HOWARD FRANKLAND;BRIDGE-REPLACE AND ADD LANES;PRELIMINARY ENGINEER;DB | transportation |
| 2026-04-06 | KBR WYLE SERVICES, LLC | Department of Transportation | $61,768,412 | IGF::OT::IGF | transportation |
| 2026-05-04 | SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY | Department of Transportation | $61,712,000 | APPLICATION PURPOSE: TO PROVIDE FUNDING FOR SEPTAS CAPITAL PROGRAM.; ACTIVITIES PERFORMED: FY 2024 PREVENTIVE MAINTENANCE; EXPECTED OUTCOMES: MAINTENANCE OF SEPTA ASSETS AND FACILITIES. SEPTA WILL CONTINUE TO PROVIDE CLEAN SAFE AND RELIABLE TRANSPORTATION AND TO IMPROVE MOBILITY AND ACCESS THROUGHOUT THE PHILADELPHIA REGION.; INTENDED BENEFICIARIES: RESIDENTS TRAVELERS AND SEPTA STAFF IN THE PHILADELPHIAPA REGION.; SUBRECIPIENT ACTIVITIES: N/A | transportation |
| 2026-03-18 | TRANSPORTATION & DEVELOPMENT LOUISIANA D | Department of Transportation | $61,287,119 | PROJECT TITLE: LA 302: BAYOU BARATARIA MB REPL PHASE 1 :::: PROJECT DESCRIPTION: SCOPE: CONSTRUCTION OF THE MAIN SPAN AND OPERATOR HOUSE FOR REPLACEMENT OF THE LEO KERNER MOVABLE BRIDGE. PHASE 1 OF H.002264 | transportation |
| 2026-04-17 | STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION | Department of Transportation | $60,818,672 | PROJECT TITLE: I-75 (SR 93) AT SR 72 (CLARK ROAD) INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION :::: PROJECT DESCRIPTION: I-75 (SR 93) AT SR 72 (CLARK ROAD) INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION | transportation |
| 2026-04-29 | WALSH FEDERAL LLC | Department of Transportation | $60,657,995 | CHS TRACON - CONSTRUCTION | transportation |
| 2026-03-30 | PERATON INC. | Department of Transportation | $60,653,374 | THIS DELIVERY ORDER IS FOR THE RADARS NEEDS PACKAGE. ALL OTHER TERMS AND CONDITIONS OF THE CONTRACT REMAIN UNCHANGED AND IN FULL EFFECT. | transportation |
| 2026-04-17 | RHODE ISLAND DOT | Department of Transportation | $60,496,837 | PROJECT TITLE: DESIGN BUILD SERVICES FOR THE RECONSTRUCTION OF THE I-95 VIADUCT NORTHBOUND, PROVIDENCE - GARVEE FUNDS :::: PROJECT DESCRIPTION: DESIGN BUILD SERVICES FOR THE I-95 VIADUCT NORTHBOUND OVER WOONASQUATUCKET RIVER, AMTRAK NEC, CITY STREETS AND RAMPS, MAJOR REHABILITATION WORK, SUPERSTRUCTURE, AND/OR TOTAL BRIDGE REPLACEMENT. PROVIDENCE - GARVEE FUNDS - PROJECT MANAGER: A. POMPEI | transportation |
| 2026-04-17 | WVDOT DIVISION OF HIGHWAYS | Department of Transportation | $60,300,000 | PROJECT TITLE: EUGENE A. CARTER MEMORIAL BRIDGE + 3 :::: PROJECT DESCRIPTION: KANAWHA, I 64 - MP 57.448 TO 57.874, JCT I 64 (US 60 - WV 61), BRIDGE REHABILITATION, CONSTRUCTION. | transportation |
| 2026-04-02 | STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION | Department of Transportation | $60,146,710 | PROJECT TITLE: SR 400 (I-4) E OF SR 522 (OSCEOLA PKWY) TO WEST OF SR 528;ADD LANES & RECONSTRUCT;RIGHT OF WAY;DB :::: PROJECT DESCRIPTION: SR 400 (I-4) E OF SR 522 (OSCEOLA PKWY) TO WEST OF SR 528;ADD LANES & RECONSTRUCT;RIGHT OF WAY;DB | transportation |
