Database / Awards
Federal awards
Every contract and grant ingested from USAspending.gov. Pick an agency to narrow the list; toggle Highest / Lowest to sort. Click any row to open the full award profile.
Sort by
Agency: National Aeronautics and Space AdministrationStatus: Currently active
Results
207 awards
Showing 151–200
| Action date | Recipient | Agency | Amount | Description | Sector |
|---|---|---|---|---|---|
| 2026-02-19 | LOCKHEED MARTIN CORP | National Aeronautics and Space Administration | $74,000,000 | NASA GSFC GEOSTATIONARY EXTENDED OBSERVATIONS (GEOXO) LIGHTNING MAPPER (LMX) INSTRUMENT IMPLEMENTATION. THE LMX INSTRUMENT IS A SINGLE SPECTRAL CHANNEL INSTRUMENT USED TO MEASURE THE LOCATION AND INTENSITY OF OPTICAL TRANSIENTS PRODUCED BY LIGHTNING. | aerospace |
| 2026-05-06 | SOUTHWEST RESEARCH INSTITUTE | National Aeronautics and Space Administration | $72,431,168 | IGF::CL,CT::IGF LUCY IS A PLANNED NASA SPACE PROBE THAT WILL TOUR FIVE JUPITER TROJANS, ASTEROIDS WHICH SHARE JUPITER'S ORBIT AROUND THE SUN, ORBITING EITHER AHEAD OF OR BEHIND THE PLANET AND ONE MAIN BELT ASTEROID. ALL TARGET ENCOUNTERS WILL BE FLY-BY ENCOUNTERS. | aerospace |
| 2026-02-13 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $72,289,718 | ADVANCED EARTH SCIENCE MISSION CONCEPT STUDIES - SMD 83-11311 | aerospace |
| 2026-02-17 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $71,725,228 | ENVIRONMENTAL MONITORING FOR LONG DURATION EXPLORATION (EMLDE) 47-17229 | aerospace |
| 2026-05-05 | UNIVERSITY OF MARYLAND, COLLEGE PARK | National Aeronautics and Space Administration | $67,019,166 | THE GODDARD CENTER FOR RESEARCH AND EXPLORATION IN SPACE SCIENCE AND TECHNOLOGY (CRESSTII) WILL CARRY OUT OBSERVATIONAL EXPERIMENTAL AND THEORETICAL RESEARCH IN SUPPORT OF NASA. | aerospace |
| 2026-03-31 | REGENTS OF THE UNIVERSITY OF CALIFORNIA, THE | National Aeronautics and Space Administration | $66,734,963 | ESCAPE AND PLASMA ACCELERATION AND DYNAMICS EXPLORERS (ESCAPADE) MISSION -.PHASE A CONCEPT STUDY. | aerospace |
| 2026-04-21 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $65,615,386 | SUNRISE: SUN RADIO INTERFEROMETER SPACE EXPERIMENT | aerospace |
| 2026-05-11 | MCCALLIE ASSOCIATES, INC. | National Aeronautics and Space Administration | $63,135,880 | MISSION SYSTEMS ENGINEERING AND PAYLOAD AND INSTRUMENT SYSTEMS ENGINEERING SERVICES AS WELL AS GUIDANCE, NAVIGATION, AND CONTROL SYSTEMS SERVICES, WHICH INCLUDES GUIDANCE, NAVIGATION AND CONTROL (GN&C) SYSTEMS ENGINEERING AND ATTITUDE CONTROL SYSTEMS | aerospace |
| 2026-04-29 | ASRC FEDERAL SYSTEM SOLUTIONS LLC | National Aeronautics and Space Administration | $62,666,685 | RESEARCH FACILITIES AND ENGINEERING SUPPORT SERVICES (RF&ESS) | aerospace |
| 2026-04-29 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $62,442,911 | PRODUCTION SYSTEM: DATA PRODUCTS (SNWG 18-2, SNWG 18-4, SNWG 18-5) IN SUPPORT OF SATELLITE NEEDS WORKING GROUP (SNWG) 2018-2019 (83-108220) | aerospace |