| 2026-04-17 | STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION | Department of Transportation | $59,868,857 | PROJECT TITLE: SR 30 (US 98) FROM BAYSHORE ROAD TO PORTSIDE DRIVE;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB :::: PROJECT DESCRIPTION: SR 30 (US 98) FROM BAYSHORE ROAD TO PORTSIDE DRIVE;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB | transportation |
| 2026-05-19 | TRANSPORTATION & DEVELOPMENT LOUISIANA D | Department of Transportation | $59,850,541 | PROJECT TITLE: STATEWIDE IN-DEPTH BRIDGE INSPECTION :::: PROJECT DESCRIPTION: STATEWIDE IN-DEPTH BRIDGE INSPECTION | transportation |
| 2026-03-18 | WVDOT DIVISION OF HIGHWAYS | Department of Transportation | $59,614,780 | PROJECT TITLE: WV 72 I/C - PARSONS :::: PROJECT DESCRIPTION: RANDOLPH, US 48, WV 72 I/C -ROARING RUN BR, GRADE AND DRAIN | transportation |
| 2026-04-02 | ILLINOIS DEPARTMENT OF TRANSPORTATION | Department of Transportation | $59,084,598 | PROJECT TITLE: BRIDGE REPLACEMENT AND INTERCHANGE RECONSTRUCTION ON I-80 AT CENTER STREET IN JOLIET. :::: PROJECT DESCRIPTION: BRIDGE REPLACEMENT AND INTERCHANGE RECONSTRUCTION ON I-80 AT CENTER STREET IN JOLIET. | transportation |
| 2026-05-04 | ALABAMA DEPARTMENT OF TRANSPORTATION | Department of Transportation | $58,584,354 | PROJECT TITLE: ADD LANES ON SR-7 (US-11) FROM DAIMLER BENZ BOULEVARD TO THE INTERSECTION OF SR-5 ALONG THE NORFOLK SOUTHERN RAILROAD :::: PROJECT DESCRIPTION: ADD LANES ON SR-7 (US-11) FROM DAIMLER BENZ BOULEVARD TO THE INTERSECTION OF SR-5 ALONG THE NORFOLK SOUTHERN RAILROAD | transportation |
| 2026-04-02 | TEXAS DEPARTMENT OF TRANSPORTATION | Department of Transportation | $58,447,610 | PROJECT TITLE: WIDEN ROAD - ADD LANES ON US 77 :::: PROJECT DESCRIPTION: US 77 FROM LEE COUNTY LINE TO SH 71. ADD 2 LANES TO CONVERT TO A 2 LANE TO A 4 LANE DIVIDED FACILITY INCLUDING WIDEN PAVEMENT, MEDIAN CONSTRUCTION, REALIGN OF ROADWAY, PLACEMENT OF ASPHALTIC CONCRETE PAVEMENT, UPGRADE STANDARD, AND PROPOSED DRAINAGE MODIFICATIONS. | transportation |
| 2026-03-03 | STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION | Department of Transportation | $58,365,654 | PROJECT TITLE: I-275/SR 93 FROM N OF I-4 TO N OF MLK;ADD LANES & RECONSTRUCT;CONSTRUCTION :::: PROJECT DESCRIPTION: I-275/SR 93 FROM N OF I-4 TO N OF MLK;ADD LANES & RECONSTRUCT;CONSTRUCTION | transportation |
| 2026-05-04 | TRANSPORTATION, NEW JERSEY DEPT OF | Department of Transportation | $58,343,032 | PROJECT TITLE: RT. 9, INDIAN HEAD RD. TO CENTRAL AVE/HURLEY AVE., M.P. 95.01 TO 101.89, TOMS RIVER & LAKEWOOD TWPS.,OCEAN CO.,HWY RECONSTRUCTION PROJECT,CONSTRUCTION :::: PROJECT DESCRIPTION: RT. 9, INDIAN HEAD RD. TO CENTRAL AVE/HURLEY AVE., M.P. 95.01 TO 101.89, TOMS RIVER & LAKEWOOD TWPS., OCEAN COUNTY, HIGHWAY RECONSTRUCTION PROJECT, CONSTRUCTION | transportation |
| 2026-04-17 | TRANSPORTATION NORTH CAROLINA DEPARTMENT | Department of Transportation | $58,223,830 | PROJECT TITLE: EASTERN WAKE FREEWAY I-40 TO THE US 64-264 BYPASS :::: PROJECT DESCRIPTION: EASTERN WAKE FREEWAY I-40 TO THE US 64-264 BYPASS | transportation |
| 2026-04-02 | ILLINOIS DEPARTMENT OF TRANSPORTATION | Department of Transportation | $57,981,195 | PROJECT TITLE: PAVEMENT RECONSTRUCTION AND CULVERT REPLACEMENT ON I-80 FROM RIDGE RD TO RIVER RD :::: PROJECT DESCRIPTION: PAVEMENT RECONSTRUCTION AND CULVERT REPLACEMENT ON I-80 FROM RIDGE RD TO RIVER RD | transportation |
| 2026-04-15 | GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC. | Department of Transportation | $57,959,240 | EACH DELIVERY AND/OR TASK ORDER WILL OBLIGATE FUNDING FOR SERVICES ORDERED UNDER THIS CONTRACT. TAS::69 1301::TAS | transportation |
| 2026-04-17 | OHIO DEPARTMENT OF TRANSPORTATION | Department of Transportation | $57,950,323 | PROJECT TITLE: CUY IR 090 16.28 CCG3A :::: PROJECT DESCRIPTION: IR-90 IN THE CENTRAL INTERCHANGE FROM E.9TH TO CARNEGIE; INCLUDES CARNEGIE OVERHEAD BRIDGE. CUYAHOGA COUNTY. | transportation |
| 2026-02-18 | DEPARTMENT OF TRANSPORTATION CALIFORNIA | Department of Transportation | $57,820,940 | PROJECT TITLE: KERN COUNTY NEAR WHEELER RIDGE FROM 0.8 MILE SOUTH OF ROUTE 5/99 SEPARATION TO 0.3 MILE NORTH OF OLD US 99 OVERCROSSING REPLACE CONCRETE PAVEMENT LAN :::: PROJECT DESCRIPTION: KERN COUNTY NEAR WHEELER RIDGE FROM 0.8 MILE SOUTH OF ROUTE 5/99 SEPARATION TO 0.3 MILE NORTH OF OLD US 99 OVERCROSSING REPLACE CONCRETE PAVEMENT LANES WITH CONTINUOUSLY REINFORCED CONCRETE PAVEMENT. | transportation |
| 2026-05-12 | NOBLIS, INC. | Department of Transportation | $57,792,648 | IGF::OT::IGF EPICS LARGE CONTRACT # DTFAWA-17-D-00015 ON TASK ORDER # 0003 | aerospace |
| 2026-04-29 | HARRIS CORPORATION | Department of Transportation | $57,582,359 | CLIN: 5001MW, FTI-MW SUPPORT SERVICES, FIXED PRICE. TASK ORDER: N/A. ADD FUNDING TO HARRIS/FTI FOR CONTRACT SUPPORT START UP COSTS FOR FTI MICROWAVE SERVICES NETWORK. DTFA01-02-D-03006/0012 - HARRIS. POP: 05/31 - 07/30/2007. SPEND PLAN: 07-AJW5300-0002. NATIONAL PROJECT CODE: 25610557. CIP# N/A. PR EXPLANATION: PROJECT CREATED AS EXPENSE, NO CAPITAL ASSETS. | transportation |
| 2026-03-18 | TRANSPORTATION, VERMONT AGENCY OF | Department of Transportation | $57,215,031 | PROJECT TITLE: BURLINGTON, SO. CONN., I-189 INTERCHG. W&N, CONSTR. NEW HIGHWAY :::: PROJECT DESCRIPTION: BURLINGTON, SO. CONN., I-189 INTERCHG. W&N, CONSTR. NEW HIGHWAY. | transportation |
| 2026-03-18 | TEXAS DEPARTMENT OF TRANSPORTATION | Department of Transportation | $57,086,027 | PROJECT TITLE: RIGHT OF WAY ACTIVITIES INCLUDING AQUISITION AND ADJUSTMENTS ON US 59. :::: PROJECT DESCRIPTION: US 59 FROM 0.93 MILES SOUTH OF UNIVERSITY BOULEVARD TO 0.51 MILES SOUTH OF SHILOH DRIVE. RIGHT OF WAY ACTIVITIES INCLUDING AQUISITION AND ADJUSTMENTS ON US 59. | transportation |