| 2026-04-02 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $59,282,570 | ORBITING CARBON OBSERVATORY-3 85-16363 | aerospace |
| 2026-04-07 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $59,216,856 | RESEARCH AND ANALYSIS (R&A), EARTH SCIENCE ATMOSPHERIC COMPOSITION | weather-climate |
| 2026-04-01 | THE REGENTS OF THE UNIVERSITY OF COLORADO | National Aeronautics and Space Administration | $58,862,222 | EXTREME ULTRAVIOLET VARIABILITY EXPERIMENT (EVE) FOR THE SOLAR DYNAMICS OBSERVATORY(SDO) | aerospace |
| 2026-04-20 | BAY AREA ENVIRONMENTAL RESEARCH INSTITUTE | National Aeronautics and Space Administration | $58,585,443 | APPLICATION FOR A RENEWAL OF THE ARC-CREST COOPERATIVE AGREEMENT.#NNX12AD05A | weather-climate |
| 2026-02-27 | FIREFLY AEROSPACE INC | National Aeronautics and Space Administration | $57,536,920 | COMMERCIAL LUNAR PAYLOAD SERVICES (CLPS) CONTRACT TASK ORDER CS-6. | aerospace |
| 2026-04-30 | MINBURN TECHNOLOGY GROUP, LLC | National Aeronautics and Space Administration | $57,226,320 | THIS TASK ORDER IS FOR MICROSOFT M365 G5 LICENSES PER ATTACHED QUOTE # MTG-NASA-MIC-05249 DATED 04/23/2025. THE TASK ORDER INCORPORATES FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT. | other |
| — | UNIVERSITY OF MARYLAND, COLLEGE PARK | National Aeronautics and Space Administration | $55,252,567 | SOLE SOURCE COLLABORATIVE EARTH SYSTEM SCIENCE RESEARCH BETWEEN NASA/GSFC AND UMD/ESSIC | aerospace |
| 2026-04-15 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $55,066,077 | EXOPLANET EXPLORATION (EXEP) PROGRAM OFFICE (73-108020) | aerospace |
| 2026-04-30 | UTAH STATE UNIVERSITY SPACE DYNAMICS LABORATORY | National Aeronautics and Space Administration | $55,057,450 | THE ATMOSPHERIC WAVES EXPERIMENT (AWE) IS PROPOSED BY THE UTAH STATE UNIVERSITY RESEARCH FOUNDATION (USURF) IN RESPONSE TO NASAS 2016 HELIOPHYSICS EXPLORERS MISSION OF OPPORTUNITY ANNOUNCEMENT NNH12ZDA005O-HPEXMO. THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY USURF DURING THE PHASE A (AWE) CONCEPT STUDIES. USURF SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE AWE PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE. 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED AWE INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE AWE INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE AWE SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.USURF SHALL PROVIDE A BRIEFING ON THE AWE SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. USURF SHALL PROVIDE AN ORGANIZATION CHART DEFINING USURF ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE USURF PI PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE.. USURF SHALL DEVELOP A AWE INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A AWE MISSION SYSTEMS REQUIREMENTS DOCUMENT. USURF SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. USURF SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. USURF SHALL LEAD THE SCIENCE TEAM. USURF SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. | aerospace |