| 2026-03-18 | ALASKA DEPARTMENT OF TRANSPORTATION & PUBLIC FACILITIES | Department of Transportation | $57,020,234 | PROJECT TITLE: DALTON HWY MP 289-305 REHABILITATION :::: PROJECT DESCRIPTION: REV 8/2017REHABILITATE AND WIDEN THE DALTON HIGHWAY BETWEEN MILEPOSTS 289 AND 305. PROJECT WORK WILL INCLUDE MINOR REALIGNMENTS, GRADE RAISES, TURNOUTS, ROADSIDE HARDWARE AND DRAINAGE IMPROVEMENTS. | transportation |
| 2026-03-03 | THE STATE OF HAWAII DEPARTMENT OF TRANSPORTATION | Department of Transportation | $56,744,449 | PROJECT TITLE: HON STATE - ASPHALT PAVEMENT PRESERVATION, RESURFACING, AND RECONSTRUCTION AT VARIOUS LOCATIONS, OAHU (CON) :::: PROJECT DESCRIPTION: PAVEMENT PRESERVATION, RESURFACING AND RECONSTRUCTION ON VARIOUS OAHU STATE ROUTES - IDIQ PROJECT | transportation |
| 2026-04-06 | ADVANCED MANAGEMENT TECHNOLOGY, INC. | Department of Transportation | $55,535,451 | TESTING REQ AND SOL | aerospace |
| 2026-03-18 | NOBLIS, INC. | Department of Transportation | $55,532,371 | IGF::OT::IGF NOBLIS ENGINEERING SUPPORT VIA EPICS UNRESTRICTED CONTRACT DTFAWA-17-D-00014 | aerospace |
| 2026-02-20 | FREQUENTIS USA, INC | Department of Transportation | $55,417,418 | BASE PERIOD SUPPORT SERVICES AND SUPPLIES FOR THE AIR=TO-GROUND PROTOCOL CONVERTER SYSTEM (APCS) TO INCLUDE IFAT AND FAT. | aerospace |
| 2026-04-09 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Transportation | $55,258,933 | IGF::OT::IGF NORTHRUP GRUMMAN MISSION SYSTEMS (NGMS)SUPPORT FOR RAPID DEPLOYMENT VOICE SWITCH IIA (RDVS IIA), ENHANCED TERMINAL VOICE SWITCH (ETVS) OR SMALL TOWER VOICE SWITCH (STVS). | transportation |
| — | TRANSPORTATION, NEW JERSEY DEPT OF | Department of Transportation | $54,891,468 | PROJECT TITLE: RT 18 EAST BRUNSWICK, MP 35.4-39.54, EAST BRUNSWICK, MIDDLESEX COUNTY, DRAINAGE & PAVEMENT REHABILITATION PROJECT, CONSTRUCTION :::: PROJECT DESCRIPTION: RT 18 EAST BRUNSWICK, MP 35.4-39.54, EAST BRUNSWICK, MIDDLESEX COUNTY, DRAINAGE & PAVEMENT REHABILITATION PROJECT, CONSTRUCTION | transportation |
| — | TRANSPORTATION NORTH CAROLINA DEPARTMENT | Department of Transportation | $54,742,160 | PROJECT TITLE: MINOR WIDENING - RANDOLPH COUNTY :::: PROJECT DESCRIPTION: US 64 FROM ASHEBORO BYP TO E OF I-73, I-74, & US 220; RECONSTRUCT INTERCHANGE AT NC 49; REPLACE BRIDGE 750171 OVER US 64 & NC 49; RECONSTRUCT/MODIFY INTERCHANGE | transportation |
| 2026-05-08 | TEXTRON AVIATION INC | Department of Transportation | $54,724,805 | 18 BEECHCRAFT AIRCRAFT FOR FLIGHT PROGRAM OPERATIONS (AJF) THE TOTAL ESTIMATED POTENTIAL VALUE (TEPV) IS ESTABLISHED AT AN AMOUNT OF $282.6M. FUNDING WILL BE OBLIGATED UPON THE EXECUTION OF TASK ORDERS (TOS) | transportation |
| 2026-05-19 | DEPARTMENT OF TRANSPORTATION CALIFORNIA | Department of Transportation | $54,329,324 | PROJECT TITLE: LOS ANGELES COUNTY, RTE 047, PM 0.4R/2.1. IN THE CITY OF LOS ANGELES, NEAR THE PORT OF LONG BEACH, AT VINCENT THOMAS BRIDGE NO. 53-1471. REPLACE BRID :::: PROJECT DESCRIPTION: ON STATE ROUTE: 47. LOS ANGELES COUNTY, RTE 047, PM 0.4R/2.1. IN THE CITY OF LOS ANGELES, NEAR THE PORT OF LONG BEACH, AT VINCENT THOMAS BRIDGE NO. 53-1471. REPLACE BRIDGE DECK AND SEISMIC SENSORS. THIS IS A CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CMGC) PROJECT. REPLACE BRIDGE DECK AND SEISMIC SENSORS. | transportation |