| 2026-04-13 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $52,967,959 | RESEARCH AND ANALYSIS (R&A), SOLID EARTH AND NATURAL HAZARDS SCIENCES AND APPLICATIONS | environment |
| 2026-04-04 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $52,797,417 | UNINHABITED AERIAL VEHICLE SYNTHETIC APERTURE RADAR OPERATIONS (UAVSAR) 87-12820 | aerospace |
| 2026-04-17 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $52,611,979 | JPL PLANETARY DATA SYSTEMS (PDS) NODES AND SUB-NODES (93-109847) | aerospace |
| 2026-05-12 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $52,344,747 | NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS). | aerospace |
| 2026-04-17 | NOVA SPACE SOLUTIONS, LLC | National Aeronautics and Space Administration | $52,178,912 | THIS COSMIC TASK ORDER IS CREATED FOR FUNDING OF THE COST-PLUS-INCENTIVE-FEE CLIN 9002 OF 80SSC025D0001. | aerospace |
| — | SAN JOSE STATE UNIVERSITY RESEARCH FOUNDATION | National Aeronautics and Space Administration | $51,127,912 | HUMAN SYSTEMS INTEGRATION: COLLABORATIVE HUMAN FACTORS RESEARCH TO IMPROVE THE SAFETY EFFICIENCY AND RELIABILITY OF NASAS AERONAUTICS AND SPACE MISSIONS: PHASE 2 | aerospace |
| 2026-03-19 | TECHTRANS INTERNATIONAL INC | National Aeronautics and Space Administration | $50,780,512 | RUSSIAN LANGUAGE AND LOGISTICS SERVICES. | aerospace |
| 2026-03-23 | AGILE DECISION SCIENCES, LLC | National Aeronautics and Space Administration | $50,055,027 | NRESS-II MANAGEMENT AND IT SUPPORT | aerospace |
| 2026-05-12 | TRAX INTERNATIONAL CORPORATION | National Aeronautics and Space Administration | $48,352,826 | GODDARD LOGISTICS SERVICES CONTRACT - THE PRINCIPAL PURPOSE OF THIS REQUIREMENT IS TO SUPPORT NASA GSFC LOGISTICS MANAGEMENT NEEDS IN ORDER TO MEET EARTH SCIENCE, SPACE SCIENCE, AND EXPLORATION MISSION REQUIREMENTS. | aerospace |
| 2026-04-28 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $47,441,104 | RESEARCH AND ANALYSIS (R&A), EARTH SYSTEM MODELING AND ANALYSIS | weather-climate |
| 2026-04-28 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $47,243,584 | RESEARCH AND ANALYSIS (R&A), TERRESTRIAL ECOLOGY AND CARBON CYCLE SCIENCE | environment |
| 2026-05-11 | INTUITIVE MACHINES, LLC | National Aeronautics and Space Administration | $46,831,892 | CLPS TASK ORDER CT-4 PAYLOADS AND RESEARCH INVESTIGATIONS ON THE SURFACE OF THE MOON. | aerospace |
| 2026-03-31 | ARIZONA STATE UNIVERSITY | National Aeronautics and Space Administration | $45,529,122 | IGF::CL,CT::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL | aerospace |
| 2026-03-17 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $44,739,547 | VOYAGER INTERSTELLAR MISSION (VIM) 70-5159 | aerospace |
| 2026-04-29 | GENERAL ATOMICS | National Aeronautics and Space Administration | $44,338,789 | TO PROVIDE SPACECRAFT DEVELOPMENT & TEST OBSERVATORY I&T OBSERVATORY TESTING SHIPMENT TO THE LAUNCH SITE SUPPORT OF LAUNCH OPERATIONS ON-ORBIT PERFORMANCE VERIFICATION OPERATION OF MISSION OPERATIONS CENTER, 3 YEARS MISSION OPS&DECOMMISSIONING. | aerospace |
| 2026-03-04 | ENERGY SYSTEMS GROUP, LLC | National Aeronautics and Space Administration | $44,042,444 | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT | energy |
| 2026-04-27 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $42,399,309 | MARS TECHNOLOGY DEVELOPMENT 60-17814 | aerospace |
| 2026-03-30 | THE REGENTS OF THE UNIVERSITY OF COLORADO | National Aeronautics and Space Administration | $42,384,322 | SUPPORT FOR THE SNOW AND ICE DISTRIBUTED ACTIVE ARCHIVE CENTER (DAAC) FOR THE EARTH OBSERVING SYSTEM DATA AND INFORMATION SYSTEM (EOSDIS) | aerospace |
| 2026-05-06 | SOUTHWEST RESEARCH INSTITUTE | National Aeronautics and Space Administration | $42,056,990 | DEVELOPMENT OF THE QUICKSOUNDER SC AND THE QUICKSOUNDER SATELLITE, INTEGRATION OF THE ATMS EDU, SHIPMENT TO THE LAUNCH SITE SUPPORT OF LAUNCH OPS & SATELLITE ACTIVATION, 3 YRS OF MISSION OPS & PERFORM DECOMMISSIONING OPERATION | aerospace |
| 2026-03-17 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $40,125,123 | THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH. | aerospace |
| 2026-02-13 | KINETX INC | National Aeronautics and Space Administration | $40,064,053 | THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | aerospace |
| 2026-05-12 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $39,681,776 | OFFICE OF EARTH SCIENCE RESEARCH AND ANALYSIS APPLICATIONS PROGRAM FY 2004 THROUGH FY 2008 | aerospace |
| 2026-03-14 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $39,422,806 | PREFIRE (POLAR RADIANT ENERGY IN THE FAR INFRARED EXPERIMENT THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. | aerospace |
| 2026-04-07 | THE REGENTS OF THE UNIVERSITY OF COLORADO | National Aeronautics and Space Administration | $39,100,299 | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. | aerospace |
| 2026-04-24 | A & H-AMBICA JV LLC | National Aeronautics and Space Administration | $38,817,184 | THIS IS THE SECOND PHASE OF A MULTI-PHASE PROJECT. PHASE 2 CONSISTS OF THE REMOVAL AND REPLACEMENT.OF THE EXISTING ROOFING SYSTEM IN THE NORTHEAST QUADRANT OF BUILDING 103. | aerospace |
| 2026-03-23 | YULISTA SOLUTIONS, LLC | National Aeronautics and Space Administration | $38,607,403 | CHARLES CONTRACT TO PROVIDE SUPPORT FOR AIRCRAFT AT LARC. INCLUDES AIRCRAFT MAINTENANCE, FLIGHT OPERATIONS, ENGINEERING, LIFECYCLE, QUALITY, SAFETY, AND OTHER RELATED SUPPORT FOR A VARIETY OF AIRFRAMES, ENGINES, APPLIANCES, AND SUPPORT EQUIPMENT | aerospace |
| 2026-04-20 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $38,474,548 | ECOSYSTEMS SPACEBORNE THERMAL RADIOMETER EXPERIMENTS ON SPACE STATION (ECOSTRESS) 87-19641 | aerospace |