| — | TRANSPORTATION, NEW JERSEY DEPT OF | Department of Transportation | $53,906,056 | PROJECT TITLE: RT 20, MP 0.0-3.97, CITY OF PATERSON & CLIFTON, PASSAIC COUNTY, SAFETY, DRAINAGE & RESURFACING PROJECT, CONSTRUCTION :::: PROJECT DESCRIPTION: RT 20, MP 0.0-3.97, CITY OF PATERSON & CLIFTON, PASSAIC COUNTY, SAFETY, DRAINAGE & RESURFACING PROJECT, CONSTRUCTION | transportation |
| 2026-04-28 | KARSUN SOLUTIONS LLC | Department of Transportation | $53,877,280 | SOLUTION ARCHITECTURE DESIGN AND BUILD TECHNICAL SUPPORT SERVICES. IGF::OT::IGF | aerospace |
| 2026-05-19 | TEXAS DEPARTMENT OF TRANSPORTATION | Department of Transportation | $53,493,892 | PROJECT TITLE: WIDEN ROAD-ADD LANES ON SL 1604 FROM IH 10 TO US 281. :::: PROJECT DESCRIPTION: SL 1604 FROM IH 10 TO US 281. WIDEN ROAD - ADD LANES. | transportation |
| 2026-03-18 | NOBLIS, INC. | Department of Transportation | $53,430,126 | IGF::OT::IGF | aerospace |
| 2026-05-14 | BROWARD, COUNTY OF | Department of Transportation | $53,357,402 | AWARD PURPOSE THE PROJECT INCLUDES THE PURCHASE OF TWO TIER 4 DIESEL REACH STACKERS 12 HYBRID PICK UP TRUCKS 14 TIER 4 YARD TRUCKS 11 TIER4 DIESEL TOP HANDLERS ONE WITH OVER HEIGHT SPREADER ONE TIER 4 DIESEL TOP HANDLER WITH LIMITED CAPACITY FOR HANDLING EMPTY CONTAINERS ONE TIER 4 FORKLIFT 12 5 TON CAPACITY 25 LIQUEFIED PETROLEUM GAS LPG TERMINAL TRACTORS REEFER RACKS TOTALING 192 SLOTS TWO HYBRID RUBBER TIRED GANTRY RTG CRANES WITH TWO SPARE SPREADERS AND ONE SPREADER TESTING BENCH. THE PROJECT ALSO INCLUDES PORT AND MARITIME MODERNIZATION PLANS ELECTRICAL SYSTEM UPGRADES AND ASSOCIATED CIVIL WORKS TO SUPPORT INCREASED TERMINAL POWER DEMAND HIGH MAST LIGHTING, OPTICAL CHARACTER RECOGNITION OCR AT THE CROWLEY TERMINAL GATE TWO CONCRETE RTG RUNS ONE MAINTENANCE SAFETY EQUIPMENT AND WASH STATION AND TWO PLUG IN STATIONS FOR THE HYBRID RTGS WHILE AT REST AT THE PORT EVERGLADES TERMINAL PET. ACTIVITIES TO BE PERFORMED COMPONENT 1 CROWLEY PROJECT ADMINISTRATION GRANT ADMINISTRATION AND FEES THROUGHOUT PROJECT LIFE CYCLE PORT AND MARITIME MODERNIZATION PLAN EQUIPMENT PURCHASE 2 REACH STACKERS TIER4 DIESEL 12 HYBRID PICK UP TRUCKS 14 TIER 4 YARD TRUCKS 4 TIER 4 DIESEL TOP HANDLERS CONSTRUCTION AND CIVIL WORK REEFER RACK CONSTRUCTION CONSTRUCT REEFER RACKS SUPPORTING 192 PLUGS TOTAL. ELECTRICAL UPGRADES ELECTRICAL SYSTEM UPGRADES SUCH AS NEW ELECTRIC UTILITY SUBSTATION CONSTRUCTION 24 HIGH MAST LIGHTING 2 OPTICAL CHARACTER RECOGNITION OCR PORTALS INFRASTRUCTURE WILL INCLUDE THE PORTAL STRUCTURE FOUNDATION AND CONNECTION TO TERMINAL ELECTRIC AND DATA SYSTEMS. COMPONENT 2 PORT EVERGLADES TERMINAL PROJECT ADMINISTRATION GRANT ADMINISTRATION AND FEES THROUGHOUT PROJECT LIFE CYCLE PORT AND MARITIME MODERNIZATION PLAN EQUIPMENT PURCHASE 7 TIER 4 STAGE 5 TOP HANDLERS ONE WITH OVER HEIGHT SPREADER 1 TIER 4 STAGE 5 TOP HANDLER WITH LIMITED CAPACITY FOR HANDLING EMPTY CONTAINERS 1 TIER4 DIESEL FORKLIFT 12 5 TON CAPACITY2 5 LIQUEFIED PETROLEUM GAS LPG TERMINAL TRACTORS2 DELIVERABLES EXPECTED OUTCOMES FROM SCHEDULE G PAGE 12 OF THE GRANT AGREEMENT MEASURE CARGO VOLUME. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS AND OPPORTUNITY TOTAL TONS OF CARGO MOVED PER YEAR TEUS OR SHORT TONS. CARGO VOLUME MEASURES THE MOVEMENT OF FREIGHT THROUGH THE PROJECT STUDY AREA. WHEN APPLICABLE, REPORT THE TOTAL CARGO VOLUME AND THE VOLUME DISAGGREGATED BY TYPE OF FREIGHT IE CONTAINERS IN TEU AND BULK IN TONS OR TYPE OF INTERMODAL TRANSPORT (TRUCK OR RAIL. FREQUENCY QUARTERLY. MEASURE REPORTABLE EVENTS. CATEGORY AND DESCRIPTION SAFETY QUALITY OF LIFE TOTAL NUMBER OF REPORTABLE EVENTS PER YEAR. A REPORTABLE EVENT IS DEFINED AS A SAFETY OR SECURITY EVENT OCCURRING IN THE PROJECT STUDY AREA TERMINAL BERTH ETC THAT RESULTS IN ONE OR MORE OF THE FOLLOWING CONDITIONS A FATALITY CONFIRMED WITHIN 30 DAYS OF THE EVENT AN INJURY REQUIRING IMMEDIATE MEDICAL ATTENTION AWAY FROM THE SCENE FOR ONE OR MORE PERSON PROPERTY DAMAGE EQUAL TO OR EXCEEDING 25000 COLLISIONS INVOLVING VEHICLES OR VESSELS AN EVACUATION FOR LIFE SAFETY REASONS. FREQUENCY QUARTERLY. INTENDED BENEFICIARY BROWARD COUNTY OF SUBRECIPIENT ACTIVITIES NONE. INTENDED BENEFICIARY BROWARD COUNTY OF SUBRECIPIENT ACTIVITIES NONE. | transportation |
| 2026-04-15 | REGULUS GROUP, LLC | Department of Transportation | $52,673,094 | SURVEILLANCE ACQUISITION SUSTAINMENT PROGRAM SUPPORT AJM 41 | aerospace |
| 2026-03-11 | ROBINSON AVIATION (RVA), INC. | Department of Transportation | $52,670,037 | THE FCT CONTRACT ENCOMPASSES THE SCOPE OF ATC SERVICES AND ASSOCIATED SUPPORT SERVICES REQUIRED FOR THE DAY-TO-DAY OPERATION OF FCTS AS DEFINED IN THE STATEMENT OF WORK (SOW). | transportation |
| 2026-05-19 | OREGON DEPARTMENT OF TRANSPORTATION | Department of Transportation | $52,413,347 | PROJECT TITLE: US97 AND US20 BEND NORTH CORRIDOR :::: PROJECT DESCRIPTION: REALIGN US97 INCLUDING BRIDGE OVERPASSES, INTERSECTION IMPROVEMENTS AT US97 AND COOLEY RD., US20 AND COOLEY RD., AND US20 AND ROBAL RD. THESE IMPROVEMENTS WILL REDUCE HIGH SEVERITY CRASHES AND IMPROVE US97 OPERATIONS. PROJECT ALSO INCLUDES OTHER MISCELLANEOUS IMPROVEMENTS INCLUDING PEDESTRIAN IMPROVEMENTS, BRIDGE DECK OVERLAYS, PAVEMENT PRESERVATION, AND ADA UPGRADES. | transportation |
| 2026-02-23 | KALLIDUS TECHNOLOGIES, INC | Department of Transportation | $52,132,951 | SAMUELS HALL RENOVATION PROJECT CONTRACT AWARD | transportation |
| 2026-05-19 | TEXAS DEPARTMENT OF TRANSPORTATION | Department of Transportation | $51,555,255 | PROJECT TITLE: CONVERT FROM NON-FREEWAY TO FREEWAY ON US 77 :::: PROJECT DESCRIPTION: US 77 FROM FM 1356 TO CR 2130. CONVERT NON-FREEWAY TO FREEWAY. | transportation |