| 2026-04-01 | AMENTUM TECHNOLOGY, INC. | National Aeronautics and Space Administration | $38,473,500 | IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 3 (ENGINEERING). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR); CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED AIR, ELECTRICAL POWER DISTRIBUTION, POTABLE WATER); TECHNOLOGY DEVELOPMENT/ADMINISTRATION (E.G., FACILITY AUTOMATION SYSTEMS [FAS], DATA ACQUISITION SYSTEMS [DAS]); RESEARCH AND INSTITUTIONAL FACILITY MAINTENANCE (E.G., PREVENTIVE MAINTENANCE, TROUBLE CALLS, RELIABILITY CENTERED MAINTENANCE [RCM], FACILITY CONDITION ASSESSMENT [FCA]); AND FACILITY ENGINEERING (E.G., DESIGN, CONSTRUCTION, CONFIGURATION MANAGEMENT, TACTICAL ENGINEERING, PRESSURE SYSTEM RECERTIFICATION, PROJECT MANAGEMENT/PLANNING SUPPORT). | aerospace |
| 2026-03-24 | SOUTHWEST RESEARCH INSTITUTE | National Aeronautics and Space Administration | $38,048,480 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE | aerospace |
| 2026-03-16 | SOUTHWEST RESEARCH INSTITUTE | National Aeronautics and Space Administration | $37,955,490 | PHASE A/B DEVELOPMENT OF THE JUICE ULTRAVIOLET SPECTROGRAPH IGF::CT,CL::IGF THE EUROPEAN SPACE AGENCY SELECTED THE JUPITER ICY MOONS EXPLORER (JUICE) MISSION AS THE FIRST MISSION IN ITS LARGE-CLASS MISSION PORTFOLIO UNDER THE COSMIC VISION PROGRAM. THE JUICE MISSION WILL INVESTIGATE JUPITER AND ITS ICY MOONS, COMPLETING ITS MISSION BY ORBITING GANYMEDE. THE MISSION IS PLANNED FOR LAUNCH IN 2022. THE NASA SCIENCE MISSION DIRECTORATE (SMD) HAS OFFERED TO COLLABORATE IN THIS MISSION. IN 2012, NASA ISSUED PROGRAM ELEMENT APPENDIX (PEA) K AS AN APPENDIX OF THE SECOND STAND ALONE MISSIONS OF OPPORTUNITY NOTICE (SALMON-2)(NNH12ZDA006O-JUICE) ANNOUNCEMENT OF OPPORTUNITY (AO)(NNH12ZDA006O) FOR THE PURPOSE OF SOLICITING PROPOSALS FOR JUICE MISSION OF OPPORTUNITY (MO) INVESTIGATIONS TO BE MANAGED UNDER THE NASA NEW FRONTIERS PROGRAM. THE JUICE ULTRAVIOLET IMAGING SPECTROGRAPH (JUICE-UVS) IS A COMPLETE, STAND-ALONE INSTRUMENT PROPOSED AND SELECTED UNDER THE SALMON-2 AO, TO BE INCLUDED IN THE ESA JUICE PAYLOAD AS PART OF NASAS U.S. CONTRIBUTION, AND DEVELOPED BY THE SOUTHWEST RESEARCH INSTITUTE (SWRI) IN SAN ANTONIO, TX. THE LEADER OF THE JUICE-UVS TEAM IS THE PRINCIPAL INVESTIGATOR (PI), DR. RANDY GLADSTONE OF SWRI. THE GOALS OF THE JUICE-UVS INVESTIGATION ARE TO: 1) EXPLORE THE ATMOSPHERES, PLASMA INTERACTIONS, AND SURFACES OF THE GALILEAN SATELLITES; 2) DETERMINE THE DYNAMICS, CHEMISTRY, AND VERTICAL STRUCTURE OF JUPITERS UPPER ATMOSPHERE, FROM EQUATOR TO POLE, AS A TEMPLATE FOR GIANT PLANETS EVERYWHERE; AND 3) INVESTIGATE THE JUPITER-IO CONNECTION BY QUANTIFYING ENERGY AND MASS FLOW IN THE IO ATMOSPHERE, NEUTRAL CLOUDS, AND TORUS. THESE GOALS ARE CLOSELY ALIGNED TO THOSE DESCRIBED IN THE JUICE ASSESSMENT STUDY REPORT, AND ARE CONSISTENT WITH NASA GOALS IN THE MOST RECENT PLANETARY DECADAL SURVEY, THE EJSM STUDY REPORT, AND SMDS FORMAL GOALS DOCUMENTS. | aerospace |
| 2026-04-07 | THE REGENTS OF THE UNIVERSITY OF COLORADO | National Aeronautics and Space Administration | $37,239,061 | PROVIDE ENGINEERING ANALYSES, HARDWARE & SOFTWARE DEVELOPMENT, FABRICATION, INTEGRATION, TEST, EVALUATION, INTEGRATION WITH SPACECRAFT, LAUNCH, INSTRUMENT ACTIVATION, CALIBRATION, VALIDATION, & OPERATIONS THROUGH 60-DAY CHECKOUT FOR TSIS2 PAYLOAD. | aerospace |
Page 4 of 5